
USAGE
1.Tocheck every connectionoftheairless pumpforthe tightness.If
loosed,theconnection shouldbescrewed tight.
2.Toconnecttheinletair hose. Generally thediametersof theinlethoses
shouldn tbe lessthan 20mm.Ifthe air sourceisfarawayfrom theairless
pump,the diametersoftheinlethosesshouldn tbeless than25mm.Also
toconfirm everyairway hoseand valve connectorcleantoconnecttheair
sourcehoses.
3.Toconnect thepaint spray hose.Firstlytoconnect thehigh pressure
paint hose,swivelnippleandsprayguntightly,thenwiththe paint outlet
ofthe main unit.Apiece of10meterspaint hose is equippedwith the
main unit.Forthegeneralpaintingsoflow viscidity,thelength ofhigh
pressure 1/4”Paint hosecan be equippedfor100-150 meters;forhigh
quality paintingsuch asthick filmtype,thelengthof1/4”painthose can
be 50meters orso.Whenthepaintingfieldis50metersawayfromthe
pump and theviscidity ofpaintingis thick,3/8”painthoseshouldbe
chosen.Andthe section hose close tothe spraygunshouldbe1/4”forthe
flexible operation..
Thereare twokindsof painthoses; 5meters and10meters.Thesetwo
kindspainthose canbeconnectedbymiddlenipple.
4.Topourlubricant.Thelubricantshould beoftenpouredintothe oil cup
ofthe paintpumpbefore the start-upandtheprocessoftheoperation