
Upper Shelf
1. Locate the upper shelf (with the drawers and lid).
2. Align the 4 holes in any one of the
frame brackets with the 4 holes at any
corner of the upper shelf.
3. Insert an M8 x 12 bolt through
each of the holes of the
frame bracket and through
the upper shelf holes.
4. Place a lock nut on each
of the bolts and hand tighten.
Note: Install the handle at
either end of the trolley.
Place M8 x 16 bolts through
the 4 holes in the handle, frame
bracket and shelf and secure with lock nuts.
5. Repeat steps 1 -4 for remaining frame brackets.
Support Frame
1. Locate the 4 frame pieces (2 side frames, front
frame and rear frame).
2. Align the 2 holes in any one of the side frames
with the 2 holes in the centre of the frame brackets
on the side of the cart. The side frame should be
installed on the inside of the frame brackets.
3. Insert an M8 x 12 bolt through each of the holes of
the frame bracket and through the side frame holes.
4. Place a lock nut onto each of the bolts and
hand tighten
5. Repeat steps 1-4 for other side frame, front frame
and rear frame
Lower Shelf
1. Locate the lower shelf (lower shelf has caster holes).
2. Align the 4 holes in any one of the frame brackets with the 4 holes at any
corner of the lower shelf.
3. Insert an M8 x 12 bolt through each of the holes of the frame bracket and
through the lower shelf holes.
4. Place a lock nut onto each of the bolts and hand tighten.
5. Repeat step 1-4 for remaining frame brackets.
Fig.1
Note: With both shelves in place, use a spanner to fully tighten all nuts which
connect the Frame Brackets to the Shelves.
NOTE: Do not fully tighten nuts until the cart is fully assembled - see below: