Battery Supplies AQ-TRON SOL/AQT1H3M1 User manual

1
MANUAL AQ-TRON
Hybrid Inverter
Nijverheidslaan +50/56, B-8540 Deerlijk - BELGIUM
Tel +32 56 617 977 - Fax +32 56 617 955
AQ-TRON® HYBRID INVERTER 3kVA
and 5kVA
User Guide
SOL/AQT1H3M1
AQ-TRON® 3 kVA hybrid inverter kit
SOL/AQT1H5M1
kit hybrid inverter 5 kVA with one ba�ery - 3 kW
charge/discharge
SOL/AQT1H5M2
AQ-TRON® 5 kVA hybrid inverter kit
27/12/2022
Version V1.3

2
MANUAL AQ-TRON
Hybrid Inverter
Nijverheidslaan +50/56, B-8540 Deerlijk - BELGIUM
Tel +32 56 617 977 - Fax +32 56 617 955
Contents
1
AQ-TRON® HYBRID Inverter Introducon ....................................................................................................................... 3
2
Safety regulaons............................................................................................................................................................ 4
2.1
Safety regulaons................................................................................................................................................... 4
2.2
Installand maintenance Notes...................................................................................................................... 4
2.3
Symbols on the inverter ......................................................................................................................................... 5
3
Installaon ...................................................................................................................................................................... 7
3.1
Product Overview................................................................................................................................................... 7
3.2
Packing List............................................................................................................................................................. 8
3.3
InstallEnvironment........................................................................................................................................ 8
3.4
InstallTools.................................................................................................................................................... 9
3.5
Installaon Posion............................................................................................................................................... 10
3.6
Mount AQ-TRON® HYBRID inverter ..................................................................................................................... 11
4
Electrical Connecon .................................................................................................................................................... 12
4.1
Baery connector................................................................................................................................................. 13
4.2
PV Connecon...................................................................................................................................................... 13
4.3
CT / CAN / RS485 / NTC connecon ..................................................................................................................... 15
4.4
Grid Connecon.................................................................................................................................................... 17
4.5
Criload connec (EPS funcn )............................................................................................................... 17
5
Conneng an AQ-TRON® HYBRID inverter in a three-phase grid................................................................................ 19
5.1
Principle................................................................................................................................................................ 19
5.2
Setup .................................................................................................................................................................... 19
6
Buons and indicator lights .......................................................................................................................................... 24
6.1
Buons................................................................................................................................................................. 24
6.2
Indicator lights and status of AQ-TRON® HYBRID inverter................................................................................... 24
7
Operaon ...................................................................................................................................................................... 25
7.1
Double Check ....................................................................................................................................................... 25
7.2
First install(IMPORTANT!) ........................................................................................................................... 25
7.3
Commissioning ..................................................................................................................................................... 28
7.4
Menu.................................................................................................................................................................... 28
7.4.1
Basic seng................................................................................................................................................. 29
7.4.2
Advanced seng ......................................................................................................................................... 34
7.4.3
Event List...................................................................................................................................................... 37
7.4.4
System informaon interface....................................................................................................................... 38
7.4.5
Energy Stascs........................................................................................................................................... 39
7.4.6
Soware upgrade ........................................................................................................................................ 40
8
Technical data ............................................................................................................................................................... 41
9
Troubleshoong ............................................................................................................................................................ 43

3
MANUAL AQ-TRON
Hybrid Inverter
Nijverheidslaan +50/56, B-8540 Deerlijk - BELGIUM
Tel +32 56 617 977 - Fax +32 56 617 955
1
AQ-TRON® HYBRID Inverter Introduc�on
The AQ-TRON® HYBRID inverter is used in a PV system with bery storage.
The energy produced by the PV system will be opmized for maximum self-consumpon.
The AQ-TRON® HYBRID inverter can operate in auto or me-of-use (TOU) mode, charging/discharging the ery as
needed. In auto mode, the inverter charges the excess PV energy in the ry and discharges the ry to supply
power to the local load when the PV energy ient.
In case of power failure, the AQ-TRON® HYBRID inverter can operate in emergency power supply (EPS) mode. The AQ-
TRON® HYBRID inverter will use power from the PV panels and energy stored in the baery to power the crical load.
Fig. 1 Schemarepresentaon

