GENERAL
The digital Multifunction Volt/Ammeter series EMM-VA allow
monitoring the main electrical parameters present on a
distribution line. The local display of the electrical parameters
is being made through 3 display with red LED, which grant a
good and simultaneous reading of various measures. The
intuitive selection of the measures to visualise, which are
signalled by their corresponding LED, completes a clear and
simple front panel, which offer a lot of useful information.
On top of the instantaneous measuring, these instruments
visualise the maximum peak of the main parameters
(maximum peak and maximum demand or maximum average
value).
Multifunction Volt/Ammeter series EMM-VA replace, in an
unique device, all the functions of voltmeters, ammeters and
frequency meters, permitting a great economic saving, due to
reducing of dimension and wiring, so as optimising the
instruments management, since one has most of all in one,
for electrical boards, switch-boards and Gen-Sets.
AVAILABLE MODELS
Several models, with various optional functions and outputs are available, either for flush mounting on front panel and for
DIN rail mounting.
INTRODUCTION
The EMM-3VA is only featured for visualising the electrical parameters. The power supply is taken from the measured
voltage or self-supplied.
ACCESSORIES and OPTIONS
Accessories: transparent cover for frontal protection type COP-96.
Options: power supply and measure voltages different than standard
measuring current inputs with internal CT’s
MESURED PARAMETERS
Parameters Measuring units Identification Symbols
Phase and three phase voltage [V-kV] V L1-N V L2-N V L3-N ΣV L-N
Phase to phase and three phase system voltages [V-kV] V L1-L2 V L2-L3 V L3-L1 ΣV L-L
Phase and three phase currents [A-kA] I L1 I L2 I L3 ΣI
Frequency [Hz] Hz L1
Instantaneous Values:
Maximum phase voltage [V-kV] V L1-N max V L2-N max V L3-N max
Minimum phase voltage [V-kV] V L1-N min V L2-N min V L3-N min
Maximum phase to phase voltage [V-kV] V L1-L2 max V L2-L3 max V L3-L1 max
Maximum phase current [A-kA] I L1 max I L2 max I L3 max
Measured value in 15’
Average phase current (maximum demand) [A-kA] I L1 max (avg) I L2 max (avg) I L3 max (avg)

EMM-R3 VA instruction manual IM425-U v2.0 pag. 2
INSTALLATION
WARNING FOR THE USER
Read carefully the instructions/indications contained in this manual before installing and using the instrument.
The instrument described in this manual is intended for use by properly trained staff only.
SAFETY
This instrument has been manufactured and tested in compliance with EN 61010-1 standards. In order to maintain these conditions and
to ensure safe operation, the person must comply with the indications and markings contained in the manual. When the instrument is
received, before beginning installation, check that it's OK And it has not suffered any damage during transport. When starting
installations make sure that the operating voltage and mains voltages are compatible with the device instructions. The instrument power
supply must not be earthen. Only qualified and authorised personnel must carry out maintenance and/or repair. If there is ever the
suspicious that, that there is a lack of safety, during operation, the instrument must be disconnected and cautions taken against
accidental use.
Operation is no longer safe when: The instrument doesn't work. - There is clearly visible damage. - After serious damage
incurred during transport. - After a storage under unfavourable conditions.
WIRING
For a correct use of the device, the wiring diagram contained in the present manual must be respected.
The connections are available on the screw terminal:
- Auxiliary power supply:
The power supply is take from voltage inputs.
There are 3 different auxiliary supplies:
Vn 110V = 100-125V 50-60Hz
Vn 230V = 220-240V 50-60Hz
Vn 400V = 380-415V 50-60Hz
In the standard version the voltage is 400V and it’s taken between the phases L2-L3.
In the following table it’s possible to see the measurable voltage depending of the type of power supply.
Power supply terminals Rated voltage Range of measurable voltage
400V 300÷500V phase to phase (175÷290V phase-neutral)
230V 175÷290V phase to phase (130÷170V phase-neutral)
L2-L3 (phase to phase power supply)
110V 85÷145V phase to phase (50÷85V phase-neutral)
230V 300÷500V phase to phase (175÷290V phase-neutral)
L3-N (phase – neutral power supply) 110V 175÷290V phase to phase (100÷170V phase-neutral)
The standard version allows applying the instrument at all the three-phase network 400V with or without neutral supplied.
For example for application on single phase 230V it will need the L3-N / 230V. While for applications in medium voltage
(for example using external voltage transformer 15 / 0.1 kV phase to phase) it will need the version L2-L3 / 110V.
- measuring voltage inputs:
4 terminals are available for the connection to the 3 phase and
neutral of the measuring network, the maximum voltage phase to
phase shouldn't be over 500 V rms and it will always be depending
on the auxiliary power supply.
In case of a 3 phase system without neutral, or non-distributed
neutral, to leave terminal N free.
It’s possible to use external voltage transformer. In fact the
transformation rate of the external transducer can be set in the
SETUP of the instrument and the visualisation allows the reading of
voltage up to 40,0 kV.
- measuring current inputs:
4 terminals are available for the connection to 3 external CT’s with
secondary 5A, it’s possible to use 2 CT’s on 3 wires system (three
phases Aaron wiring). The use of external CT’s is always necessary.
The transformation rate of the external transducer can be set in the
SETUP of the instrument and the visualisation allows the reading of
voltage up to 9,99 kA.
NOTE: It's a must to respect the phase sequence. The connections between current and voltage phase inputs must not be inverted (for
example, CT placed on phase L1 must correspond to the I1 input). So as it is not correct to invert S1 and S2 terminals.
To fix the device at the panel, insert the two brackets into their corresponding grove holes, at the side of the enclosure and fix up the
screws. It’s better to put an external protection with fuses for the voltage inputs and to use adapted cables for the working currents and
voltages: section from 0.5 to 2.5 mm2.
ENER GY C OUN TE RS
PANNELLO POSTERIORE (lato connessioni)
morsettiera a vite

