Autarco PELD10-MII User manual

Installation and Operation Manual
Power Export Limitation Device PELD10-MII
IM-S2.1P&3P-PELD10-MII-EN-V1.0 Manual

Contact Information
Autarco Group B.V.
Schansoord 60
5469 DT Erp
The Netherlands
www.autarco.com
info@autarco.com
Other Information
This manual is an integral part of the unit. Please read the manual carefully before installation, operation or
maintenance. Keep this manual for future reference.
Product information is subject to change without notice. All trademarks are recognized as the property of
their respective owners.
© Autarco Group B.V.
All rights reserved.
2

1 Introduction 5
1.1 Read this first 5
1.2 Target Audience 5
1.3 Intended Application 6
2 Preparation 7
2.1 Safety instructions 7
3 Overview 7
3.1 Front Panel Display 8
3.2 LED Status Indicator Lights 8
3.3 Keypad 8
3.4 LCD 8
4 Installation 9
4.1 Install location 9
4.2 Mounting the EPM 9
4.3 Electrical Connections 11
4.4 Make the Grid input cable 13
4.5 Make RS485 cable (COMM-INV port) 14
4.6 Connect the ground cable. 15
4.7 Connect and fix the CT 15
4.8 Connect the grid input to the distribution box 16
4.9 Multiple inverter connection 17
4.10 Monitoring 17
5 Commission and decommission 18
5.1 Commissioning 18
5.2 Decommissioning 18
6 Operation 19
6.1 Introduction 19
6.2 Main Menu 19
6.2.1 Information 20
6.2.2 Lock Screen 20
6.2.3 Settings 21
6.2.4 Set Time 21
6.2.5 Set Address 21
6.3 Advanced Info-Technicians Only 21
6.3.1 Inverter Power 22
6.3.2 CT connect status 22
6.3.3 Software 22
6.3.4 Model Inverter 22
6.3.5 Communication data 23
6.4 Advanced Settings-Technicians Only 23
6.4.1 Inverter Quantity Set 23
3

6.4.2 Backflow Power 23
6.4.3 Set CT Parameter 24
6.4.4 Failsafe ON/OFF 24
6.4.5 Failsafe settings 25
6.4.6 Backflow Work Mode 25
6.4.7 PELD ON/OFF 26
6.4.8 System Upgrade 27
6.4.9 Set Password 27
6.4.10 Restore Settings 27
6.4.11 Set EPM Regulator 27
7 Set Inverters 28
8 Troubleshooting 29
8.1 Checklist 29
8.2 Other Troubleshooting 29
9 Specifications 30
9.1 Single phase PELD specifications 30
9.2 Three-phase PELD specifications 31
4

1 Introduction
1.1 Read this first
This manual contains important information for use during installation and maintenance of the Power
Export Limit Device (PELD) with Autarco’s inverters.
To reduce the risk of electrical shock, and to ensure the safe installation and operation, the following safety
symbols appear throughout this document to indicate dangerous conditions and important safety
instructions.
WARNING! Indicates safety instruction, which if not correctly followed, can result in injury
or property damages.
RISK OF ELECTRIC SHOCK! Indicates safety instructions, which if not correctly followed,
could result in electric shock.
HOT SURFACE! Indicates safety instructions, which if not correctly followed, could result
in burns.
1.2 Target Audience
This manual is intended for anyone who uses Autarco inverters in conjunction with a Power Export Limiting
Device (PELD). Before any further action, the operators must first read all safety regulations and be aware
of the potential danger to operate high-voltage devices. Operators must also have a complete
understanding of this device’s features and functions.
ATTENTION! Qualified personnel means a person with valid license from the local authority in:
●Installing electrical equipment and PV power systems (up to 1000 V).
●Applying all applicable installation codes and using Personal Protective Equipment.
●Analyzing and reducing the hazards involved in performing electrical work.
WARNING! Do not use this product unless it has been successfully installed by qualified personnel in
accordance with the instructions in chapter 4 “Installation”.
5