4
MANUAL AQ-TRON
Hybrid Inverter
Nijverheidslaan +50/56, B-8540 Deerlijk - BELGIUM
Tel +32 56 617 977 - Fax +32 56 617 955
2
Safety regula�ons
Make sure you read and understand this manual before install AQ-TRON® HYBRID inverter strictly complies
with safety regin design and tesg. During installon and maintenance, users must comply with
local safety regmproper opern may cause electric shock or damage to equipment and property.
2.1
Safety regula�ons
Electrical installaon and maintenance must be performed by qualied electricians according to local
regulaons.
The AQ-TRON® HYBRID inverter must be installed only by qualied electricians, and only those with the
appropriate acon as required by local authories.
DO NOT place explosivemmable materials such as gasoline, kerosene, diesel, oil, wood paste,
on or rags near teries or the AQ-TRON® HYBRID Inverter.
First disconnect the AC conneen disconnect the connec betwry and PV (PV1&PV2),
then wait at least 5 minutes (discharge capacitors) before performing maintenance to avoid electric shock.
The inverter must be completely disconnected (BAT, PV & AC) during maintenance.
The inverter may become very hot during o. Turn the inverter and wait for the inverter to
cool down before performing maintenance.
Keep children away from baies and AQ-TRON® HYBRID inverter.
It is NOT permi to open the front cover of the AQ-TRON® HYBRID inverter. This will void the product
warranty.
AQ-TRON® HYBRID inverter damaged due to improper install/operaNOT covered by the
product warranty.
2.2
Installa�on and maintenance Remarks
The ba more than 60% charged before delivery and must be protected from short circuits
during transportaon and install
The inverter/bies should be placed in a well-veed place. Do not place the inverter/baies in an
air or poorly veed room or cabinet. This can be very detrimental to the performance and life of the
system.
Keep the inverter/baies away from direct sunlight. Do not put AQ-TRON® HYBRID inverter/baeries close to
an ovene. It may cause y to leak even to explode.
The current capacity of DC cables (from baery to inverter) should be at least 90 A. Use short DC cables to
avoid high voltage drop and current loss.
Use a mulmeter to check baltage and polarity before turning on the bies. Make sure the
ons are correct according to this manual.
Use a mulmeter to check the PV voltage and polarity before turning on the PV isolator. Make sure the
ons are correct according to this manual.
If you want to store the eries without using them, they should be disconnected from the inverter and
stored in a cool, dry and venlated environment.
y maintenance operators must have the knowledge and technical skill for bery maintenance;

5
MANUAL AQ-TRON
Hybrid Inverter
Nijverheidslaan +50/56, B-8540 Deerlijk - BELGIUM
Tel +32 56 617 977 - Fax +32 56 617 955
All bies connected in parallel must be of the same model and have the same rmware version. This is a
design issue that must be considered by the designer/installer, especially when replacing baies or
modifying an exisng energy storage system.
AQ-TRON® HYBRID inverter has no transformer, therefore the posive pole and the nve pole of the PV
generator are NOT grounded. Otherwise, this will cause inverter failure. In the PV system, all non current-
carrying metal parts (such as: PV module frame, PV rack, combiner box housing, inverter housing) should
be connected to ground.
Warning: follow the following rules when installing/maintaining the bery.
A.
Ta your watch, ring and other metal objects.
B.
Use only tools with insulated handles.
C.
Wear rubber gloves and shoes.
D.
Do not place tools or metals above the bery.
E.
Turn othe AQ-TRON® HYBRID invertereries before conneonnecng the ry
terminals.
F.
The posive/nve poles of the baery must be isolated from ground.
2.3
Symbols on the inverter
On the inverter there are some symbols related to safety. Please read and understand the contents of the
symbols before installing the system.
This symbol indicates a hazardous situa that could result in injury if not avoided.
Risk of electric shock and wait at least 5 minr turning othe inverter.
Beware of high voltage and electric shock.
Beware of hot surfaces.
Meet Conformity Europeanness (CE) cercaon.

6
MANUAL AQ-TRON
Hybrid Inverter
Nijverheidslaan +50/56, B-8540 Deerlijk - BELGIUM
Tel +32 56 617 977 - Fax +32 56 617 955
Earth terminal.
Please read this manual before installing the AQ-TRON® HYBRID inverter.
This indicates the equipment's degree of pron according to IEC Standard 70-1 (EN
60529 June 1997).
Posive pole and negave pole of DC voltage (PV & Bery).
The AQ-TRON® HYBRID converter should always be transported, handled and stored so
that the arrows always point upwards.

