Installation
The unit must be installed by a competent person, on a firm level surface capable of supporting the
weight of the machine when the bath is filled. Please ensure that the unit is positioned at least 100mm
from any other surfaces, as it is important that the ventilation openings in the machine are not blocked
and allow the free movement of air. Inadequate ventilation will shorten the life of the fridge system.
Note: At this stage do not connect the unit to the electrical supply
Ensure that the ventilation openings are not blocked, to allow free movement of air through
the unit. Failure to do this will seriously affect the reliability of the fridge, invalidate the
warranty and shorten the life of the fridge system.
Locate a container beneath the bath overflow to prevent any water spillage as the bath is
filled and when ice is formed in the bath.
Fill the bath using cold water through the ‘Bath Fill’ opening on the top of the machine until
water is displaced from the overflow.
Connect the dispense python to the ‘Recirculation’ Flow and Return.
Connect the product to the stainless steel product coils if fitted.
Connect the unit to the electrical supply and turn on.
After a short delay the compressor and fans will start.
The unit will now begin to reduce the bath water temperature. Once the water is at the
correct temperature, an ice bank will begin to form. As the ice begins to form, a small
amount of water will be displaced.
Once a full ice bank is produced, the fan and compressor will switch off and the machine is
ready for use.
Note: The time taken for the unit to reach operating temperature will vary depending on ambient
temperature, humidity and the temperature of the incoming water supply.