
‘
EZE BASE’ INSTRUCTIONS
BillyOh.com – Grassthorpe Road – Sutton on Trent – Newark – Nottinghamshire – NG23 QX – Tel. 0870 777 8891
STEP 3: NAILING OUTERS AND STRETCHERS TOGETHER
Nail through the outers into either end of the other stretchers. This is the
strongest way of securing the structure and the easiest. To further strengthen
the structure it is recommended that each stretcher end be nailed in two
equally spaced positions.
STEP 4: SQUARING OFF THE FRAMING
Measure across the diagonals, checking that both
measurements match, ensuring that the frame is now
square.
STEP 5: SCREWING ‘L’ BRACKETS ONTO FRAME (OPTIONAL)
If the ground you wish to place your Eze Base and building on is not level then it is
necessary to add the ‘L’ brackets provided to level out the Eze Base. Throughout
this STEP use a spirit level to assess progress. Screw the ‘L’ brackets where
required from the inside of the outer framing. Bear in mind you may not need to
use all the brackets.
NOTE: Any pare ‘L’ bracket can be u ed to trengthen the corner (refer to OPTIONAL STEP 7).
STEP 6: SCREWING THE CORNER ANCHORS TO THE CORNERS AND FIXING IN PLACE
Screw the four corner anchors to each inner corner of the base framing ensuring the
anchors are flush with the top of the base frame. Then drive the Eze Base into the
ground to the desired height ensuring the base is level (use spirit level).
Once fixed in position it is recommended that you pack any gaps beneath the Eze
Base and ground. This will help to protect the base from weathering and create a
neater finish.