7
MANUAL AQ-TRON
Hybrid Inverter
Nijverheidslaan +50/56, B-8540 Deerlijk - BELGIUM
Tel +32 56 617 977 - Fax +32 56 617 955
3
Installa�on
3.1
Product Overview
AQ-TRON® HYBRID inverter is 100% strictly checked before package and delivery. It is prohibited to turn the AQ-
TRON® HYBRID inverter upside down during delivery.
CAUTION
Check the product packaging andngs carefully before installaon.
Fig. 2 AQ-TRON® HYBRID
inverter overview
1
DC switch
6
Current transformer port
2
y input terminals
7
Charging port conne
3
PV input terminals
8
Port for mains connecon
4
Wi-Fi/GPRS sck
9
LCD
5
BMS communicaon port
10
Vent valve

8
MANUAL AQ-TRON
Hybrid Inverter
Nijverheidslaan +50/56, B-8540 Deerlijk - BELGIUM
Tel +32 56 617 977 - Fax +32 56 617 955
3.2
Packing List
Inspect the package and ngs carefully before installaon. You should have the followingngs:
Moung bracket × 1
AC connecon × 6
M5 screw × 2
y terminal × 2
M6 sher × 8
Expansion bolts × 8
Connen cap × 4
CT connec × 2
Current transformer × 1
User manual × 1
Warranty Card × 1
Quality Cercate × 1
Communon cable × 1
PV+
input connecon×2
PV-
input connecon×2
NTC×1(long-3M)
3.3
Installa�on
Environment
Fig. 3 Accessories of the inverter
Choose a dry, clean,dy place suitable for installaon
Ambient temperature range: -25°C ~ 60°C
Relave humidity: 0 ~ 100% (non-condensed)
The inverter should be installed in a well-veed loon.
mable or explosive materials near the AQ-TRON® HYBRID Inverter.
The AC overvoltage category of the inverter is category III
Maximum altude: 2000m

9
MANUAL AQ-TRON
Hybrid Inverter
Nijverheidslaan +50/56, B-8540 Deerlijk - BELGIUM
Tel +32 56 617 977 - Fax +32 56 617 955
3.4
Installa�on Tools
Before installa�on, prepare the following tools:
No. Tools Model Func�on
1
Hammer drill
Recommended drill bit dia.6mm
Used to drill holes in the wall
2
Screwdriver
wiring
3
Wire stripper
Strip wire
4
4mm Allen wrench
Turn the screw to connect the back
panel to the inverter
5
Crimping tools
Used to crimp power cables
6
Mul�meter
Used to check grounding
7
Marker
Used to mark signs
8
Tape measure
Used to measure distances
9
Level Used to verify that the rear panel is
properly installed
10
ESD gloves
Operators wear
11
Safety glasses
Operators wear
12
Dust mask
Operators wear

10
MANUAL AQ-TRON
Hybrid Inverter
Nijverheidslaan +50/56, B-8540 Deerlijk - BELGIUM
Tel +32 56 617 977 - Fax +32 56 617 955
OK
NO
3.5
Installa�on Posi�on
The AQ-TRON® HYBRID inverter must be mounted ver�cally (to ensure rapid heat dissipa�on), choose a posi�on
without direct sunlight / snow accumula�on to install AQ-TRON® HYBRID inverter. The installa�on site must be well
ven�lated.
Fig. 4 Installa�on posi�on of the AQ-TRON® HYBRID inverter

11
MANUAL AQ-TRON
Hybrid Inverter
Nijverheidslaan +50/56, B-8540 Deerlijk - BELGIUM
Tel +32 56 617 977 - Fax +32 56 617 955
3.6
Mount AQ-TRON® HYBRID Inverter
Step 1: Posion the moung bracket correctly on the wall, mark these 8 drill holes with a marking pen. Drill 8 holes
(drill 6mm) in the wall.
Step 2: Insert the expansion screw vercally into the hole, pay eto the inseron depth. (not too shallow or too
deep)
Step 3: ach the moung bracket to the wall with bolts andwashers.
Step 4: Place the AQ-TRON® HYBRID inverter on the mounng bracket.
Step 5: Ground the inverter through the grounding hole on the heat sink.
Step 6: OPTIONAL: You can lock the AQ-TRON® HYBRID inverter to the ng bracket.
Step 5Step 6

