Antaeus AT 75 B User manual

2021
Operation Manual
Side Grip Vibro Hammer

Certified by ISO9001 and CE
Antaeus Foundation Equipment LLC
Phone: 206-495-7030
Email: [email protected]
Website: www.antaeusfoundationequipmnt.com
250 South Webster Ave
Seattle, Washington 98108
Mailing Address:
PO Box 809
Seahurst, Washington 98062

Foreword
•Thank you for choosing Antaeus hydraulic side grip vibro hammer!
•The Antaeus side grip hammer is a new generation of pile drivers
suitable for different geological conditions and different pile types.
•We regularly update this Operation Manual for you to have a
comprehensive understanding of this product.
•The contents of this manual include how to install, maintain, and
repair the piling machine correctly. How to use it safely and how to
perform the routine inspections and maintenance to extend the product
life.
•Please be sure to read this manual to prevent incorrect operation.
The user should follow the contents of this manual for technical
training to operate correctly, safely, and exert its best working
condition. Antaeus is not liable for any direct, indirect, incidental or
consequential damages arising out of the use that do not following this
Operation Manual.
•Please record following information of the product:
The vibrator S/N :
The model of the hydraulic Excavator vibro hammer :
The model of the hydraulic power equipment:
Antaeus Side grip vibro hammer
Antaeus Machinery has various vibro
hammer models , please refer to the
technical parameters of this manual.
The code means Antaeus Machinery
improvement and upgrade edition.
Series Model
Code
AT 75 B
P1

Warning Sign legend
Warning! Subject to constant improvement and
engineering progress, we reserve the right to make changes
to specification without notice.
Notice!Attention
Notice!To ensure safe operation, be sure to check
before any operating of this product. It is necessary to
inspect regularly..
Warning!Potentially dangerous or dangerous
situation, if not avoided, may result in serious injury, damage
or malfunction
Warning! Matters requiring special notification.
Notice!In order to ensure safe operation, please check
the pile driver before any operation, and regularly check to
prevent bearings from exceeding heat limits.
Notice!Before installation, operation or maintenance of
the vibro hammer, please read this manual carefully.
Notice!Please pay abide by local regulations.
Warning!In order to avoid personal injury and
equipment damage, please be sure to abide by relevant laws
and regulations and safe operation usage.
P2

Content
Chapter 1 Product profile ......................................................4
1.1 General ..............................................................................4
1.2 Features ............................................................................6
1.3 Main components .............................................................7
1.4 Specification ...................................................................10
1.5 Model selection reference.............................................11
1.6 Working principle and application ..............................12
1.7 Security points ..............................................................14
Charpter 2 Installation Instruction .....................................15
Chapter 3 Commissioning ...................................................18
Chapter 4 Piling operation ...................................................19
4.1 Check before operation ...............................................19
4.2 Driving piles and extracting..........................................20
4.3 Safety notification .......................................................23
Chapter 5 Safety rules ........................................................24
5.1 General description ......................................................24
5.2 Safety notification .......................................................25
5.3 Emergency handling ....................................................32
Chapter 6. Operation specification ....................................33
6.1 Operation guide ...........................................................33
6.2 Operation steps and skills..............................................36
Chapter 7 Inspection and maintenance..............................39
7.1 Inspection and maintenance ..........................................39
7.2 Check items and check time table ..............................43
7.3 Self-inspection measure ............................................45
Chapter 8 Fault and Troubleshooting ..............................47
Chapter 9 Electric diagram ...............................................49
Chapter 10 Hydraulic diagram ............................................50
Warranty ................................................................................51
P3

Chapter 1 Product profile
1.1 General
1.1.1 About Antaeus Machinery
The name Antaeus” comes from the ancient Greek god of the earth. We use this name
because our company’s core proposition is to design, rent, sell, and service deep foundation
construction equipment.
Antaeus Foundation Equipment LLC, formed in June of 2016, is a deep foundation
construction equipment manufacturing company specializing in vibratory pile driver/extractors
and related products. We design and manufacture, rent, sell, and service deep foundation
equipment of all makes and sizes.
John L. White, the CEO, started his career in the deep foundation construction business in
1977 in Seattle At PACO (Pacific American Commercial Company). Fresh out of the US
Marines, John traveled the Western half of the US and Canada, servicing and leasing pile
driving equipment manufactured by MKT, Vulcan and Delmag.
John served as President of APE from 1990 until his departure in June of 2012. During this
time at APE, John received 40 patents related to pile driving and deep foundation machines.
John also set the world’s record for installing the largest pile. John built APE into the world’s
largest pile driving equipment manufacturing company and his inventions revolutionized the
industry. John sold his shares of APE in 2012.
John continued to invent pile driving machines and longed to return to inventing new pile
driving machines. John’s latest inventions are shocking the industry, including his new
“updrive” hydraulic power units and his multi-staged suppressor system.
In June of 2016 John returned to the deep foundation industry by launched Antaeus. His new
machines are quickly becoming the number one choice in pile driving equipment. Antaeus has
a mission. Our goal is to buy, manufacture, rent, sell, lease and service state of the art pile
driving machines for the purpose of providing a competitive edge to our customers.
We are gods of pile driving, we are Antaeus Foundation Equipment.
P4

