INSTALLATIONINSTRUCTIONSFORTRIMLESSINDRYWALL:FIRE-FX2™FIRE-RATEDCABINETS
1. NOTE that trimless cabinets for drywall are designed to be
installed after the first layer of drywall, but prior to the second
layer.
2. Remove all hardware and glazing, unlock cabinet if lock provided.
3. Install a framed opening above, below and at both sides of cabinet
opening at specified location. Wall opening width, height and
depth must correspond with dimensions indicated in catalog or
detail and submittal sheet.
4. Cabinet must be installed after the first layer of drywall has been
put up. The cabinet wall flange will lay on top of that layer of dry-
wall.
5. Use holes provided in cabinet tub for attaching to stud or substrate
material. If wall configuration does not allow for that, then follow
step 6 below; otherwise, skip to step 7.
6. [DrillingAdditionalHolesinTub]Drill(2)1/8”(3.2mm)holes
through tub on each side of cabinet.
7. Place cabinet in position and attach with Universal # 6 x 2-1/2”(6.4
cm) self-drilling screws. Be sure not to over-tighten on either side, which could pull the cabinet out of position in the opening and result in an exposed gap between
the cabinet frame and wall opening.
8. Start the screw without completely tightening; then start a screw on the opposite side of the tub. One all screws are started, tighteneachscrewina“criss-cross”
pattern. A torque setting of 4-6 is recommended if using a screw gun.
9. Once screws are fully tightened, check cabinet for square and plumb. Adjust if necessary. All interior sides should be straight with no bowing or warping.
10. Check cabinet door assembly for freedom of movement. If it binds, shim as necessary to remove any racking of tub at attachments of stud. Cabinet will need to be
removed temporarily in order to add shims.
11. Finish wall construction and install final top layer of drywall. The opening left in this layer of drywall for the FIRE-FX2™cabinetshouldbe2”lessinwidthand
heightthantheopeningoriginallymadeinsinstep3aboveor1”allaround.Thetoplayerofdrywallwillthereforecover the cabinet wall flange, resulting in a
“trimless”appearance.
12. Remove protective plastic from acrylic or glass and install decal if intended for glass. (Panorama Models Glazing is Pre-Installed)
13. Align glazing on inside of door, holding in place while installing glass mounting clips on inside of door. Do not over-tighten.
14. Install handle and roller catch or SAF-T-LOK™indoor.Checkalarmifprovided.
© Activar Construction Products Group, Inc 2015
FIRE-FX2™ AND SAF-T-LOK™ ARE TRADEMARKS OF ACTIVAR, INC.
Fire-Rating:Fire-FX2™cabinetsarefabricatedinaccordancewiththeULlabelfor
oneandtwohourcombustibleandnon-combustiblewallsystembuildingcodes.
ThefiretestinghasmettherequirementofANSI/UL1479(ASTM–E814)and
ULC/CANS115formembraneandpenetrationfirestops.
Installationinstructionsmustbestrictlyadheredtoinordertoobtainthefirerating.
HEADQUARTERS & CUSTOMER SERVICE: 9702 NEWTON AV S, BLOOMINGTON, MN 55431 PH: 800-554-6077 FAX: 952-835-2218 EMAIL: SALES@ACTIVARCPG.COM WWW.ACTIVARCPG.COM
ACPG WEST COAST/SAMSON: COMMERCE, CA WAREHOUSES: DALLAS TX, FORT MYERS FL, LANCASTER PA, ATLANTA GA, CHICAGO, IL, SEATTLE WA, OMAHA NE, FARGO ND 12/10/2014 14I-103 REV B
Note: Drawings shown on this page are examples only of typical installation in a fire-rated wall, and are not to be used as recommendations for wall construction.
Distributed by:
Safety Emporium
PO Box 1003
Blackwood, NJ 08012
Ph: (866) 326-5412 toll-free
Fax: (856) 553-6154
[email protected]
www. safetyemporium.com
INSTALLATIONINSTRUCTIONSFORPLASTER/STUCCOWALLS:FIRE-FX2™FIRE-RATEDCABINETS
© Activar Construction Products Group, Inc 2015
FIRE-FX2™ AND SAF-T-LOK™ ARE TRADEMARKS OF ACTIVAR, INC.
Fire-Rating:Fire-FX2™cabinetsarefabricatedinaccordancewiththeULlabelfor
oneandtwohourcombustibleandnon-combustiblewallsystembuildingcodes.
ThefiretestinghasmettherequirementofANSI/UL1479(ASTM–E814)and
ULC/CANS115formembraneandpenetrationfirestops.
Installationinstructionsmustbestrictlyadheredtoinordertoobtainthefirerating.
HEADQUARTERS & CUSTOMER SERVICE: 9702 NEWTON AV S, BLOOMINGTON, MN 55431 PH: 800-554-6077 FAX: 952-835-2218 EMAIL: SALES@ACTIVARCPG.COM WWW.ACTIVARCPG.COM
ACPG WEST COAST/SAMSON: COMMERCE, CA WAREHOUSES: DALLAS TX, FORT MYERS FL, LANCASTER PA, ATLANTA GA, CHICAGO, IL, SEATTLE WA, OMAHA NE, FARGO ND 12/10/2014 14I-103 REV B
Note: Drawings shown on this page are examples only of typical installation in a fire-rated wall, and are not to be used as recommendations for wall construction.
1. NOTE these trimless cabinets are designed to be installed in
plaster/stucco wall conditions prior to the application of lath
and plaster/stucco.
2. Remove all hardware and glazing, unlock cabinet if lock provid-
ed.
3. Install a framed opening above, below and at both sides of cabi-
net opening at specified location. Wall opening width, height and
depth must correspond with dimensions indicated in catalog or
detail and submittal sheet.
4. Use holes provided in cabinet tub for attaching to stud or sub-
strate material. If wall configuration does not allow for that, then
follow step 6 below; otherwise, skip to step 7.
5. [DrillingAdditionalHolesinTub]Drill(2)1/8”(3.2mm)holes
through tub on each side of cabinet.
6. Place cabinet in position and attach with Universal # 6 x 2-
1/2”(6.4cm)self-drilling screws. Be sure not to over-tighten on
either side, which could pull the cabinet out of position in the
opening and result in an exposed gap between the cabinet frame
and wall opening.
7. Start the screw without completely tightening; then start a screw
ontheoppositesideofthetub.Oneallscrewsarestarted,tighteneachscrewina“criss-cross”pattern.Atorquesettingof 4-6 is recommended if using a screw gun.
8. Once screws are fully tightened, check cabinet for square and plumb. Adjust if necessary. All interior sides should be straight with no bowing or warping.
9. Check cabinet door assembly for freedom of movement. If it binds, shim as necessary to remove any racking of tub at attachments of stud. Cabinet will need to be removed
temporarily in order to add shims.
10. Finish wall construction. Lay metal lath material over substrate and fasten securely. Ensure that lath extends over the wall flange at the perimeter of the Fire-FX2™.
11. Applyplasterand/orstuccoovermetallathaspermanufacturer’sinstructionsandjobspecifications.Usetheforward-projecting edge of the FIRE-FX2™cabinet as a
“plasterstop”,forasmoothandflushfinalinstallation
12. Remove protective plastic from acrylic or glass and install decal if intended for glass. (Panorama Models Glazing is Pre-Installed)
13. Align glazing on inside of door, holding in place while installing glass mounting clips on inside of door. Do not over-tighten.
14. Install handle and roller catch or SAF-T-LOK™indoor.Checkalarmifprovided.

