Cafection Avalon Galleria Manual

INSTALLATION AND SERVICE
MANUAL for AVALON
Galleria and Quatro
Manufactured by:
Cafection Enterprises Inc.
2355, Dalton, Quebec, (Quebec) G1P 3S3 Canada
Tel.: 1-800-561-6162 Fax: 1-800-463-2739

AVALON GALLERIA Rev. 8 04/2013
www.cafection.com (800) 561-6162
2
INSTALLATION AND SERVICE MANUAL for AVALON Galleria and Quatro
Table of Contents
1 SAFETY INSTRUCTIONS.........................................................................................................5
1.1 Food-Contact Parts.................................................................................................5
1.2 Warnings..................................................................................................................5
1.3 Power supply...........................................................................................................5
1.4 Disconnect the equipment if:.................................................................................5
2 WARRANTY..............................................................................................................................6
2.1 Warranty policy .......................................................................................................6
2.2 Warranty return procedure.....................................................................................7
2.3 Transport liabilities .................................................................................................7
3 INITIAL SETUP .........................................................................................................................8
3.1 On-site installation requirements..........................................................................8
3.1.1 Operating environment..........................................................................8
3.1.2 Power supply..........................................................................................8
3.1.3 Water supply...........................................................................................8
3.1.4 Tools required ........................................................................................8
3.1.5 Clearances ..............................................................................................8
3.2 Unpacking................................................................................................................9
3.3 Leveling the equipment........................................................................................10
3.4 Hot water tank preparation...................................................................................10
3.4.1 Tank lid preparation .............................................................................10
3.4.2 Adjustingthetankoverowoat .......................................................11
3.5 3 Beans canister installation (for the Galleria model) .......................................12
3.5.1 Install the 3 beans canister .................................................................12
3.5.2 Lock the cover of the grinder protector.............................................12
3.6 Water line connection...........................................................................................13
3.7 Electrical connection............................................................................................14
3.8 Water temperature ................................................................................................15
3.9 Driptrayandoverowinstallation ......................................................................16
3.9.1 Overowdriptrayinstallation ............................................................16
3.9.2 Drip tray installation ............................................................................17
3.10 Loading products..................................................................................................18
3.11 Chute system installation.....................................................................................19
3.12 Brewer and whipping system ..............................................................................20
Table of Contents

AVALON GALLERIA Rev. 8 04/2013
INSTALLATION AND SERVICE MANUAL for AVALON Galleria and Quatro
3
www.cafection.com (800) 561-6162
Table of Contents
3.13 Filter paper installation......................................................................................... 22
3.14 Testing installation................................................................................................ 23
3.15 Main board............................................................................................................. 24
3.15.1 Main board (PCB) description............................................................ 25
3.16 Programming tips ................................................................................................. 26
3.17 Parameters MENU................................................................................................ 27
3.18 Service overlay...................................................................................................... 28
4 SERVICE SOFWARE.............................................................................................................. 29
4.1 Programming charts............................................................................................. 29
4.2 Free mode & Multi-cup mode............................................................................... 31
4.3 Electronic key option............................................................................................ 32
5 CLEANING AND SANITIZING................................................................................................ 32
5.1 Automatic rinsing function .................................................................................. 32
5.2 Cleaning and sanitizing instructions .................................................................. 33
5.3 Recommended cleaning tools ............................................................................. 33
5.4 Cleaning and Sanitizing Schedule....................................................................... 34
5.5 Overall cleaning ................................................................................................... 35
5.6 Exterior cleaning................................................................................................... 35
5.6.1 Cleaning the drip tray .......................................................................... 35
5.6.2 Emptying the waste bin ....................................................................... 36
5.7 Interior parts cleaning & sanitizing ..................................................................... 37
5.7.1 Coffee canisters ................................................................................... 37
5.7.2 Soluble canisters ................................................................................. 38
5.7.3 Whipper................................................................................................. 38
5.7.4 Coffee brewer ....................................................................................... 39
5.7.5 Fan......................................................................................................... 40
5.7.6 Stainless coffee chute ......................................................................... 41
5.7.7 Plastic chute of the 3 beans canister ................................................. 42
6 PREVENTIVE MAINTENANCE .............................................................................................. 43
6.1 Preventive maintenance schedule (PM) ............................................................. 43
6.2 Brewer assembly .................................................................................................. 44
6.3 Water outlet valves ............................................................................................... 45
6.4 Hot Water Tank ...................................................................................................... 46

