
5
Install the New PSU
To install the new PSU:
1Carefully insert the new PSU into position in the Stage Rack.
• Make sure the switch is aligned and passes through its opening in the chassis back panel.
• Make sure the power harnesses are not underneath the PSU.
• Make sure the PSU seats fully into position.
2Using a #1 Philips screwdriver, replace the four screws shown in Figure 10 that secure the PSU to the Stage Rack.
3Using a #1 Philips screwdriver, replace the two screws shown in Figure 9 that secure the power switch for the PSU to the chassis.
4Carefully connect the 24-pin power cable from the new PSU to its port on the Controller assembly as shown in Figure 8.
5Secure the PSU power harness to the Stage 64 by replacing the cable ties you removed previously.
6Proceed to Reinstall I/O Cards.
Reinstall I/O Cards
After installing the new PSU, reinstall all I/O cards.
Reinstall all Input and Output Cards into the Stage 64 by doing the following:
1Make sure the latches on the port on the back of each card are pushed inward (closed).
2Gently slide the first card into its slot. Make sure that the card is oriented correctly in the unit, with the mounting guide pin and port
at the top, and also be sure to insert the card straight so that it fits along the slot channel built into the unit.
3Inside the back of the unit, make sure the pin at the top of each card aligns with the corresponding chassis guide hole (Figure 11).
4Push the card into the slot so it is flush with the front panel, and tighten the two captive thumbscrews on the front of the card to secure
it to the Stage unit.
5Inside the back of the Stage unit, tighten the single captive thumbscrew to secure each card to the chassis.
Make sure the port latches are pushed inward before proceeding.
Figure 11. Guide pins and guide holes inside the Stage 64
If the card does not slide all the way into the slot, make sure the latches on the port of the card are pushed fully inward.