2
IceZone®X INSTALLATION INSTRUCTIONS BioZone Scientific provides ice machine specific instructions for many styles of ice
machines. Please download these instructions from the IceZone® X installation page on
BioZone Scientific’s website: http://biozonescientific.com/icezone-installation-maintenance
The following steps outline general guidelines for IceZone® X installation on cuber style ice machines.
© BioZone Scientific International
Tools Needed For Installation
• 8 Foot Ladder
• Knife or Hose Cutter
• Power Drill
• Phillips Head Screwdriver
STEP 2: DRILL SUPPLY & RETURN PORTS
STEP 1: IDENTIFY INSTALLATION LOCATION
For best results, clean and sanitize the ice machine and all attached ice bins and dispensers
thoroughly before installing IceZone®X
Only a maintenance mechanic or appropriately qualified person may
install the appliance
Turn power off to the ice machine
Do not connect IceZone®X to water supply under any circumstances
Verify the availability of a wall plug within 8 ft. of the IceZone®X installation
•
•
•
•
•
To determine the best location for your ice machine, start by looking for areas of mold
growth and choose a position for IceZone®X that will provide maximum treatment
to that area.
It is recommended that the IceZone®X be mounted on top of the ice machine. To avoid
condensation, do not mount IceZone®X with the supply and return ports pointing up.
Mark the location for the supply and return ports on the ice machine according
to these steps:
There are many different types of ice machines so there is no single “right” IceZone®X installation.
However to achieve maximum effectiveness, the correct placement of the IceZone®X is very important.
Below are a couple typical examples of IceZone®X installations.
Supply and return fittings and tubing should be installed above the ice levels
Supply should be positioned to target areas that are vulnerable to slime buildup
with photoplasma
Supply and distribution lines should be
positioned as far apart as possible to
maximize distribution of photoplasma
Photoplasma is heavier than air, so install
the supply line relatively high, and the
return line relatively low
•
•
•
•
OUTSIDE
ICE MACHINE
INSIDE
ICE MACHINE
EXPANDED VIEW OF SUPPLY FITTING
Remove top panel or cover to be drilled. Drill
the 1” (25mm) holes for the bulkhead fittings.
Clean the drilling debris from the holes in the
ice machine. Install the fittings for the supply
and return ports.
Ice Machine Cuber Mounted
on Beverage Dispenser
Ice Machine Cuber
Mounted on Ice Bin
Ice and Water Dispenser
FLAT MOUNT
Ports Horizontal
SIDE MOUNT
Ports Horizontal
SIDE MOUNT
Ports Down
SIDE MOUNT
Ports Up
How IceZone®X Works
Prior To Installation
Typical IceZone®X Installations
IceZone® X creates an environment that inhibits the
growth of contamination by disinfecting the air and
surfaces in the treated area.
IceZone®X