AVALON GALLERIA Rev. 8 04/2013
www.cafection.com (800) 561-6162
4
INSTALLATION AND SERVICE MANUAL for AVALON Galleria and Quatro
Table of Contents
7 SERVICING PARTS ................................................................................................................47
7.1 Draining the hot water tank..................................................................................47
7.2 Shutdown / Storage ..............................................................................................48
7.2.1 Storing the brewer assembly ..............................................................48
Annex 1 Full maintenance schedule .....................................................................................49
Annex 2 Monthly maintenance schedule..............................................................................50
Annex 3 Weekly maintenance schedule ...............................................................................51
Annex4Wastechutepositionwithoutltrationsystem.....................................................52
Annex5Wastechutepositionwithltrationsystem ..........................................................53

AVALON GALLERIA Rev. 8 04/2013
INSTALLATION AND SERVICE MANUAL for AVALON Galleria and Quatro
5
www.cafection.com (800) 561-6162
Safety Instructions
1 SAFETY INSTRUCTIONS
Basic safety precautions should always be followed when using electrical appliances.
Read all instructions before using this brewing equipment.
1.1 Food-Contact Parts
We recommend that you clean and sanitize all food-contact parts prior to installation and use.
See the cleaning and sanitizing section for more details.
1.2 Warnings
·Tominimizetherisksofreorelectricshock,donotexposethisequipmenttorainor
moisture.
·Do not immerse this equipment in water; it could lead to electric shock or other malfunctions.
·Do not use this equipment other than for its intended use.
·This equipment contains hot water; never move when full.
·This brewing equipment is intended for indoor installation only.
1.3 Power supply
·Always use a grounded 120V AC 60Hz socket outlet rated for 15A service.
·Each brewing equipment must have its own electrical outlet, on a dedicated circuit.
·Extension cords must not be used.
·This equipment is equipped with a polarized alternating current line plug (one blade wider
than the other). Only use this plug with an outlet in which the prongs can be fully inserted.
Avoid exposure of the prongs on the polarized plug.
1.4 Disconnect the equipment if:
·Damage is done to the power cord;
·The equipment doesn’t work properly;
·The temperature of the power cord or plug increases dramatically during use;
·Unusual conditions occur.
FAILURE TO COMPLY CAN CAUSE EQUIPMENT DAMAGE, FIRE OR SEVERE
BODY INJURIES.

AVALON GALLERIA Rev. 8 04/2013
www.cafection.com (800) 561-6162
6
INSTALLATION AND SERVICE MANUAL for AVALON Galleria and Quatro
2 WARRANTY
2.1 Warranty policy
We hereby certify that the products manufactured by Cafection are, to the best of our knowledge, free from
all defects and faulty workmanship. The following warranties and conditions are applicable:
Allpartsincontactwithwater(outletvalves,heatingelement,probe,inletvalveandtankoat)are
warranted against material and workmanship defects for a period of 90 days from the date of shipment.
All remaining parts of the brewer are warranted against material and workmanship defects for one year
from date of shipment. All warranty service and returns must have prior authorization from Cafection.
Please contact Cafection customer service at 1-800-561-6162.
Conditions
Cafection assumes no responsibility for substitute replacement parts installed on the Avalon brewer that
have not been purchased from Cafection.
The following circumstances will void the warranty policy:
· Improper installation or operation of the equipment.
· Abuse or neglect, including but not limited to, failure to follow the preventive maintenance
schedule.
· Variation in equipment performance due to excessive mineral deposit or local water
conditions.
· Equipmentalteredinanywayand/ordates,codesorserialnumbersremovedormodied.
· Equipment damaged in shipping from the customer to Cafection due to improper
packaging.
Please note that labor is not covered by the warranty and that the repair protocol is limited to replacing
the defective part. Should any additional repairs need to be done, they will be charged to the customer.
EquipmentorpartswillnotbeacceptedwithoutapriornoticationtoCafection.
Please return your warranty card to Cafection via mail or fax to validate your warranty and to register your
unit for part upgrades.
Cafection Entreprises Inc.
2355, Dalton
Sainte-Foy, (Quebec) Canada. G1P 3S3
Tel.: 1-800-561-6162
Fax: 1-800-463-2739
Warranty

