All American 225 User manual

OPERATOR’S MANUAL
MODEL 225
CAN SEALER
WISCONSIN ALUMINUM FOUNDRY CO.
1931 SOUTH 14TH STREET
MANITOWOC, WI 54220 USA
920-682-8627 FAX: 920-682-4090
email: customerrelations@wafco.com
web page: www.allamerican-chefsdesign.com

2
Table of Contents
Page 3 - Introduction & Getting Started
Page 4 - Parts Diagram
Page 5 - Maintenance
Page 6 - Adjustments & Seam Gauge
Page 7 - Trouble Shooting
Page 8 - Parts Picture List
Page 9 - Parts List
Page 10 - Warranty Information
Page 11 - Packing List

3
INTRODUCTION
This can sealer was thoroughly inspected and tested at the factory before shipment. Immediately
upon receipt, carefully check the can sealer for damage before using it. Do not operate the can sealer
if it is damaged; call 920-682-8627 for further instruction.
The 225 comes with either the CY-28 No. 2 Chuck or the CY-27 No. 3 chuck and the CY-3 Base Plate.
These are designed and set up to seal a No. 2 or No. 3 can. A sample can was used to set up the
machine and was locked in place during shipping to help protect the machine. Prior to removing the
container, lower and raise the base plate by turning the Can Lifter Handle as far as possible to the left
and then back to the right a few times. Pay attention to the amount of pressure you have to apply to
the Lifter Handle when locking the can into place. It is good to develop a feel for the amount of base
plate pressure required to properly seal a can. Cans with a bigger or smaller diameter will require a
different size Chuck and Base Plate. Height adjustment with spacers is necessary before attempting
to seal other size cans.
GETTING STARTED
1. The sealer can be firmly attached to a table or bar using the four bolt holes (cast into sealer
base) to bolt down the sealer. If that isn’t possible, you can use a C-clamp to attach the sealer
to a bench top.
2. For operation, the seaming lever rivets (CY-22R) should be in the number 2 or the size you are
sealing hole of the cam roller lever (CY-22).
3. Lower the Base Plate (CY-3) by turning the Can Lifter Handle (CY-10) as far as possible to the
left.
4. Place lid on filled can and set can on Base Plate (CY-3).
5. Raise can until it is clamped firmly between the Base Plate and Chuck by turning Can Lifter
Handle (CY-10) as far as possible to the right until handle locks itself against the Frame (CY-1).
The can is now ready to be sealed.
6. Turn the Hand Crank (CY-11) until the first operation roller touches the can. Continue to turn
until the first operation roller pulls away from the can. This hooks the lid to the can. Keep
turning the Hand Crank until the second operation roller touches the can; continue to turn
until the second operation roller pulls away from the can. This finishes the seal. (You will turn
the hand crank a total of 18 times).
7. When both arms are away from the can, pull can lifter handle toward you and remove can.
8. Wipe down the machine frequently to prevent buildup of foreign material.

4
PARTS DIAGRAM
Roller Bearing Lever
CY-9F & CY-9S
Seaming Roller Pin
CY-18F & CY-18S
Seaming Lever
CY-8F& CY-8S
Adjusting Lever
CY-24FS
Cam Roller Lever
CY-22
Operation Roller
CY-14 & CY-15
Lock Screw for Roller Bearing
CY-9LS
Adjusting Screw CY-24AS
and Lock Nut CY-24LN
Crank
Complete
CY-11
Cam Worm Wheel
Cover
CY-2
Frame for 225
CY-1
Can Lifter Handle
CY-10
Chuck Holder
Bushing
CY-19
Front Gear
Cover
CY-65
Base Plate
Shaft
CY-32
Compression
Spring
CY-34
Chuck Holder
Bushing
CY-19
Rivet for Cam Roller
CY-22R
Seaming Lever Pin
CY-17
Base Plate
CY-3
CY-28
No. 2 Chuck