Popular Security Sensor manuals by other brands

Bosch 0603683000 Original instructions

Bosch

Bosch 0603683000 Original instructions

Aritech EV400-PLUS Series quick start guide

Aritech

Aritech EV400-PLUS Series quick start guide

Renkforce 1362991 operating instructions

Renkforce

Renkforce 1362991 operating instructions

AGFA DX-D 40C user manual

AGFA

AGFA DX-D 40C user manual

Rielta FOTON-12-RK installation guide

Rielta

Rielta FOTON-12-RK installation guide

AMC SMILE 18 manual

AMC

AMC SMILE 18 manual

Rielta Ladoga MK-RK installation guide

Rielta

Rielta Ladoga MK-RK installation guide

Schaller Automation Visatron VN2020 operating manual

Schaller Automation

Schaller Automation Visatron VN2020 operating manual

Inficon UL6000 Fab Translation of the original operating instructions

Inficon

Inficon UL6000 Fab Translation of the original operating instructions

Inficon D-TEK 3 operating manual

Inficon

Inficon D-TEK 3 operating manual

INTERSPIRO Respire N user manual

INTERSPIRO

INTERSPIRO Respire N user manual

koban KDP7 manual

koban

koban KDP7 manual

Axis T8331-E installation guide

Axis

Axis T8331-E installation guide

Nagano Keiki ZT11 user manual

Nagano Keiki

Nagano Keiki ZT11 user manual

Baumer UNDK 09G8914/IO quick start guide

Baumer

Baumer UNDK 09G8914/IO quick start guide

GE Interlogix GS930 installation manual

GE Interlogix

GE Interlogix GS930 installation manual

Elkron FDT500 Mounting

Elkron

Elkron FDT500 Mounting

Bosch Motion Detector instruction manual

Bosch

Bosch Motion Detector instruction manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.