1.3 Intended Application
This manual applies to the following products:
●S2.1P-PELD10-MII For limiting up to 10 single phase inverters at a time
●S2.3P-PELD10-MII For limiting up to 10 three phase inverters at a time
Please note that all current inverter models, excluding the UX Series, are capable of internal power export
limitation using an external current clamp or consumption meter. The internal PELD functionality is only
applicable for systems with one inverter. Please see the relevant inverter series manual for more
information. External power export limitation with the help of the PELD is possible with all inverters.
Current transformers to work with PELD with the required range must be ordered separately and are not
included. The measuring range of the current transformers must always be higher than the maximum
current in the circuit. Failing this limit, the PELD will measure incorrectly and the transformer may get too
hot.
6

2 Preparation
2.1 Safety instructions
DANGER! Do not touch any internal components whilst the PELD is in operation.
DANGER! Do not stand close to the PELD during severe weather conditions such as lighting, etc.
WARNING! The PELD may become hot during operation; please don’t touch the heat sink or peripheral
surface during or shortly after operation.
WARNING! The current transformers must always have a measuring range higher than the maximum
current in the circuit. The PELD will not measure correctly and the PELD or transformer may get
damaged.
WARNING! The installation, service, recycling and disposal of the inverters must be performed by
qualified personnel in compliance with national and local standards and regulations.
Please contact your dealer to get the information of an authorized repair facility for any maintenance
or repairmen.
Any unauthorized actions including modification of product functionality of any form will affect the
validation of warranty service; Autarco may deny the obligation of warranty service accordingly.
7

3 Overview
3.1 Front Panel Display
Figure 3.1: Front display
3.2 LED Status Indicator Lights
There are three LED status indicator lights at the front panel of the inverter, as shown in figure 3.1.
Light
Status
Description
POWER
ON
Export Device power on
OFF
Export Device power off
OPERATION
ON
Communication with inverter
OFF
No communication with inverter
ALARM
ON
Backfeed power over 100W or inverter fault.
OFF
No alarm
Figure 3.2: Status indicator lights
3.3 Keypad
There are four keys at the front panel of the PELD (from left to right): ESC, UP, DOWN and ENTER keys. The
keypad is used for:
●Scrolling through the displayed options (the UP and DOWN keys);
●Access to modify the adjustable settings (the ESC and ENTER keys).
3.4 LCD
The two-line Liquid Crystal Display (LCD) is located at the front panel of the PELD, which shows the
following information:
●PELD operation status and data
●Service messages for operators
8

4 Installation
4.1 Install location
To select a location for the PELD, the following criteria should be considered:
●The temperature of the PELD can reach up to 75℃.
●The PELD is designed to work in extended temperature range from -25℃to 60℃.
●The PELD should be installed with a minimum of 300mm clearance from other devices.
4.2 Mounting the EPM
Attach the mounting plate horizontally onto the wall. Then mark A, B and C to fix the mounting plate
(see Figure 4.1).
Figure 4.1: Bracket
Drill three holes and insert expandable plugs into the holes which make the bracket alignment. After that,
fix the bracket on the wall (see Figure 4.2). Make sure that the wall is flat.
Figure 4.2: Fix the bracket on the wall
9

Hang the PELD in the bracket by the steps below (see figure 4.3)
Figure 4.3: Hang the PELD in the bracket
Fix the two screws at the side of the bracket to secure the PELD. Do not overtighten the screws. See figure
4.4.
Figure 4.4: Fix the two screws
10

4.3 Electrical Connections
The PELD is designed for electrical connection without removing the cover. The meaning of the
symbols located at the bottom of the PELD is listed below:
Grid
AC voltage sampling terminal
CT1/2/3
AC current sampling terminals (for 1 phase, only use CT1)
Comm_INV
Communication with Autarco inverter
Communication
Connection for Monitoring Device or Software Upgrade Stick
Figure 4.5: Three-phase system with Autarco S2.3P-PELD-MII
11