5
MAINTENANCE
Quarterly Maintenance Schedule
1. Remove Base Plate and oil CY-32 Baseplate Shaft on the underside with food grade lube oil.
2. Remove Can Lifter Handle; oil brass stem and where Handle comes in contact with Frame. (Use food grade oil)
3. Put food grade white petrolatum on all of the teeth of the Cam Worm Wheel located behind the Cam Worm
Wheel Cover.
4. Put food grade white petrolatum on the teeth of the Bevel Gear located behind the Front Gear Cover.
Daily Maintenance Schedule: Use food grade lube oil at each arrow below.
1
2
4
3
3
2
Oil Roller
Oil Hole in CY-2
Oil Roller
Oil Hole
Oil Hole
Oil Hole

6
ADJUSTMENTS & SEAM GAUGE
Check the adjustment of the Seaming Rolls occasionally. First
check the height adjustment as follows: When Chuck (A in sketch)
is held up tightly against the Brass Bushing (CY-1BER), the
underside of the top flange on the Seaming Roll (B in sketch) must
fit closely on top of Chuck (A). To make adjustments, push the
Adjusting Lever (CY-24) toward Chuck until Seaming Roll touches
the Chuck. Slightly loosen Screw (CY-9LS) which is “C” in sketch,
push down on Roller Bearing Lever that contains Seaming Roll (B)
until top flange of Seaming Roll (B) rests on top of Chuck (A). Now
tighten Screw (CY-9LS) which is “C” in sketch as tight as possible.
This adjustment should be made on both 1st and 2nd Operation
Rolls. After height adjustment has been made, use the Seam
Gauge which is for checking the seam on any standard size can.
Use the seam gauge as follows: Remove the Rivet (CY-22R) on the Second Operation Cam Roller
Lever (CY-22). The second operation is on the right side if you are facing the front of the machine.
Run an empty can in the machine to seal the First Operation. Remove the can and slip the Gauge
over the seam. The groove marked “1st” should slide over seam on can. The seam will not fill the
entire length of the groove but the Gauge should slip on far enough so that it touches the can cover.
If groove in Gauge will not slip over seam, tighten First Operation Roller (CY-14) by loosening Lock Nut
(CY-24LN) and turning Adjusting Screw (CY-24AS) not more than a quarter turn to the right. If the
groove in Gauge is loose on the seam, turn the Adjusting Screw to the left. Repeat above operation
with another empty can until Seam Gauge fits over seam correctly. When first operation seam is
correct, change the Rivet (CY-22R) from the First Operation Levers to the Second Operation Levers
and adjust the Second Operation Roller in the same manner as the First Operation Roller using the
can that has a proper first operation roller seam. The groove in the Seam Gauge marked “2nd” is used
when adjusting the Second Operation Roller (CY-15). Be sure to tighten the Lock Nuts (CY-24LN)
after adjusting each roller.
If it is necessary to operate sealer without a can in place, remove Chuck (CY-28) to prevent damage
to it and Seaming Rolls.

7
TROUBLE SHOOTING
Can isn’t spinning properly:
1. Increase belt tension as follows: Loosen lock nut on the tensioning bolt, then turn tensioning
bolt to the right to increase tension. After adjustment, tighten the lock nut.
Operation rollers aren’t spinning properly:
1. If the rollers aren’t kept clean, over time buildup from certain liquids can form and lock the
roller into place. Remove the Roller Bearing Lever and soak assembly in warm soap and water
for 10 minutes to loosen buildup. Rinse clean and dry. Install Roller Bearing Lever, adjust and
oil with food grade lube oil.

