In compliance with the current norms, the machine should be installed only by a technical person quali ied or this type
o work. During installation, ensure that:
- The machine is moved as given in chapter II.1.
- The required personal protection devices are worn so as to avoid injuries caused by electrical and mechanical
hazards (injuries by touching panels, sharp edges, etc.)
- Electrical connections are made a ter the power supply has been shut o , in compliance with the recommen-
dations given in chapter III.
- Grounding is carried out in compliance with current standards.
- The machine is powered on when installation has inished (ducting installed and inspection doors closed).
I / RECEIVING THE EQUIPMENT
Diablo are delivered on stringers or palettes then wrapped in plastic ilm..
I.1 / Receipt of the goods
When the equipment is received, the state o the packaging and the equipment must be checked. In the event o
damage, make an accurate note o any problems on the carrier's delivery note.
I.2 / Unpacking
When the equipment is unpacked, check the ollowing:
- The total number o packages are present.
- All accessories are present (dampers, roo , electric switchgear, etc.). A ter unpacking the equipment, the waste must
be disposed o in compliance with the current standards. No packaging should be discarded into the environment
I.3 / Storing
The equipment must be stored in shade, in a dry place, at a temperature between -20°C and 40°C.
II / INSTALLATION
II.1 / Handling
The units must only be moved in their installation position.
I the device is handled using a ork-li t truck, ensure this supports the load-bearing structure and does not touch
the panels enclosing the unit.
I the device is moved using a crane, use our cables o identical lengths. These must be at least as long as the
greatest distance between two astening points.
I L + W + H > 5m ⇒
⇒ ⇒
⇒ then the case must be li ted using a li ting beam.
II.2 / Space required
Generally speaking, it is desirable to provide access space o at least the width o the unit on the access side or
maintenance.
II.3 / Installation
The unit must be laid on a su iciently rigid and lat sur ace (use vibration mounts i necessary). For the DIABLO
connection, select duct sections based on dimensions o the lexible bands that should be properly stretched.
Install the unit such that bad weather or ambient temperature cannot damage the internal items o the unit during instal-
lation as well as when used later (possibly provide a protective cap).
.