1.6 List of operaon states
1.7 Installaon, connecons and starng.
The power supplies are intended for installaon as part of an installaon by qualied personnel. The baery should not
be present in the power supply during installaon. Removal of the power supply module itself is not required. The PSU casing is
prepared for running the power supply and load cables through the rear casing. The dedicated holes are shown in the drawing
in pt. 1.2.
Before assembly, on the selected surface (e.g. wall with wall plugs), prepare 4 holes with a spacing of 350 × 275mm. In the
two upper holes, appropriate screws should be screwed in (maximum head diameter 8mm), on which the power supply cabi-
net should be hung. Inserng the two boom screws locks the cabinet. All screws can be ghtened in this state.
The power supply must be connected to a xed installaon using a protecve conductor and taking into account the L, N
and PE markings. It is recommended to equip the installaon with an overvoltage protecon system. It is required to install in
the supply circuits, apart from the power supply, an installaon switch with a nominal current of at least 3A. This switch is only
used to protect the mains supply cables against short-circuit and can be used for service and tesng purposes - checking that
the output voltage is maintained in the event of a mains power failure.
The power supply's transformer is equipped with its own fuse in the mains supply circuit. This fuse cannot be replaced, be-
cause its blown is a sign of serious damage.
The power supply is designed to work with a 12V baery, the so-called maintenance-free, which should be placed in the
cabinet aer mechanical and electrical assembly is completed. Pay parcular aenon to the polarity of the connecon betwe-
en the PSU module and the baery pack. If the connecon is incorrect, the baery circuit fuse will be damaged.
Aer making all the necessary connecons (mains power supply, baery pack and possible loads - their connecon is not
necessary to check the operaon of the power supply), the ability to maintain the output voltage can be checked. To do this,
turn o the mains supply with a switch located in the mains supply line, apart from the power supply itself, and check the pre-
sence of voltage at the outputs of the power supply, which is indicated by LED diodes located on its printed circuit board. You
can also use an ohmmeter to check the posion of the MAIN FLT relay. The status of signaling is presented in the table below.
*) The relay is ON when it has moved in relaon to the drawing describing this output
(the drawing shows the system of contacts in the OFF state of the relay).
Symbol State Descripon
Relay outputs
MAINS FLT OFF
ON
- no mains power or the power supply is damaged
- Power is ON, power supply is OK
LOW BAT OFF
ON
- Low baery voltage
- Baery voltage is OK
LED indicators
OUT 1 (G) OFF
ON
- No voltage on OUT1
- Voltage on OUT1 is OK
OUT 2 (G) OFF
ON
- No voltage on OUT2
- Voltage on OUT2 is OK
LOW BAT (Y) OFF
ON
- Low baery voltage
- Baery voltage is OK
230Vac (G) OFF
ON
- no mains power or the power supply is damaged
- Power is ON, power supply is OK
Power ON Power OFF
LED MAIN FLT ON OFF
LED OUT 1 ON ON
LED OUT 2 ON ON
Relay MAIN FLT ON * OFF