Figure 4.6: Three phase system with Autarco S2.3P-PELD-MII
Figure 4.7: Single phase system with Autarco S2.1P-PELD-MII
Note that the PELD shall be installed near the measuring point for current/voltage. The CT cables and grid
input cable are usually limited in length. In order to shorten the length of the CT and grid input cable, the
PELD is recommended to be installed near the customer distribution box. The length of the cable from the
PELD to the inverters may be up to 1000 meters.
The PELD is delivered without CT’s. These must be ordered separately for the current range that has to be
measured.
12

4.4 Make the Grid input cable
●Measure the distance from the PELD to the mains distribution box. Choose the proper cable for
grid input. Use a 5-core cable for Autarco 3 phase PELD and a 3-core cable for Autarco single phase
PELD. Carefully check the connections in the connector and make sure the cables inside the
connector cannot touch each other.
●For 3 phase inverter installation, connect L1, L2, L3 to pin 1, 2, 3 and connect N to pin4, connect PE
to GND (see figure 4.8).
●For single-phase installation, connect L, N and PE and N to pin4, connect PE to GND (see figure4.8).
●Strip the end of the cables to 3mm (see Figure 4.10 and 4.11)
●Feed the cable through the washer and use a suitable screwdriver to fix the wire to the connector
(see Figure 4.12 and 4.13)
13

4.5 Make RS485 cable (COMM-INV port)
●Refer to figure 4.16, the RS485 terminals for inverter and PELD are already assembled. RS485A is
connected to yellow and RS485B to blue wire. Suggested RS485 cable: preferred 0.5-1.0mm2.
●Refer to figure 4.17, connect the communication cable between the inverter and the PELD, then
measure the distance from PELD to inverter. Use proper cable for RS485 connection 0.5-1.0mm2
14

●Follow step1 to assemble 2 connectors to each end of the cable. If the RJ45 comms ports are used
on the inverter, you also may use standard Ethernet cables for connection from one inverter to the
second one and so on. Then you only need to assemble one cable from the last inverter to PELD.
●Make sure RS485A and RS485B connect to the same pin on each inverter !
4.6 Connect the ground cable.
●The case of PELD is metal and must be grounded.
●Measure the distance from PELD to ground point, then prepare the proper grounding cable. The
ground cable may be 2.5-4 mm.
●Use an O type terminal as an accessory to connect the ground cable to PELD. (Figure 4.18)
Figure 4.18 Assemble ground cable
4.7 Connect and fix the CT
In order to measure the backflow current, the CT’s shall be installed just behind the customer’s main switch
(see figure 4.5).
Notice:
If the CT’s are installed in the wrong place or direction, the PELD will not work correctly.
●Switch off the main switch, disassemble the line cable.
●Feed the cable through the CT or use CT’s that can be split. The direction of CT is very important.
Refer to Figure 4.19, the side with text should face downstream. Reconnect the line cable to the mains
switch.
Figure 4.19 CT current pointing to inverter
15

●To prevent overheating, always make sure the secondary side of the CT’s are connected to the
PELD before switching on power.
In figure 4.20 a few examples of Current Transformers can be found. It is possible to select your own brand
and type as long as they meet the requirements and safety standards. Autarco has a limited number of
300 : 5 Current Transformers in stock and they must be ordered separately. Check space requirements in
your installation.
Figure 4.20: CT Ratio
Reminder: Set the CT Sampling Ratio in Advanced Settings; Set CT Parameter
4.8 Connect the grid input to the distribution box
The grid input cable can be connected at the inverter grid breaker or an independent breaker.
Notice:
Do not connect the grid input cable to the load breaker, it could cause inverter loss of control
when the load breaker trips. Use a separate group.
NOTICE! Do not directly connect the AC output of the inverters to any private AC equipment.
The PV inverter is designed to feed AC power directly into the public utility power grid.
Please follow figure 4.5 system diagram to connect the grid input cable to the main switch.
The cable sequence must match the PELD grid terminal sequence.
16