AVALON GALLERIA Rev. 8 04/2013
INSTALLATION AND SERVICE MANUAL for AVALON Galleria and Quatro
7
www.cafection.com (800) 561-6162
2.2 Warranty return procedure
In order to always offer you better, faster service, we request your cooperation for the return of
parts under warranty. We thank you in advance for taking the time to follow this procedure:
1. Please contact the Customer Service department to obtain an authorization number.
2. It is important to fax a copy of the original invoice to Cafection at 1-800-463-2739 for
approval.
3. Donotdestroyanypartsbeforereceivingawrittenconrmationthatthispartwillorwillnot
be credited or exchanged.
4. Keep a copy of the original invoice for your records.
5. A copy of the original invoice must be included with your parts returned.
PLEASE MAKE SURE THE MERCHANDISE IS WELL PACKED!
Please use original packaging!
6. Once the merchandise is received, Cafection will check the parts and apply a credit to your
account or exchange the merchandise if the warranty is applicable. Only guaranteed parts
are authorized for return.
7. We suggest you keep replacement parts on hand.
8. The warranty covers regular shipping only. Overnight shipping charges will be applied to
your order. Orders must be received before 12:00 pm Eastern Standard Time to be shipped
the same day*.
* Some conditions may apply.
2.3 Transport liabilities
YOU ARE RESPONSIBLE, SHIPMENT MUST BE INSPECTED!
You can refuse delivery if a shipment is damaged. Do not sign off the shipment without
proper inspection. Should you choose to accept the delivery, it is mandatory that
you record the following information on the delivery slip. Remember that you take
responsibility of the merchandise once you have signed the delivery receipt.
Youhave24hourstoreportandleaclaimforconcealeddamagestothe
transportation company.
*** Failure to comply to this procedure could lead to claim refusal by the carrier.
FOR MORE INFORMATION, PLEASE CALL CUSTOMER SERVICE AT 1-800-561-6162
Warranty

AVALON GALLERIA Rev. 8 04/2013
www.cafection.com (800) 561-6162
8
INSTALLATION AND SERVICE MANUAL for AVALON Galleria and Quatro
Initial Setup
3 INITIAL SETUP
Before you install the brewer on location, we strongly suggest that it be unpacked, inspected and bench
tested before it leaves your warehouse.
3.1 On-site installation requirements
3.1.1 Operating environment
For indoor use only.
3.1.2 Power supply
Make sure each unit has its own electrical circuit and is located within 6 feet of the dedicated electrical
outlet.
Use only a polarized grounded receptacle.
Domestic 115 VAC / 60 Hz - 15 A Circuit.
3.1.3 Water supply
Should be a plastic 1/4” or 3/8’’ O.D. dedicated line branched off a larger line. An easily accessible shut
off valve up stream of the unit is highly recommended for ease of installation. Water pressure should be at
least 20 PSI and no more than 80 PSI
3.1.4 Tools required
#2 Phillips screwdriver
Regular medium pliers
Adjustable wrench
Level indicator
Other tools may be required depending on the type of water supply
tubing and location.
3.1.5 Clearances
Machine Clearance Necessary for :
Height 44” 50” Opening the top of the machine.
Width 18 1/2” 26” Per side. Key access on one side and door swing on
the other.
Depth 26” 26 1/2” In front when the door is open.
Other
clearance
1.5”
6”
Clearance of water hookup, hoses and adequate air
circulation
Neededonlyifaltrationsystemisinstalledbehindthe
machine
See footprint and waste chute position in annex 4 and 5.