12
MANUAL AQ-TRON
Hybrid Inverter
Nijverheidslaan +50/56, B-8540 Deerlijk - BELGIUM
Tel +32 56 617 977 - Fax +32 56 617 955
4
Electrical Connec�on
CAUTION
High voltages in power conversion circuits. Danger to life from electric shock or severe burns.
All work on the PV modules, inverters andry systems should only be performed by qualied
personnel.
Wear rubber gloves and protee clothing (goggles and boots) when working on high
voltage/high current systems, such as the INVERTER and bery systems.
CAUTION
The AQ-TRON® HYBRID inverter is intended for use in a PV system with bay storage. If the
inverter is not used as intended, the prote provided by the equipment may be adversely
ed.
Fig. 5 Electrical
connecons

13
MANUAL AQ-TRON
Hybrid Inverter
Nijverheidslaan +50/56, B-8540 Deerlijk - BELGIUM
Tel +32 56 617 977 - Fax +32 56 617 955
4.1
Baery connector
Fig. 6 Bay conneeasure polarity/voltage of baery wires before connecon)
Step 1: Loosen 4 screws (A) with a screwdriver (Fig. 6);
Step 2: Remove the waterproof cover (B), loosen the swivel (C), and then remove the plug (G); Step 3: Route
ry cables (F) through the swivel, and then connect try cables with the OT clamp (E); Step 4:
Secure the waterproof cover with 4 screws.
If mulbaeries are connected to one inverter, a bus bar must be used. Make sure that the
inverter connecon is in the middlery connecon is on the leght. This way you
will ensure that the power distribuon is correct.
4.2
PV Connecon
Recommended DC input cable specicaons.
Cross-seconal area (mm2)
External cable diameter (mm2)
Range
Recommended
value
4.0~6.0
4.0
4.5~7.8
Procedure:
Step 1 Preparing the posive and nee power cables
1. Posive metal contact 2. Nve metal contact
Fig. 7 preparaon PV posive and negave power cable

14
MANUAL AQ-TRON
Hybrid Inverter
Nijverheidslaan +50/56, B-8540 Deerlijk - BELGIUM
Tel +32 56 617 977 - Fax +32 56 617 955
Step 2 Insert the PV's crimped posi�ve and nega�ve power leads into the corresponding PV connectors
3.
Posi�ve plug 4. Nega�ve plug
Fig. 8 prepara�on PV posi�ve and nega�ve connec�ons
Step 3 Check that the DC voltage of each PV string is below 600 V DC and that the polari�es of the PV power cables
are correct. Insert the posi�ve and nega�ve connectors into the AQ-TRON® HYBRID inverter un�l you hear a "click"
sound, as shown in Fig. 9.
1. Bayonet
Fig. 9 Connec�ng PV connectors
CAUTION

15
MANUAL AQ-TRON
Hybrid Inverter
Nijverheidslaan +50/56, B-8540 Deerlijk - BELGIUM
Tel +32 56 617 977 - Fax +32 56 617 955
Before removing the PV posi�ve and nega�ve connectors, make sure the DC
SWITCH is set to OFF.
Follow-up procedure
Use an MC4 wrench to disconnect the PV connectors, as shown in Fig. 10.
Fig. 10 Disconnec�ng PV connectors
4.3
CT / CAN / RS485 / NTC connec�on
For single-phase setup, a CT (current transformer) is installed. This is described in steps 1 to 5 below
For three-phase setup, NO CT may be installed but a CHINT power meter may be installed. Steps 1 to
5 are not performed but do follow the steps of sec�on 5
CT (current transformer) can measure the value and direc�on of alterna�ng current. Refer to Fig. 11 for the
proper connec�on of CTa.
Fig. 11 CTa connec�on
Step 1: You can use network cable and terminal caps to extend the CT wires if necessary, the maximum CT cable
length is 200m.
CT wire
Extension cable (network cable)
AQ-TRON® HYBRID
inverter
Red
Orange / white orange / brown /
white brown
CT+
Black
Green / white green / blue / white
blue
CT