8
PARTS PICTURE LIST
18
19
20
27
21
22
23
24
28
26
25
29
31
34
30
33
32
1
2
3
4
5
6
7
8
10
11
16
17
15
38
13
14
12
9
39
40
35
36
37

9
PARTS LIST
PICTURE
NUMBER
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
PART
NUMBER
CY-26
CY-6
CY-7
CY-4
CY-25W
CY-25D
CY-25
CY-5
CY-10
CY-34
1/8
CY-2S
CY-65
CY-32
CY-19
CY-2
CY-1
CY-9LS
CY-9F
CY-18F
CY-14
CY-9LW
CY-9S
CY-18S
CY-15
CY-8F or CY-8S
CY-17
CY-1E
CY-22
CY-24AS
CY-24LN
CY-22R
CY-24FS
CY-35
CY-28
CY-3
CY-83
CY-12
CY-11
CY-11S
DESCRIPTION
Worm Wheel Shaft
Cam Worm Wheel/225 & 225F
Worm Gear
Bevel Gear w/ Ball Lock
Worm Shaft Fiber Washer
Pin for Worm Shaft
Worm Shaft
Bevel Pin Gear
Can Lifter Handle
Base Compression Spring
1/8”Height Washer
Cover Plate Screw
Front Gear Cover
Base Plate Shaft
Chuck Holder Bushing (Top)
Worm Wheel Cover
Frame for 225 & 225F
Lock Screw for Roller Bearing
Roller Bearing Lever-First
Seaming Roller Pin-First
First Operation Roll
Lock Washer for Lock Screw
Roller Bearing Lever-Second
Seaming Roller Pin-Second
Second Operation Roll For Can Sealer
Seaming Lever-First or Second
Seaming Lever Pin
Escutcheon Pin
Cam Roller Lever
Adjusting Screw for Adjusting Lever
Lock Nuts (2) for Adjusting Screw
Rivet for Cam Roller& Adjusting Levers
1-Adjusting Lever
Seaming Lever Spring
No. 2 Chuck
Base Plate
Seam Gauge
Wood Grip for Crank
Crank Complete
Set Screw for Crank
To order parts, please call Wisconsin Aluminum Foundry Co. at 920-682-8627

10
ALL AMERICAN
AUTOMATIC MASTER CAN SEALER
LIMITED WARRANTY
This quality Automatic Master Can Sealer is designed and manufactured to provide many years of
satisfactory performance under normal use. Wisconsin Aluminum Foundry guarantees to the original
owner that should there be any defects in material or workmanship during the first ninety (90) days
after purchase, we will repair or replace it, at our option. This warranty does not apply to damage
caused by shipping. To obtain service under the warranty, please do the following:
1) Call the Customer Service Department to obtain a Return Authorization (RA) Number.
Items returned without a Return Authorization Number will be refused.
2) Return can sealer, shipping prepaid with sales receipt, RA Number and a description of the
claimed defect to:
WISCONSIN ALUMINUM FOUNDRY CO., INC.
CONSUMER PRODUCTS DIVISION
1931 SOUTH 14th STREET / PO BOX 246
MANITOWOC, WI 54220
PHONE: 920-682-8627 FAX: 920-682-4090
Return transportation will be prepaid on all can sealers under warranty. Repairs made after the
warranty has expired will be billed at the current repair costs.
We want you to obtain maximum enjoyment from using this quality can sealer and we ask that you
take the time to read and follow the operating instructions. Failure to follow instructions, damage
caused by improper replacement parts, abuse, or misuse will void this warranty.
This warranty gives you specific legal rights, and you may also have other rights which vary from state
to state. This is Wisconsin Aluminum Foundry’s guarantee to you and is being made in place of all
other express warranties.
Important - please read: Any alterations, modifications or changes of any type
made to the can sealer or to any component thereof will void this warranty.

11
PACKING LIST FOR:
One –No. 225 ALL AMERICAN Automatic MASTER Can Sealer.
Parts Included: To Seal No. Cans
-
-
-
-
-
One - instruction booklet
One - seam gauge
ADDITIONAL SPECIAL PARTS:
Packed by:___________________________
This packing list must be returned within five days if any shortage is claimed to:
Wisconsin Aluminum Foundry Co., Inc.
1931 South 14th Street P.O. Box 246
Manitowoc, Wisconsin U.S.A. 54221-0246
Phone: 920-682-8627 Fax: 920-682-4090
Table of contents
Other All American Kitchen Appliance manuals