AVALON GALLERIA Rev. 8 04/2013
INSTALLATION AND SERVICE MANUAL for AVALON Galleria and Quatro
9
www.cafection.com (800) 561-6162
Initial Setup
3.2 Unpacking
For each brewing equipment kit you should have the following boxes: the brewer and the
accessories.
Quatro = 1 box for the brewer + 1 box for the accessories (optional)
Galleria = 1 box for the brewer + 1 box for the canister and accessories
To remove the unit from the box, carefully cut the straps holding the box in place on the skid
and then lift the box up. Inspect the unit to see if any damage has occurred in shipment.
NOTE: See transport liabilities in section 2.3 on page 7.
The parts and accessories that are shipped separately need to be installed on your equipment.
Ineachbox,youshouldndthefollowingitems:
1. Drip Tray Grill
2. Plastic Drip Tray
3. Plastic Drip Tray Support
4. OverowDripTray
5. Waste Basket
6. OverowDripTraySupport
7. 1/4’’ or 3/8’’ Inlet Kit Fitting Part
8. Optional Plastic Chute Kit
9. Front Panel
10. Filter Paper
11. Brush
12. Scissors
13. Brewer Motor Tool
* The 3 bean canister is individually packaged for the AVALON GALLERIA model
* The keys for the unit are attached to the power cord located in the back of the unit.

AVALON GALLERIA Rev. 8 04/2013
www.cafection.com (800) 561-6162
10
INSTALLATION AND SERVICE MANUAL for AVALON Galleria and Quatro
Initial Setup
3.3 Leveling the equipment
For optimal performance of the equipment, it is important to ensure that it is leveled. Avoiding to do so
can create variations in product delivery.
1. Place a level on the top of the equipment;
2. Adjust the 4 threaded level glides or legs of the equipment to reach a leveled position.
3.4 Hot water tank preparation
Make sure equipment is unplugged!
3.4.1 Tank lid preparation
1. You can acces the water tank by removing the water tank
access door or the back panel;
2. Locate the water tank and remove the twist-tie securing the
oatofthewatertank;
3. Remove the silicone tubing from the heating element;
4. Connect the white wire to the prong on the heating element;
5. Replace the access panel.
Heater
safety switch
Water safety switch
(oat)
Heating element
wire
Heater safety switch
Left side view
Water safety switch
(oat)
Right side view
Water tank access door
(under the plastic top)

AVALON GALLERIA Rev. 8 04/2013
INSTALLATION AND SERVICE MANUAL for AVALON Galleria and Quatro
11
www.cafection.com (800) 561-6162
Initial Setup
3.4.2 Adjustingthetankoverowoat
Itisimportanttoverifythattheoatispositionedproperlyintheoverowcupbecauseitcanmovearound
intransportation.Ifthisoatisnotproperlyinplacetheswitchwillnotbeactivatedandtheunitwill
automaticallyshutdownsensinganoverowsituation.
ItisimportanttoverifythattheOverowcupisinplacewiththehighestsideinfrontandsecuredwell
with the green tape. If you need to remove this cup, please make sure that you replace it with the highest
sectionfacingthefrontandtheoverowtubeinthecup.Fastenitinplacewithtape.Thiswillensurethat
theoatwill“oat”andwillactivatetheoverowswitchifaproblemaccurs.
Location in the brewer
Hole in the exit of the tube
Cup

AVALON GALLERIA Rev. 8 04/2013
www.cafection.com (800) 561-6162
12
INSTALLATION AND SERVICE MANUAL for AVALON Galleria and Quatro
3.5.1 Install the 3 beans canister
Unpack the 3 beans canister.
Open the cover of the grinder protector.
Install the canister on the shelf by aligning
the 3 transmissions of the canister with the
3motorsalreadyxedontheshelfandthe
2 pins on the other side of the shelf. Push
backwardtoxinplace.
3.5.2 Lock the cover of the grinder protector
Close the cover of the grinder protector
and lock using the latch.
Initial Setup
Grinder protector
cover
3.5 3 Beans canister installation (for the Galleria model)
Grinder protector
cover
Latch
Transmission
Motor
Pin of the shelf

