Atlas PX-16A User manual


Revised 01/15/2020
Read this entire manual before operation begins.
Record below the following information which is located on the serial number
data plate.
Serial No.
Model No.
Date of Installation

Contents
PX-16A Specifications . . . . . . . . . 4
Installation Requirement . . . . . . . 5
Installation Steps . . . . . . . . . . . 7
Test Run . . . . . . . . . . . . . . . 29
Operation Instructions. . . . . . . . . 31
Maintenance Schedule. . . . . . . . . 32
Trouble Shooting . . . . . . . . . . . 34
Exploded View . . . . . . . . . . . . 35
PX-16A Parts List . . . . . . . . . . . 39
Warranty . . . . . . . . . . . . . . . 48

PX-16A Specifications 4
PX-16A
PX-16A Specifications
• Electric-air control system, safety self-lock mechanism
• 2-Dual synchronous cylinders are applied to assure the lifting level on both
platforms
• Skid proof diamond runway
• Integrated rear slip-plates
• Heavy duty design, fit for a wide range of vehicle car to van and light truck
• Includes Turntables
• Optional Jack (with hand pump/air-operated hydraulic pump)
• • Optional Turnplate (1 manual or air rolling jack; 2 turnplate)
Fig. 1
Lifting
Capacity
Lifting
Height
Min.
Height
Lifting
Time
Overall
Length
(Inc.Ramps)
Overall
Width
Runway
Width
Distance
Between
Runway
Gross
Weight Motor
7.3T
16000 lbs
1870mm
73 5/8”
330mm
13” 82 sec. 6964mm
274 1/8”
2390mm
94”
625mm
24 5/8”
1055mm
41 1/2”
2784Kg
6132 lbs 2.0HP

Installation Requirement 5
PX-16A
Installation Requirement
Tools Required
Rotary Hammer Drill (Φ19, Φ10, Φ4,) Carpenter’s Chalk
Hammer Screw Drivers
4 Foot Level Tape Measure (25ft)
Crescent Wrench (12”) Pliers
Ratchet & Socket (28mm) Grease gun
Wrench set (mm)
(8#, 14#, 15#, 17#, 19#)
Vise Grips
Fig. 2

Installation Requirement 6
PX-16A
Concrete Specifications
Specifications of concrete must be adhered to the specification as
following. Failure to do so may result in lift and/or vehicle falling.
1. Concrete must be 4 inches thick minimum and without reinforcing steel
bars, and must be dried totally before the installation.
2. Concrete must be in good condition and must be of test strength 3,000psi
(210kg/cm²) minimum.
3. Floors must be level and no cracks.
Power Supply
The electrical source must be 3Kw minimum. The source cable size must be
2.5mm² and in good condition of contacting with floor.

Installation Steps 7
PX-16A
Installation Steps
A. Location of Installation
Check and insure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
1. For Standard Installation: On surface installation
1.1 On surface installation foundation (See Fig. 3).
Fig. 3

Installation Steps 8
PX-16A
1.2 Illustration for on surface installation (See Fig. 4).
Fig. 4

Installation Steps 9
PX-16A
2. For Optional Installation: Flush mount installation
2.1 Flush mount installation foundation (Fig. 5).
The concrete thickness at the bottom must be at least 4 inches. The bearing
pressure must be over 460lbs/cm. All pipe must be PVC with 4 inch diameter.
Fig. 5

Installation Steps 10
PX-16A
2.2 Illustration for flush mount installation (Fig. 6).
Fig. 6

Installation Steps 11
PX-16A
B. Check the parts before assembly.
1. Packaged lift and control cabinet (See Fig. 7).
Fig. 7
2. Move aside the lift with fork lift or hoist, and open the outer packing
carefully.
2.1 Parts for on surface installation (See Fig. 8)
Fig. 8
PI
PII
91

Installation Steps 12
PX-16A
2.2 Parts for flush mount installation (See Fig. 9)
Noted: Need guide ramp for flush mount installation
Fig. 9
3. Open the parts box, check the parts according to the part list (See Fig. 10).
Fig. 10
Guide ramp
(510018)

Installation Steps 13
PX-16A
4. Check the parts of the parts bag according to the parts bag list.
4.1 Parts bag for on surface installation (See Fig. 11)
Fig. 11
4.2 Parts bag for flush mount installation (See Fig. 12)
Fig. 12

