Viscosity Process Analyzer VISC-4
Contents
9.1 Safety ...................................................................................................................................... 105
9.2 Fault analysis ........................................................................................................................... 107
9.3 Starting up after rectifying a fault............................................................................................... 112
10 Maintenance......................................................................................113
10.1 Safety ...................................................................................................................................... 113
10.2 Maintenance plan..................................................................................................................... 116
10.3 Cleaning the touchscreen and other components........................................................................ 116
10.4 Rinsing and emptying product-carrying components................................................................... 118
10.4.1 Products with low to normal viscosity ................................................................................... 118
10.4.2 Highly viscous products (special case of the variants Ht or Hv) ............................................... 120
10.5 Cleaning of product-carrying components (highly viscous products) ............................................. 124
10.6 General visual inspection........................................................................................................... 124
10.7 Checking the safety equipment.................................................................................................. 126
10.8 Checking the pressure monitor.................................................................................................. 127
10.9 Bleeding the differential pressure transmitter ............................................................................. 128
10.10 Replace the Peltier elements ..................................................................................................... 129
10.11 Turning out the swing arm with the measuring unit..................................................................... 134
10.12 Replacing the mass flow meter.................................................................................................. 136
10.12.1 Removing the mass flow meter ............................................................................................ 136
10.12.2 Installing a mass flow meter ................................................................................................ 137
10.13 Replacing the capillary unit........................................................................................................ 138
10.13.1 Removing the insulation container........................................................................................138
10.14 Turning the swing arm back and fixing it in place ....................................................................... 145
10.15 Checking the residual-current device (RCD)................................................................................ 146
10.15.1 Measures after the RCD has triggered .................................................................................. 147
10.15.2 Measures in case of troubles ............................................................................................... 147
10.16 Replacing the battery on the industry PC.................................................................................... 148
10.17 Measures after maintenance ..................................................................................................... 149
11 Dismantling .......................................................................................151
11.1 Safety ...................................................................................................................................... 151
11.2 Preparing for dismantling .......................................................................................................... 152
11.3 Disconnecting electrical connections.......................................................................................... 152
11.4 Disconnecting pipe connections ................................................................................................ 152