AVALON GALLERIA Rev. 8 04/2013
INSTALLATION AND SERVICE MANUAL for AVALON Galleria and Quatro
13
www.cafection.com (800) 561-6162
Initial Setup
3.6 Water line connection
This equipment must be installed in compliance with applicable Federal,
State, Provincial and/or Municipal plumbing codes having jurisdiction.
Make sure that the equipment is unplugged before proceeding with the water supply
installation. Also verify that the incoming water pressure is greater than 20 psi and no more
than 80 psi.
1. Priortoinstallingtheequipment,ushoutthewaterlinebyrunningapproximately1gal.ofwaterintoa
pail. This will ensure no sediment from a new installation can get in the equipment;
2. The incoming water supply should have a shut-off valve connected in-line. Water supply should be a
plastic 1/4” or 3/8” O.D. dedicated line branched off a larger supply line;
3. Makesureyourwatersourceisturnedoff.Securetheinletttingrmlyontotheinletvalve.Donot
overtighten;
4. Makesuretheequipmentisunplugged.Connectthewaterlinetothequickconnectinlettting;
5. Turn the water valve on, sending water to the brewer. If there are any leaks, tighten connections to stop
leakage.
This procedure does not take into consideration the installation of a water
ltrationsystem.Pleaserefertothewaterltermanufacturerinstallation
instructions and incorporate them into the above procedures.
Waterinlettting

AVALON GALLERIA Rev. 8 04/2013
www.cafection.com (800) 561-6162
14
INSTALLATION AND SERVICE MANUAL for AVALON Galleria and Quatro
Initial Setup
3.7 Electrical connection
This equipment must be installed in compliance with applicable Federal, State, Provincial
and/or Local electrical codes having jurisdiction.
Make sure: - The equipment is OFF before plugging it in,
- The equipment has its own electrical outlet and
- NO extension cord is used.
1. Make sure that the power switch in the back of the unit is in the OFF position before plugging in the unit;
2. Locate the unit’s 6 feet power cord and plug it into its own grounded electrical outlet;
3. Reach to the back of the brewer and toggle the power switch to the ON position. The front lights will turn
onandwaterwillautomaticallyenterthebrewer.Thetankwillllforupto2-3minutesmaximum.
4. Once the tank is full, it will take 10-15 minutes to heat the water to brewing temperature;
5. Oncethebrewingequipmentisready,theLCDwillindicate“Hi!MakeYourChoice”.
The main power switch turns the equipment ON and OFF. This switch should be turned
OFF when servicing any (AC line voltage) electrical components on the equipment.
OFFposition!

AVALON GALLERIA Rev. 8 04/2013
INSTALLATION AND SERVICE MANUAL for AVALON Galleria and Quatro
15
www.cafection.com (800) 561-6162
3.8 Water temperature
This equipment has a coffee brewing setpoint of 200 °F water temperature to offer a consistent
beverage quality to the users. There is a +/- 2 °F tolerance.
This is an average and is not what you would get from a manual temperature measure. The
actualwatertemperatureuctuatesbecausecoldwaterisaddedtothetankafterevery
beverage delivery and time is needed to heat the new incoming water up to setpoint.
You can also take the water’s brewing temperature manually by ordering a cup of hot water
and measuring its temperature with a thermometer. There may be a slight difference from the
tank reading. This is normal.
If you are experiencing large temperature differences, verify that your tank is clean and not
obstructed by mineral deposits and scale.
Unit safety measures
In the event of a temperature probe failure, the tank may start to boil. This will cause it to
overowintothe“OverowCup”andwillautomaticallyshutitoff.
* Temperature can be set by user by accessing in the setup main menu.
Initial Setup
Electronic
Thermostat