Installation Steps 14
PX-16A
C. Layout the machine and install oil
system and air line system.
1. Select a location and layout the equipment according to steps A (See Fig.
13). The control cabinet can be installed on the left or right according to
the site.
Fig. 13
PI
PII

Installation Steps 15
PX-16A
2. Connecting the oil hose and air line.
2.1 Control cabinet installed in the left of the car in direction (See Fig. 14)
Fig. 14
Connect
to the
Aof Air
solenoid
valve
PI
PII
1 Oil Hose 5/16*4450
2 Oil Hose 5/16*4200
3 Oil Hose 5/16*4500
4 Oil Hose 5/16*5960
5 Oil Hose 5/16*6100
6 Oil Hose 5/16*6300

Installation Steps 16
PX-16A
2.2 Control cabinet installed in the right of the car in direction (See Fig. 15).
Fig. 15
3. Install the oil-water separator (See Fig. 16).
Fig. 16
Connect to
the Aof Air
solenoid valve
The Oil hose
should pass
through
the oil hose
fixing slot
Connecting the air source
by the oil-water separator
67
70
83
69
68
12-11
12-8

Installation Steps 17
PX-16A
4. Connect the air source (air pressure 5kg/cm2-8kg/cm2). Adjust the air
pressure to 0.4~0.6MPa (See Fig. 17).
Fig. 17
Connect
air source
Adjust the air
pressure to
0.4~0.6MPa
Clockwise to increase
the air pressure.
Counter-clockwise to
reduce the air pressure.
Adjust the air pressure
to 0.4~0.6MPa

Installation Steps 18
PX-16A
D. Install electric system
1. Adjusting the current rating of thermal relay in control box according to
the different configurations of hydraulic power unit. In general, the electric
current of thermal relay should equal or larger than that of motor. The
following table shows rated current regulation of thermal relay in case of
different hydraulic power unit.
Hydraulic power unit Single phase /4.0HP Three phase /4.0HP
Rated current of
thermal relay 22A 14A
Fig. 18
Using cross
screwdriver to
adjust rated
current value of
thermal relay
This point shows
the present rated
current value

Installation Steps 19
PX-16A
2. Wire connection for hydraulic power unit (380V)
2.1 Connect the power wire and limit switch wire according to the Wiring
diagram (See Fig. 19).
Fig. 19
2.2 Circuit Diagram (See Fig. 20).
Fig. 20
Low
Limit
Switch
High
Limit
Switch
Motor
Wire
Hydraulic
Solenoid
Valve
Power
Wire
Ground
Wire
3 phase

Installation Steps 20
PX-16A
Electric Component
Item Name Code Specification Item Name Code Specification
1 Power switch QS 380V AC 10 Push button UP Duplex
2 Fuse FU1 25A 11 Push button LOCK Duplex
3 Fuse FU2 3A 12 Push button Down Triple
4 AC contactor KM 24V AC 13 Lower Alarm
button K Duplex
5 Thermal relay FR 12A-18A 14 Motor M Triple
6 Time relay KT 24V AC 15 Buzzer H 24V AC
7 Limit Switch SQ(1~2) 10A 16 Transformer TC 24V AC
8Hydraulic
Solenoid Valve Y1 AC 24V 17 Intermediate
relay KA 24V AC
9Air solenoid
Valve Y2 AC 24V 18 Power
indicator R 24V AC
3. Wire connection for hydraulic power unit (220V)
3.1 Connect the power wire and limit switch wire according to the Wiring
diagram (See Fig. 21)
Fig. 21
Low
Limit
Switch
High
Limit
Switch
Motor
Wire
Hydraulic
Solenoid
Valve
Power
Wire
Ground
Wire
Table of contents
Other Atlas Scissor Lift manuals
Popular Scissor Lift manuals by other brands

WERTHER INTERNATIONAL
WERTHER INTERNATIONAL SATURNUS EV40 Instruction and maintenance manual

Hy-Brid Lifts
Hy-Brid Lifts I Series Operation & safety manual

LINCOS
LINCOS U-B30 user manual

Esco
Esco miniLIFT Lift & Move Operating and maintenance manual

Oshkosh Corporation
Oshkosh Corporation JLG 1930ES Service maintenance manual

Hy-Brid Lifts
Hy-Brid Lifts HB-1230 Operation & safety manual