1.12 About Antaeus hydraulic Excavator vibro hammers
The Antaeus Hydraulic Excavator Vibro hammer is excavator mounted
and used to pull or extract steel sheet piles, steel pipes and concrete
piles with simple, flexible, well-designed, reliable performance and
quiet operations.
The Antaeus Hydraulic Excavator Vibro hammer is powered by the
excavator hydraulic power system, without the need of another power
unit. The Antaeus Hydraulic Excavator Vibro hammer works with high
frequency vibration from 2800 to 3000 RPM and provides 30 tons to 50
tons force to break the soil adhesive power.
P5

1.2 Features
•Functions: Vibrating, clamping, and rotating. Each action is
individually controlled.
•Two-settings of vibration power output, which can meet with all kinds
of construction conditions. The second setting vibration output is
more powerful and could be applied for the hard soil layer .
•Well-Designed hydraulic system.
•The product can be installed in all kinds of brand excavators.
•Operated by one excavator operator in the cab
•Working quietly, less impact on the surrounding environment and
suitable for urban jobs.
P6

1.3 Main Components
1. Rotation gear box: the latest gear built-in design to prevent dirt and
impact, replaceable gears, run smoothly and durable.
2. Gear box: the core component and power source of this machine.
3.Bracket: High-performance elastomers, stable quality, long use life.
4. Hydraulic motor: Italian hydraulic motor.
5. Clamp: various types for all kinds of piles; powerful hydraulic
cylinder, wear-resistant tooth block; strong casting body.
6. Hydraulic oil system: Special functions and features designed for
the Excavator vibro hammer.
7.Vice arm: Based on excavators and pile requirements, we design
several vice arms with different specifications.
8.Control system: electric control by handle, convenient operation,
multi functional integration
9.Hanger and axis: Well-designed, strong and easy maintenance.
P7

1
1
2
3
4
5
67
8
9
10
P8

1.4 Specification
1.4.1 Product Dimensions:
P9
102.12 inches
51.49 inches 50.23 inches

1.4.2 Specification
Model
55B 65B 75B
Eccentric Moment kg-m
Eccentric Moment In-lbs
5.5 kg-m 6.5 kg-m 7.5 kg-m
Centrifugal force(kN)
Centrifugal force US Tons
320 kN 378 kN 451 kN
Max drive force(kN)
Max drive force US tons
545 kN 645 kN 767 kN
Frequency(vpm)2300-3000 vpm 2300-3000 vpm 2300-3000 vpm
side grip force(Kn)
382 kN 456 kN 558 kN
bottom grip force(Kn)384 kN 550 kN 550 kN
hydraulic pressure(bar)300 bar 320 bar 320 bar
Rotation /tilt angle(°)360°/±30°360°/±30°360°/±30°
Size(mm)
1320*1450*2550 1350*1490*2650 1350*1490*2650
2600 kg 3200 kg 3500 kg
excavator class(Mt)20-30 t 30-40 t 40-50 t
applicable pile length (m)6~12m6~15m6~18m
P10
477 in-lbs 564 in-lbs 650 in-lbs
36 US tons 42 US tons 51 US tons
61 US tons 72 US tons 86 US tons
side grip force US tons 42 US tons 51 US tons 62 US tons
bottom grip force US tons 43 US tons 61 US tons 61 US tons
hydraulic pressure PSI 4351 PSI 4641 PSI 4641 PSI
Size(inches)51" X 57" X 100" 53" X 57" X 104" 53" X 57" X 104"
Weight(kg)
Weight lbs 5732 lbs 7054 lbs 7716 lbs
excavator class US tons 22-33 US ton 33-44 US ton 44-55 US ton
applicable pile length ft 20~40 ft 20~50 ft 20~60 ft

1.5 Model selection reference
Model
pile length 6m
9m 12m 15m 18m
55B
65B
75B
The max pile pile length when the soil is soft
The max pile pile length in common soil conditions
P11
pile length 20ft 30ft 40ft 50ft 62ft