EMM-R3 VA instruction manual IM425-U v2.0 pag. 3
WIRING DIAGRAM
P1
P1
P1
P2
S1
S1
S1
S2
N
L1
L2
L3
I2
C.I.
I1
I3
S1
S2
V
L1
V
L2
V
L3
N
measure current inputs
measure voltage inputs
on lines with 3 wires (without neutral or with neutral
not supplied) the N terminal must not be connected
THREE PHASE LINE
WITH 3 OR 4 WIRES
P1
S1
S1
S2
L1
L2
L3
THREE PHASE LINE
WITH 3 WIRES AND 2 CT’s
( AARON wiring)
*the voltage wiring with 2 VT is
possible only for the version with
internal CT’s
P1 P2
S2
P2
P1
P1
P1
P2
S1
S1
S1
S2
N
L1
L2
L3
THREE PHASE LINE
WITH 4 WIRES AND 3 VT
P1 P2
S1 S2
N
L
SINGLE PHASE LINE
If the instruments are used on single phase line, the
measures are referred to the L3 phase.
Don’t consider the other data displayed regarding to
the three phase value system.
LOAD
I2
C.I.
I1
I3
S1
S2
V
L1
V
L2
V
L3
N
measure current inputs
measure voltage inputs
EMM-R3VA
I2
C.I.
I1
I3
S1
S2
V
L1
V
L2
V
L3
N
measure current inputs
measure voltage inputs
I2
C.I.
I1
I3
S1
S2
V
L1
V
L2
V
L3
N
measure current inputs
measure voltage inputs
*
EMM-R3VA
LOAD
EMM-R3VA
LOAD
EMM-R3VA
LOAD

EMM-R3 VA instruction manual IM425-U v2.0 pag. 4
FRONT PANEL DESCRIPTION
DESCRIPTION:
A: Push-button for visualising of the three phase system parameters with the corresponding indication LED.
By pressing during 5 seconds, user accedes to programming the instrument (SETUP).
B: Push-button for selecting the measures to visualise on display E.
C: LED’s for indicating the measures visualised on display Eand the eventual multiplier factor of each parameter
(reading k =kilo x1000).
D: LED for indicating the visualisation of the memorised peak values.
E: Three displays for visualising the measures, subdivided by phases. Should the LED ΣLbe glowing,it indicates
the three-phase system value of the selected parameter.
A+B: By pressing the two keys simultaneously at the visualisation mode, it accedes to the visualisation of the
memorised peak values.

