Use the three provided mounting screws to secure the TG-PEM
board onto the bracket.
5. Connect the TG-PEM to TG-7 or TG-7FS
•Make sure there are no AC or DC power sources
connected to the TG-7 or TG-7FS. Connect power and
ground from the TG-PEM terminal labeled “TELGUARD
POWER” to the terminal block on the TG-7 or TG-7FS
labeled DC and GND. Do not overtighten.
•Connect ribbon cable (provided) from the connector on
TG-PEM labeled “TO HOST” to the 3x2 6-pin header on
the TG-7 series board as shown. The dark color edge of
the ribbon cable should be oriented away from the
antenna of the TG-7 or TG-7FS.
6. Power Up and Configure
•Connect power and ground from the panel
auxiliary output to the terminal labeled “PANEL
POWER” on the TG-PEM to provide power to the
TG-PEM and TG-7 or TG-7FS.
•Complete the activation of the TG-7 or TG-7FS as
outlined in the TG-7 series manual.
•If the TG-PEM was preconfigured, it should now
be ready; otherwise, visit www.telguard.com to
configure the TG-PEM.
•When the TG-PEM is configured and ready, LED
D2 will be either solid amber (in power supply
only mode) or solid green (in power supply and
zone extender mode).
7. Connect Zone Inputs (if using)
•Temporarily disconnect the power while you
connect any monitoring sensors to the zone
inputs.
•For supervised zones, use a standard 2.2kΩEOL
resistor (not included).
•Reconnect power, allow the TG-7 or TG-7FS to
initialize, and check for proper operation.
Optional: Second TG-PEM Installation
See full Installation Manual for mounting and wiring
instructions.
REFERENCE: