
Turn-On & Commissioning Handbook Alcatel 1850 TSS-320 Rel.1.1
Table of contents 8DG 07734 FAAA Ed. 01 1/102
TABLE OF CONTENTS
LIST OF FIGURES...................................................................................................................................3
LIST OF TABLES ....................................................................................................................................5
PREFACE.................................................................................................................................................7
Preliminary Information ........................................................................................................................7
Applicability ..........................................................................................................................................9
Scope .................................................................................................................................................10
History ................................................................................................................................................10
Related Documents............................................................................................................................11
Handbook Structure ...........................................................................................................................12
General Information on Documentation .............................................................................................12
1INTRODUCTION...............................................................................................................................13
1.1 Symbols .....................................................................................................................................13
1.2 Safety, labels and norms ...........................................................................................................14
1.2.1 Main Safety Rules............................................................................................................. 14
1.2.2 General Rules ...................................................................................................................14
2INITIAL TURN-ON AND SETTING...................................................................................................15
2.1 Initial turn-on sequence instruction............................................................................................15
2.2 Visual inspection for subrack installation and cabling ...............................................................15
2.3 HW setup ...................................................................................................................................15
2.4 Start up procedure .....................................................................................................................16
2.4.1 Equipment Switch-on ........................................................................................................ 16
2.4.2 PC Start-up ....................................................................................................................... 16
2.4.3 C.T. Start-up...................................................................................................................... 20
2.5 N.E. Software settings ...............................................................................................................23
2.5.1 Preset the equipment configuration .................................................................................. 23
2.5.2 Equipment inventory ......................................................................................................... 24
2.5.3 Cross Connection settings for Local Measures with Craft Terminal................................. 24
2.5.4 Standard connections ....................................................................................................... 24
3TEST AND MEASUREMENTS.........................................................................................................25
3.1 Instruments, Accessories and related documents.....................................................................25
3.2 Connection points position ........................................................................................................27
3.3 Local Measures list and operating sequence ............................................................................30
3.3.1 Free running frequency check .......................................................................................... 31
3.3.2 SDH ports test................................................................................................................... 33
3.3.3 DATA ports tests............................................................................................................... 38
3.3.4 CWDM ports tests............................................................................................................. 42
3.3.5 SNCP protection check (line ports)................................................................................... 50
3.3.6 Protection test MATRIX/CRU EPS ................................................................................... 51
3.3.7 Synchronism priority and Holdover (if present)................................................................. 52
3.3.8 Alarms check (if connected) – TBD .................................................................................. 55
3.3.9 Final checks ...................................................................................................................... 57
3.4 Point to point measures list and operating sequence................................................................58
3.4.1 Rx Optical “line port” power check.................................................................................... 58
3.4.2 Optical “line port” link margin ............................................................................................ 59
3.4.3 Point to point error monitoring check ................................................................................ 61
3.4.4 Ring error monitoring check.............................................................................................. 62
4CONNECTIONS, CONFIGURATIONS AND CHARACTERISTICS ................................................63
4.1 STM-n cross connection– Matrix looped STM-n .......................................................................64
4.2 Bi-dirl protected unstructured cross-connection: STM-1 and STM-1 port ................................65
4.3 Bidir. protected cross-connection: STM-1/STM-4 port and STM-n ports ..................................66
4.4 Unprot. Bidir. cross-conn.: Concatenated group (VC4-7V) and STM-N port ............................67
4.5 Cross-connection between a local and a remote data port.......................................................69