manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Centro
  6. •
  7. Projection Screen
  8. •
  9. Centro Theatre Set 2 User manual

Centro Theatre Set 2 User manual

Popular Projection Screen manuals by other brands

Draper E Series Installation & operating instructions

Draper

Draper E Series Installation & operating instructions

Elite Screens Elite Tripod Series user guide

Elite Screens

Elite Screens Elite Tripod Series user guide

Laarhoven Companion II General assembly instructions

Laarhoven

Laarhoven Companion II General assembly instructions

Da-Lite ExecutiveElectrol Instruction book

Da-Lite

Da-Lite ExecutiveElectrol Instruction book

FONESTAR PPTR-43100-FA quick start guide

FONESTAR

FONESTAR PPTR-43100-FA quick start guide

Slide Clear Varro XL installation instructions

Slide Clear

Slide Clear Varro XL installation instructions

OS РХ-090Н user manual

OS

OS РХ-090Н user manual

Niko 10-845 Product information

Niko

Niko 10-845 Product information

Speaka Professional 2357532 Important information

Speaka Professional

Speaka Professional 2357532 Important information

Sima XL-72 instruction manual

Sima

Sima XL-72 instruction manual

Jasic EVO 2.0 ET-200P Fitting instructions

Jasic

Jasic EVO 2.0 ET-200P Fitting instructions

Renogy RMS-LFPS-US manual

Renogy

Renogy RMS-LFPS-US manual

Elite Screens Starling 2 Series user guide

Elite Screens

Elite Screens Starling 2 Series user guide

InFocus SC-WALL GRY-92H Instruction guide

InFocus

InFocus SC-WALL GRY-92H Instruction guide

Samsung S*H65* user manual

Samsung

Samsung S*H65* user manual

Celexon UST operating instructions

Celexon

Celexon UST operating instructions

JONSBO D31 user guide

JONSBO

JONSBO D31 user guide

Draper Luma instructions

Draper

Draper Luma instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

Centro Theatre Set 2
Assembly Instructions
1
Stand base assembly on the
ground. Loosen grub screws
and slide both connector bars
half way out of channel and
retighten. Repeat for other
base assembly.
2 3
Fully join posts and tighten
remaining grub screws to
make assembly secure.
Repeat for other base post.
Align acrylic cap notches
in upper 8-way post
assembly with protruding
connectors at stage 1.
4.1 4.2.1 4.2.2
4.2.3 The horizontal (H, H1 and H2) and vertical (V and V1) frame profiles
are joined in a similar manner to the posts
4.1) Loosen grub screws and slide connector bars halfway out of
the channel.
4.2) Join profiles ensuring graphic fixing strips are aligned and the
expanding clamps are at either end of the assembled profiles.
4.2i) Centre vertical ‘V1’ differs due to the presence of twin graphic fixing strips.
4.2ii) Bottom horizontal ‘H2’ differs with the introduction of the adjustable thumb screw foot in the centre.
4.3) Tighten grub screws to make secure.
4.2i 4.2ii 4.3
5.1 5.2 5.3
Connect two vertical (V) 1531mm assembly rails at 90º to
each end of the 1500mm horizontal rail (H2) ensuring that the
graphic fixing strip is outermost and the verticals are flush with
the end of the 1500mm rail. Bottom horizontal 1500mm rail (H2)
should have an adjustable thumbscrew foot in the middle of a
260mm connector bar. Connect middle vertical rail (V1- with
twin graphic fixing strips) to centre of the assembled horizontal
(H2) using the expanding clamp. Tighten 3 bottom grub screws
in expanding clamps on verticals to secure to horizontal.
6.1 6.2 6.3
Connect second horizontal 1500mm rail assembly (H),
using the expanding clamps, to top of assembled
verticals (V, V1 and V) ensuring that the graphic fixing
strip is at the bottom. Tighten grub screws on vertical
rails to secure. This completes the bottom section of
the framework.
7.1 7.2 7.3
For the top section of the framework, connect the two
220mm profiles, with expanding clamps at both ends
and the single fixing strip, at 90º flush to each end of
the third 1500mm horizontal rail (H). Ensure that the
graphic fixing strip on the verticals are outermost and
the graphic fixing strip on the horizontal 1500mm rail is
at the top. Affix 220mm vertical profile, with expanding
clamps at both ends and twin fixing strip, to middle of
1500mm horizontal. Tighten lower grub screws adjacent
to horizontal rail assembly to secure 220mm verticals.
8.1 8.2 8.3
Slot final top horizontal 1500mm rail assembly (H1)
to the 220mm verticals, ensuring that the graphic
fixing strip is at the top. Tighten grub screws on
verticals to secure framework. This completes the
top section of the framework.
9.1 9.2
Slot the bottom section framework into the channel of the
assembled post at 90º to the base plate. Ensure framework is
equidistant from the base plate, adjustable foot rests on the
ground, and graphic fixing strip is adjacent to the floor.
Tighten both grub screws in the horizontals (H2 and H) to secure.