EMM-R3 VA instruction manual IM425-U v2.0 pag. 5
MENU OF INSTRUMENT PROGRAMMING (SETUP)
For a correct use of the instruments it’s necessary to program the transformation rate of the CT’s and the transformation
rate of the eventually voltage transformers. The values set are hold also in absence of the auxiliary power supply.
- Programming of the transformation rate of the external CT’s
The programming of the CT’s rate considered as the rate between
primary and secondary (example: with CT 1000/5, we must set 200),
must be done with the push-button on the front panel.
After the connecting the power supply to the instrument and waiting few
seconds (all LED’s will glow and the first indication of the firmware
appears on the display and all segments will glow later), press and keep
pressing the key Aduring 5 seconds, when the message set up will
appear on the display E. By pressing the key Aagain it will appear the
message CT (current transformer) and the value of the transformation
rate (set to 1 by the manufacturer).
To increase the value press the Bbutton or Abutton reduce the value
(the variation is unit for unit).
To increase the speed up the value setting, it’s necessary to hold pressed
the Bor Abutton, the variation will happen successively by tens and
hundreds.
To come back to increase or to reduce the value on unit by unit way, it’s
necessary to release and to press the key again.
To confirm the value set press the Abutton; in this way the instrument will pass to the successive programming.
If no key is pressed during a 10-second interval of time, the instrument will exit automatically from programming, without
saving the selected value.
- Programming of the transformation rate of the external voltage transformers
After the precedent programming, the message VT (voltage transformer) will appear on display Etogether with the value
of the transformation rate of the external VT (set to 1 by the manufacturer), considered as the rate between primary and
secondary (example with VT 15/o.1 kV the value will be 150).
In the same way as programming the CT’s rate, it will be possible to set this value. If external VT are not used the value
to set will be 1.
To confirm the value press the Abutton. The instrument will exit from programming and it will enter in the visualisation
modality.
-Activating or cancelling the automatic scrolling
This allows selecting ON for activating or OFF for cancelling the automatic scrolling of the measures visualisation.
MEASURES VISUALISATION
The measures reading is visualised on the display E, showing the three phase measures (L1, L2 y L3 respectively) of the
indicated parameter by the CLED. For measuring the phase to phase voltage (V L-L), the three measures are understood
V L1-L2, V L2-L3, V L3-L1 respectively, as indicated on the front plate.
The selection of the parameter to be visualised is made by pressing the key B. It will be indicated by the C LED.
By pressing the key A, the selected parameters will be visualised on display E, as three phase values (average of the
individual phases for voltages and currents) with the corresponding lighting of the LED, placed internally in the key. In
This case, by pressing the key Bit will be possible to show: either the three-phase voltage, calculated as the average of
the phase voltage, or the phase to phase voltages (it will be indicated by the corresponding LED C). In the mode of
visualisation of the three-phase system (LED ΣL glowing), we will have following lights and readings:
- LED VL-N or (VL-L) and the display L1 will show the average phase voltage (or average phase to phase)
- LED Aand the display L2 will show the average current
- LED Hz and the display L3 will show the frequency on line L1
By pressing the Akey again, it will return to visualise the phase values.
Please note that the unit value may be expressed in kilo, when the corresponding LED C are glowing (indicated in the
front plate as k).
The visualised frequency is referred to the line L1.
B
C
C
E
A
L1
L2
L3
Σ
L
V
L-N
V
L-L
A
electrical multi meter
L1-2
L2-3
L3-1
MAX
Hz
k
max
avg
k
D

EMM-R3 VA instruction manual IM425-U v2.0 pag. 6
VISUALISING THE INSTANTANEOUS AND AVERAGE PEAK (MAXIMUM) VALUES
By pressing the Aand Bkeys simultaneously, the instrument enters
into the visualisation of the peak (maximum) values: The LED Dwill
glow. The memorised peak (maximum) values, which might be
selected by the Bkey, will be shown on the display E.
The indication of the value and the value itself will be visualised
alternatively on the display E.
If no key is pressed during an interval of time of 10 seconds, the
instrument will return automatically to the visualisation of measures.
There are two types of the maximum memorised values:
The instantaneous maximum memorised value is the maximum
reached value of the parameter, during 1-second al least.
The average maximum values (maximum demand) memorise the
maximum average value of the parameter, reached during the last
15 minutes.
The integration for calculating the average values is synchronised
every time that the instrument is switched on.
During the visualisation of the maximum memorised values, the
values are visualised by alternating the indication of the visualised
parameter with the measured values.
The maximum values of the parameters, which are selectable with the Bkey, are as follows:
Parameter Display Signalling LED
VL-N maximum instantaneous IST HI VL-N
VL-N minimum instantaneous IST LO VL-N
VL-L maximum instantaneous IST HI VL-L
I phase maximum instantaneous IST LO A
I phase average maximum 15’ HI A
Cancellation of the peak values
Enter in programming mode (SETUP), press the key Buntil the message reset appears on the display E, then press
the key Aand the message RES ALL no will appear on display E. By pressing the key Bthe message will change to
RES ALL yes. If confirmation is made with the key A, all memorised data will be cancelled. The exit of the
cancellation menu is made automatically.
NOTE regarding the measures
The refresh time of display is lower than 1 second and it corresponds to the processing time of measure according to the used
measuring methodology, allowing a comfortable reading of values, also in presence of unexpected deviation of the measured
parameters.
Should the case be that the instrument is being used in a single-phase line, please bear on mind that the valid values are referred to
phase L3. Other visualised values shouldn’t be considered, since they correspond to three-phase system.
In case that the indicated measures aren’t reliable or they are absurd, it’s important to check carefully the current and voltage inputs
connection, so as the phase sequence. Check that current and voltage correspond to the same phase (on input L1 it will be connected
phase voltage L1 and the CT will be placed on phase L1), thence terminal S1 of CT will be wired to the relative terminal S1 on the
instrument.
If the secondary of the CT is connected to other instruments also, it can be experienced some measuring problems, according with the
typology of current inputs. Should that be the case, the user should select the option of the instruments type (T) with internal CT’s.
B
C
C
E
A
L1
L2
L3
Σ
L
V
L-N
V
L-L
A
elec trical multi meter
L1-2
L2-3
L3-1
MAX
Hz
k
max
avg
k
D