16
MANUAL AQ-TRON
Hybrid Inverter
Nijverheidslaan +50/56, B-8540 Deerlijk - BELGIUM
Tel +32 56 617 977 - Fax +32 56 617 955
Fig. 12 CT / CAN / RS485 / NTC connecon
Step 2: Loosen 4 screws (part A) with a screwdriver (Fig. 12)
Step 3: Remove the waterproof cover (part B), loosen the swivel (part C) and then remove the plug
n G)
Step 4: Route the CT cable through the swivel, connect the CT cable to the CT terminal and then plug the CT
terminal into the corresponding ports.
Step 5: Con, do not connect the CT around the power cable unl the CT is connected to the inverter
Refer to Fig. 11 for the correct posif the CTa. Wrap the CT around the L-wire of the incoming mains, making sure
that the arrow direthe CT is "house → mains".
Step 6: Take the special communica�on cable provided in the kit. This is marked "sofar" in the middle of
the cable. Chances are there is a standard communica�on cable included in the box, but you should not use
it. Connect the 'inverter' plug on the inverter side, the plug
'BMS' or 'ba on the side of the bery
Communon cable between bay & AQ-TRON® HYBRID
inverter
CAN communicaon
AQ-TRON® HYBRID Inverter
CAN port CANH---pen1 CANL---pen2
ENERGYBOX HYB
CAN port CANH--pen5 CANL--pen4
Step 7: DO NOT connect the NTC sensor, this is for lead-acid beries only:
Step 8: aach the waterproof cover with 4 screws.

17
MANUAL AQ-TRON
Hybrid Inverter
Nijverheidslaan +50/56, B-8540 Deerlijk - BELGIUM
Tel +32 56 617 977 - Fax +32 56 617 955
4.4
Grid Connec�on
Step 1: Loosen 4 screws (part A) with a screwdrive14)
Step 2: Remove the waterproof cover (part B), loosen the swivel (part C) and then remove the plug
n G)
Step 3: Route a 3-wire cable through the GRID gland, then connect 3 wires to the corresponding
terminal blocks. (BROWN - L, BLUE - N, YELLOW/GREEN - PE)
Step 4: Ach the waterproof cover with 4 screws.
Fig. 14 Mains and
load connecon
4.5
Cri�cal load connec�on (EPS func�on )
Cri load: if the grid fails and the EPS funcn is enabled, the inverter operates in EPS (emergency power) mode and
uses the PV power and the energy stored in the ry to supply power to the crical load via the connecon port LOAD.
LOAD connecon port is for connecriloads only. The power r crical loads must be less than
3000VA. The connec procedure of LOAD port is the same as that of mains connec 14). The shape of the
AC voltage does not exhibit an exact sine wave, Ba Supplies is not responsible if certain connected devices do
not work due to an abnormal wave.
Change posi�ons
CAUTION
The changeover switch is necessary.
Make sure the changeover switch is in posion 0 while checking/repairing the cri
load.
When checking/repairing the AQ-TRON® HYBRID inverter, make sure that the
inverter switch is in posion 0 and that the AQ-TRON® HYBRID inverter is
disconnected from the grid.
Under normal condions: inverter is set to posion 1. AQ-TRON® HYBRID inverter can supply power to
crical load in case of power failure.

18
MANUAL AQ-TRON
Hybrid Inverter
Nijverheidslaan +50/56, B-8540 Deerlijk - BELGIUM
Tel +32 56 617 977 - Fax +32 56 617 955
If the AQ-TRON® HYBRID inverter is faulty, manually move the switch to posi�on 2. The grid will supply
power to the cri�cal load.
Fig. 15 Changeover switch connec�ons

19
MANUAL AQ-TRON
Hybrid Inverter
Nijverheidslaan +50/56, B-8540 Deerlijk - BELGIUM
Tel +32 56 617 977 - Fax +32 56 617 955
5
Connec�ng an AQ-TRON® HYBRID inverter in a three-
phase grid
5.1
Principle
The AQ-TRON® HYBRID inverter can also be used in a three-phase grid (both 3x400V and 3x240V). In this
case a CHINT three-phase meter is required, it replaces the mono-phase current transformer.
The AQ-TRON® HYBRID inverter then works with phase compensa�on: although it is connected to one phase, it
will try to bring the SOM of all currents of all phases to zero as much as possible.
5.2
Setup
1. Place the chint 3-phase energy meter DTSU666 (BAT/50798) between the loss current switch and the
general low voltage board. Connect the cables from the loss current switch to terminals 3/6/9/10.
From terminals 1/4/7/10, the cables leave to the ALSB. CAUTION! The current sense in the Chint
energy meter determines correct opera�on of the system.

20
MANUAL AQ-TRON
Hybrid Inverter
Nijverheidslaan +50/56, B-8540 Deerlijk - BELGIUM
Tel +32 56 617 977 - Fax +32 56 617 955
Installa�on in a 3x400V+N grid
This manual suits for next models
4
Table of contents