4.9 Multiple inverter connection
Please follow figure 4.5 system diagram to connect multiple-inverters. The S2.1P-PELD10-MII and
S2.3P-PELD10-MII can control a maximum of 10 inverters.
The inverters may be different models. The firmware of the inverter must support PELD use.
It may be necessary to make custom RS485 cables if mixed models are used.
The inverter RS485 address must be set to different values: please set address from 01 to 09.
Before starting up the inverter, please follow 6.5.1 to set the inverter number in the PELD.
4.10 Monitoring
Inverters that are connected to the PELD can be monitored by Autarco Ethernet/WiFi/GPRS stick or box.
WiFi/GPRS/Ethernet stick is used for single inverter monitoring. In case of a single inverter, always check if
using the internal PELD function with an external meter is an alternative. It depends on the power and
installation if this is feasible.
For multiple inverters, always use a LAN/GPRS-BOX or Digital Monitoring stick.
If a PELD is installed on an existing installation, always check if the inverters and monitoring firmware are
correct for this application. LAN/Wifi-box firmware must be 2 March 2021 or later.
Notice: When an inverter is connected to PELD, no other monitoring device is allowed to
be connected to the inverter.
17

5 Commission and decommission
5.1 Commissioning
●Connect the CT connectors, grid input terminal, RS485 terminal (INV) and monitoring device (if
needed) to the PELD. Connect the other end of RS485 cable to the inverter(s).
Figure 5.1 Cable connections
●Close the breaker of the grid input and start up PELD
●The power LED(red) will light up. After the LCD-screen has started up, press up or down to check if
the active power is positive or 0. If the active power is negative, please check the direction of the
CT’s.
●Set the inverter number to match the number of connected inverters..
●Follow the instructions of the inverter to start up the inverter. If the PELD communicates with the
inverter successfully, the green LED will light.
●The default allowed backflow power is 0. Please follow par. 6.5 to change the allowed backflow
power if needed.
5.2 Decommissioning
In order to avoid the backflow power to the grid, please stop the inverter before stopping the PELD.
●Turn off the grid breaker of the inverter.
●Turn off the PV input breaker.
●Turn off the grid input breaker of PELD.
●Disconnect all cables of PELD, disassemble PELD after 5 minutes.
18

6 Operation
6.1 Introduction
During normal operation, the display alternately shows the power of the grid side and the operation
‘’Status’’. Screens can also be scrolled manually by pressing the UP and DOWN keys. Press the ENTER key to
access to the Main Menu.
There are 4 status messages:
●Normal: The system works normally.
●RS485 AllFail: PELD has lost communication with ALL inverters
●CT FailSafe: Current Sensor has failed.
●RS485 Fail: PELD has lost communication with one or more inverters
If you see a fault message, check all wiring and make sure RS485 + and – are wired the same on all
inverters. For easy debugging: keep the same inverter number order on the bus as the cable circuit.
Measure the voltage at each inverter between the A and B pin: it should be around 1.6 V.
Some settings/readings are not applicable for single phase systems.
6.2 Main Menu
There are four submenus in the Main Menu (see figure 6.1)
●Information
●Settings
●Advanced Info.
●Advanced Settings
19

6.2.1 Information
Autarco PELD main menu provides access to operational data and information. The information is displayed
by selecting ‘’Information’’ from the menu and then scrolling up or down through the list. See figure 6.1.
Figure 6.1: Information list
6.2.2 Lock Screen
Pressing the ESC key returns to the Main Menu. Pressing the ENTER key locks (Figure 6.2(a)) or unlocks
(Figure 6.2 (b)) the screen.
Figure 6.2: Locks and Unlocks the screen of LCD
20
This manual suits for next models
2
Table of contents
Other Autarco Inverter manuals

Autarco
Autarco MX3000 User manual

Autarco
Autarco UX-MII-Series User manual

Autarco
Autarco UX Series User manual

Autarco
Autarco 4G-STICK User manual

Autarco
Autarco XLX20000S User manual

Autarco
Autarco LH Series User manual

Autarco
Autarco SX700 User manual

Autarco
Autarco OX Series User manual

Autarco
Autarco MX Mark III Series User manual

Autarco
Autarco SX Mark III Series User manual