(1) With high frequency this hammer will transmit the high vibration
force to the pile. The soil structure will change with the high vibration
causing soil liquidation. The frictional force between the pile and the
soil will be reduced and pile will sink. With the downward pressure from
excavator combined with the pile weight the pile will sink into the soil.
(2) When extracting piles, the pile can be pulled or extracted by the
up-pulling force from excavator during vibration.
(3) The driveability of the pile is based by many factors such as soil
layers, soil type, water content, pile type, rocks, and so on.
1.6 Working Principles and application
Antaeus high frequency hydraulic pile driving machine adopts
vibration driving and extracting. This hamm is very suitable for
projects with short piles or medium length piles such as photovoltaic,
city planning, bridge, cofferdam, building foundation projects.
Working principles:
(1) There are eccentric weights inside the machine, spun by motor,
which rotate with high speed and produce eccentric force. Eccentric
force is suppressed by rubber elastomers which isolate vibration from
entering the excavator and keeping it in the pile.
(2) Eccentric force is in proportion to the eccentric moment and the
square of the speed of vibrations measured as vpm. Antaeus
eccentrics are have been in constant development over 30 years
resulting in an efficient and durable unique design.
Construction principles:
P12

P13

•The operator should have professional knowledge and related
certificates required to operate this machinery.
•Strictly follow all security regulations.
•Use of this machine for lifting operation is not allowed.
•Use this piling machine as impact hammer (loosening the clamp
pressure and impacting) is not allowed.
•Operator should always keep visual communication with pile
holding person and other assistant.
•If any danger happens during piling, stop operation immediately.
•Check the machine before working every day.
•The gear box will be very hot during operation, do not touch it
with your bare hands, only use a heat gun to check heat.
•Any revisions to this machine is not allowed.
1.7 Saftey points:
Under difficult construction conditions the operator should
know the job site and make safe judgments with regards
to weather, slope, and failure of job site equipment.
Check if there is any underground cables, hanging
obstacles or anything which may cause danger in job site.
Working radius of machine in job site:
Formula: Pile length +1/2( pile length)
This area can be the working area of this piling machine
and room for the excavator to turn around.
P14

2.3 The Main hammer connects with vice arm, the connection width and
shaft diameter is same (see following pic):
第17页;共48页
pin1
pin2
adaptor
Chapter 2 Installation Instructions
Antaeus piling machine is attached to excavator. Before installation, make sure that
the excavator power system matches the piling machine. If any problems please
call the nearest Antaeus service branch.
2.1 Choose an empty, flat and clean ground for installation, anyone who is not related
to installation should keep keep some distance.
2.2 The installation position in the excavator is the bucket position. Remove bucket
first, then install the vice arm of the piling machine. Different excavator models use
different vice arms of which the connecting shaft diameter and length differs. The shaft
diameter can be adjusted with washers or bushing.
P15

2.4 After installation, lift the machine and make the gear box and
Clamp vertical to the ground.
Frame clamp
adaptor bottom grip
P16

2.5 Before installation, make sure all the hydraulic connection parts
are clean with no pollutants inside the hose.
2.6 Equip one electric control box for the piling machine, install it in
the cab, fix the wire on the vice arm with film, do not expose it to the
elements
2.7 For installation details, please contact our services people.
P17

• Clean the ground and tools before commissioning, check all oil hoses,
electric wires, bolts, connection shafts, safe steel wires, clamp, make
sure all are firm and safe. Anyone who is not related to commissioning
should keep away.
•Operator starts excavator, check the excavator as following
(1)Lift up the long boom and short arm, operate to move the shaft,
check if the movement of vice arm and the main hammer is stable or
not, or is there any colliding.
(2)Operate clamping system, clamping release, rotate 270 °in order,
vibrate with low speed 3 times continuously. Check if there is any
abnormal movement, any leaking or lose bolts.
(3) If the above movement is normal, adjust the working speed of the
engine, add one pressure meter behind the clamp. Operation clamping,
pressure should be 4351-4931 PSI (300-340bar). If the pressure is lower or
higher than the pressure range listed adjust the excavator system pressure
or relief pressure. Rotate the main hammer, check the rotate speed and
adjust it if needed.
(4) Operating vibration, the jaw will close automatically when vibrating.
First time 1 minute, then 5-10 minutes if normal。 Operate second
stage vibration during this 5-10 minutes, and check if excavator works
normal or any hose leaking.
(5) If everything is normal, this machine can be used.
Chapter 3 Commissioning
P18
Table of contents
Other Antaeus Construction Equipment manuals
Popular Construction Equipment manuals by other brands

Ligchine
Ligchine Screedsaver BOSS 240 instructions

Clarke
Clarke Strong Arm CHV12B Operation & maintenance instructions

SUNWARD
SUNWARD SWDM40 Operation & maintenance manual

MULTIQUIP
MULTIQUIP Mikasa MVH408DE Operation manual

Jameson
Jameson Bulldog Bender Pup user manual

Benner-Nawman
Benner-Nawman BN Products JMB-25H Operation manual