EMM-R3 VA instruction manual IM425-U v2.0 pag. 7
TECHNICAL CHARACTERISTICS
MEASURES, ACCURACY
Voltage True rms for the phase, phase to phase and three-phase voltage
Total measuring range: 20÷500V trms phase-phase - 290V rms phase-neutral, depending always to the
power supply voltage.
Visualization (0,02÷50,0kV) – measuring accuracy: ±0,5% ±1 digit
Current True rms for the phase and three-phase currents.
Measuring range: 0,02÷5A trms - accuracy: ±0,5% ±1 digit
Visualization 0,02÷9990A
Frequency Frequency of the phase L1 – measuring range: 30÷500Hz
accuracy: ±0,5% ±1 digit
AUXILIARY POWER SUPPLY -INPUTS
Aux. power supply Standard 380-415V ±15% - options 100-125 / 220-240V ±15%
Frequency 50-60Hz - absorption 3VA
Voltage taken from the measuring voltage inputs
Voltage inputs from 20 to 500V phase-phase (always depending on the auxiliary supply); permanent overload +20% -
impedance at the input: 1 MΩ
Three-phase wiring with 3 or 4 wires, and single-phase wiring
MV connection through external VT with programmable transformation ratio from 1 to 400
Current inputs From 0,02 to 5A; permanent overload 30% - from external CT’s with secondary 5A
primary programmable from 5 to 10000A – self consumption <0,5VA
GENERAL
Display and keyboard 3 display with red LED of 10 mm each, made of 3 digits of 7 segments
2 keys for selection of measures and programming
Mechanical Protection degree: IP52 frontal - IP20 enclosure and terminals - weight: approx. 0,5 kg.
Wiring through terminals for screws, cross section cable of 2,5 mm2
Self-extinguishing plastic enclosure –Flush mounting DIN 96x96mm, depth 56mm
Environment Working temperature: -10÷60°C; relative humidity <90%
Storage temperature: -25÷70°C
Isolation test: 3 kV during 1 minute
Standards of reference
and Marking
CEI EN 50081-2; CEI EN 61000-6-2;
CEI EN 61010-1
DIMENSIONES
92
92
R3
96
96
90
96
56
9
20
kM
k
L1
L2
L3
mult i met er
Σ
L
V
L- N
A
cos
ϕ
W
VAr
VA
V
L-L
V
L-N
°CHz
V
L-L
PEAk
foratura pannello
kM
kV
L-L
V
L-N
°C
L1
L2
L3
Σ
L
Hz
electrical
multi met er
V
A
P.F.
W
VAr
VA
V
L-N
L-L
pea
k
L1
L2
L3
Σ
L
V
L-N
V
L-L
A
electrica l multi m eter
L1-2
L2-3
L3-1
MAX
Hz
k
max
avg
k
For other applications, please contact with CONTREL technical assistance department.
NOTE
Due to the continuous evolution of standards and products, the company reserves itself the rights of modifying the characteristics of the present product,
at any time.
The manufacturer’s liability due to damages caused by defects of the product...” might be reduced or superseded (...) when the damage has been
caused jointly, by a product’s defect or/and by cause of the injured party or a person under the injured party’s responsibility” (Article 8, 85/374/CEE).

EMM-R3 VA instruction manual IM425-U v2.0 pag. 8
Table of contents
Other Contrel Multimeter manuals