Installation and Commissioning of the ArcticRevolution 75B must only be
undertaken by a qualified and trained individual. Children and persons with
reduced physical and mental capability must be supervised when using the
equipment.
Sanitising of the ArcticRevolution must only be undertaken by a qualified and trained
individual
Commissioning & Safe Usage
Please read the following instructions before installing the Arctic Revolution 75B
•Ensure that the ArcticRevolution 75B is connected to a potable mains water supply and
that Water Regulation Standards are met when connecting to the mains
•The AA Installation Rail meets Water Regulation Standards and contains all necessary
components to connect the ArcticRevolution 75B to the mains
•Water Regulations require that the mains connection point includes a non-return valve with
isolating tap, to avoid back flushing of water from the Arctic Revolution 75B into the mains
•Leave a 15cm gap all around the Arctic Revolution 75B to provide good ventilation
•Install the Arctic Revolution 75B on a flat surface to avoid vibration and noise
•Install away from a heat source which could affect the unit’s cooling capacity
•Avoid freezing conditions which could rupture the pipes
•Never tilt the unit over 45 degrees when carrying or storing
•Wait for an hour after transport before installing to allow the coolant to settle
•Fill water reservoir with water before the unit is powered up to avoid damage to the refrigeration
element
•Always turn the electricity off before removing any panels
•Always turn the water off at nearest stop cock before working on the Arctic Revolution 75B
•When not in use for an extended period: Turn the mains water and power off
•Sanitise the Arctic Revolution 75B before first use and follow the sanitising instructions
•Before switching the power on, purge any air in the system by discharging water from the taps.
This also ensures that the cold-water tank is filled with water
•Check all water connections for leakage and ensure that all electrical connections are safe,
before commissioning the Arctic Revolution 75B
Sanitising the Arctic Revolution 75B
Please read the following instructions before sanitising the Arctic Revolution 75B
•Switch the power off
•Turn the mains water off
•Remove the filter and replace with an empty AA First filter housing
•Pour the sanitising fluid into the empty filter housing
•Turn the mains water back on
•Open the taps to flush the sanitising liquid into the water tank and pipes
•Leave standing for 10 minutes and then flush through with water to remove all traces of the sanitising
solution
•Sanitise in strict accordance with WHA (Water Dispenser & Hydration Association https://twha.co.uk)
guidelines using only tested and therefore endorsed sanitising product