AVALON GALLERIA Rev. 8 04/2013
www.cafection.com (800) 561-6162
16
INSTALLATION AND SERVICE MANUAL for AVALON Galleria and Quatro
Initial Setup
3.9 Driptrayandoverowinstallation
3.9.1 Overowdriptrayinstallation
1. Screwtheoverowdriptraysupport(05CAB11)
under the base of the brewer using the 2 screws
included.
2. Take out the 2 wires with connectors found
inside the brewer using the chute hole and connect
themtothe2connectorsoftheoverowdriptray
(05ASS30).
3. Puttheconnectedoverowdriptray(05ASS30)
on its support (05CAB11).
05ASS30
05CAB11
Installtheoverowdriptray
from inside the equipment.

AVALON GALLERIA Rev. 8 04/2013
INSTALLATION AND SERVICE MANUAL for AVALON Galleria and Quatro
17
www.cafection.com (800) 561-6162
3.9.2 Drip tray installation
1. Insert the drip tray support (05DOR02) in the
door.
2. Set the drip tray (05CAB17) on the support
(05DOR02) inside the restraint.
3. Install the metal grill (05CAB10) on the drip
tray (05CAB17).
Initial Setup
05CAB10
05CAB17
05DOR02
Restraint

AVALON GALLERIA Rev. 8 04/2013
www.cafection.com (800) 561-6162
18
INSTALLATION AND SERVICE MANUAL for AVALON Galleria and Quatro
Initial Setup
3.10 Loading products
1. Unlock the main door
2. Remove the plastic top cap
3. Removethecanisterlidofwhichyouwishtoll
4. Donotoverllthecanisters
By only removing 1 lid at a time,
you will reduce the risk of cross
contamination of products.
A - Ground Coffee (Regular)
B - Ground Coffee (Decaf)
C - Soluble (Hot Chocolate)
D - Soluble (French Vanilla)
For the 3 beans canister:
Unlock the cover of the canister and
open the plastic top cap.
Donotoverllthecanister.
Using a step stool will help you see the hoppers
thatyouarelling.
A - 3 Whole Bean Coffees
- coffee 1
- coffee 2
- coffee 3
C - Soluble (Hot Chocolate)
D - Soluble ( French Vanilla)
A
BC
D
A
C
D
Caution! Flavored beans could contain ethyl alcohol that could affect beans
canister’slongevity.Cafectiondonotrecommendusingavoredbeans.

AVALON GALLERIA Rev. 8 04/2013
INSTALLATION AND SERVICE MANUAL for AVALON Galleria and Quatro
19
www.cafection.com (800) 561-6162
Initial Setup
3.11 Chute system installation
1. Open the door of the equipment;
2. Insert the chute base inside the chute hole of the cabinet;
3. Insert the large waste chute into the chute base;
4. Install the front panel by aligning the metal bracket behind the front panel with the metal
bracketxedonthebrewerassembly.
Internal waste bin maximum coffee capacity: 100 cups
Metal bracket
of the front panel
Front panel
Waste chute
Chute base
Metal bracket
of the brewer
assembly

AVALON GALLERIA Rev. 8 04/2013
www.cafection.com (800) 561-6162
20
INSTALLATION AND SERVICE MANUAL for AVALON Galleria and Quatro
3.12 Brewer and whipping system
3
1 2
1. Untight the screw that holds
the hoses support.
2. Remove the hoses support, (it will be
retained by the tubes). Disconnect
the coffee whipper wire (in the
back of the whipper protector).
3. Untighten the whipper
support screw.
Initial Setup
This manual suits for next models
1
Table of contents
Other Cafection Coffee Maker manuals

Cafection
Cafection Encore VENTI User manual

Cafection
Cafection TOTAL LITE User manual

Cafection
Cafection Encore Ground User manual

Cafection
Cafection Encore lite User manual

Cafection
Cafection INNOVATION Total 1 User manual

Cafection
Cafection Innovation Series User manual

Cafection
Cafection Innovation Series User manual

Cafection
Cafection Total Lite Innovation Series User manual

Cafection
Cafection Innovation Series User manual

Cafection
Cafection Encore 29 User manual