manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Crosswater
  6. •
  7. Bathtub
  8. •
  9. Crosswater Patinato Petite User manual

Crosswater Patinato Petite User manual

Installation Instructions
59-7/8"
31-1/2"
3-1/8"
15-3/4"
Weight - 187lbs
Weight with water - 555lbs
2"dia
27-1/4"
25-1/2"
21-5/8"
47-3/8"
2-1/4"
Tape
measure
Safety
glasses
Set
square
Pencil Spirit
level
Silicone
sealant
2/3 Height = 44 Gal./167L
Tools required
Patinato Petite Bathtub
US-N3ACS
Installation notes
The installation must comply with all plumbing codes including local
codes and be installed by a licensed plumbing contractor.
Store the bathtub in a safe place until you begin installation to avoid
any damage.
Assemble the bathtub on a mat to protect against damage to the
bathtub surface.
Avoid getting cement, grit, sand or masonry products on to the surface.
Protect and cover the bathtub during the installation period to
prevent damage from occurring.
Never use brown tape or gaffer tape directly on to the surface. If the
bath has to be repacked remember to avoid taping directly on to the
surface of the bathtub.
IMPORTANT: Turn off the main water supply before connecting to
any existing pipe work or doing any maintenance.
WARNING! Please check for any hidden pipes and cables, electric
or otherwise,before drilling holes in a wall or floor.
Dimensions
Introduction
This bathtub has been fully inspected throughout the production
process and only leaves our factory after a 15-step QC process.
Don't remove the old fixture before you unpack and inspect the new
bathtub.
Carefully remove the bathtub from the box, taking care the bathtub is
carried in the bag.
Before beginning installation of the bathtub please check for any
damage that may have occurred during transport. Note: Damage
claims cannot be made during or after installation.
Improper installation shall result in loss of warranty in case of damage
caused by impacts or rubbing against rough surfaces.
Prior to installing the bath tub prepare a connection of water inlet/outlet.
Pay attention to leveling of floor where the bathtub will be located,
ensuring it can take the weight of the bathtub, water and bather(s).
The customer may choose the type and location of the faucets,
installation instructions should be supplied by the faucet manufacturer.
The installation procedure of the bathtub may differ from that
described in the installation instructions, depending on where you
wish the bathtub to be located.
Wet surface of the bath ub may create a risk of slipping which may
increase by using soap, shampoo, oils and similar products.
IMPORTANT: Please read these instructions carefully before you
begin and retain for future reference.
We do not accept responsibility for any problems that may occur
through incorrect installation.
RECOMMENDATIONS:
- Walls and floor should be fully tiled and finished before installation.
This ensures that the product is installed flat to the tile face and allows
the product to be easily removed if required in the future.
- Remove the protective packaging after installation of the bathtub.
- Only fill the bathtub with water up to 2/3 of its height.
- Use US-BTW0231 and ITD5135 waste flow products with this
bathtub.
IMPORTANT:
This bathtub is VERY heavy and installation requires 3 people.
Crosswater London cannot accept responsibility for any injuries
caused to those attempting to install this bathtub without
adequate and appropriate tools or resources.
Installation - carriage
lDo not drop the bathtub!
l Remove the bathtub from the packaging area using the bag
with handles.
l Use the bag with handles to lift and move the bathtub.
l Do not drag the bathtub over rough surfaces or sharp
objects. Lift and place the bathtub into position.
Installation - preparation
lConstruct a plumb stud pocket or wall if required. lInstall the rough plumbing.
Remove the red protective
tape to expose the adhesive
123
PVC Strip PVC Strip
Wall facing edge
of bath tub
Wall facing edge
of bath tub
lUnder floor access is required for plumbing of bathtub waste
•It is recommended that ITD5135 be used for ease of
installation.
Installation
Installation - preparation
lWaste connection is dependant on the site situation.
Final decision about installation of waste connection should be
taken by a suitably qualied installer.
lAdd the sealing flange to the edge of the bathtub which will sit
against the wall.
lOnce the sealing flange is attached to the bathtub, cut off the ends
to the appropriate length.
lPrepare to add the sealing ange by separating the surfaces of the
strip in three steps.
Installation
lPlace the bathtub on two wooden blocks over the waste connections.
Connect both wastes, fill the bath tub with water and check for leaks.
lFit the bathtub and overflow waste as per the manufacturers
instructions.
WARNING: Do NOT overtighten the waste as this may cause long
term damage to the bath.
We recommend to use a torque wrench to tighten the waste by
using a torque force between 25Nm or 18.5 ft/lb and 50Nm or
36.8 ft/lb.
Issue date: 220616
Warranty - This Crosswater London product is covered by a limited lifetime warranty. For full details, terms and conditions please visit our website..
For further information contact:Crosswater London, 393 Fortune Blvd., Milford, MA 01757
Toll free number: 844-XWATER-1 (844-992-8371) tel: 508-381-6062 fax: 508-381-6068
www.crosswaterlondon.com
email: technical@crosswaterlondon.com
Once installed and sealed, DO NOT
use or get wet for 24 hours.
PVC Strip
Wall facing edge
of bath tub
Wall/stud
PVC Strip
Wall facing edge
of bath tub
Bead of silicone sealant
Tile/wall liner
Wall/stud
Installation
lA water barrier has now been created between the PVC strip
and the bathtub.
lWall tiles can now be fixed onto the wall and down to the bathtub.
 Cleaning Instructions
Installation
lFinally, seal the bathtub around the floor with a bead of silicone.
Clean the bath regularly with non-abrasive soap and warm water. Fully rinse after cleaning.
While Clearstone is highly stain resistant, it is recommended that bath water containing additives such as oils or salts is always drained and
rinsed immediately after use.
Please note that hair dyes and color cosmetics (eg. mascara, lipstick, face powder) may leave a slight discoloration if not removed immediately.
If any strong chemicals come into contact with the bathtub, remove and rinse immediately.
Water temperature should not exceed 49˚C/120˚F.
For a fine scratch or a slight mark, use a 1500 grade sandpaper. Gently sand the area with water. For best results, limit sanding to the smallest
possible area around the scratch. Re-polish the surface afterwards using a neutral polishing compound or toothpaste. It may be possible to
polish very fine scratches away without using abrasive papers: scrub gently with a soft brush or plastic pad (not metal scouring pad) and a
mildly abrasive cream cleaner. Afterwards scrub the whole area with plenty of clean water and re-polish as before.
If the scratch or mark is too deep and cannot be repaired using the above method, it is possible to purchase a repair kit US-CRK. In order to
remove the scratches, follow the instructions included with the kit.

Other Crosswater Bathtub manuals

Crosswater Palermo Grande US-N5CCS User manual

Crosswater

Crosswater Palermo Grande US-N5CCS User manual

Crosswater Romano Petite US-N11ACS User manual

Crosswater

Crosswater Romano Petite US-N11ACS User manual

Crosswater US-WF FSBATH User manual

Crosswater

Crosswater US-WF FSBATH User manual

Crosswater Duo US-N26CS User manual

Crosswater

Crosswater Duo US-N26CS User manual

Crosswater Vicenza US-N6DCS User manual

Crosswater

Crosswater Vicenza US-N6DCS User manual

Crosswater MPRO User manual

Crosswater

Crosswater MPRO User manual

Crosswater Balthazar US-N25 User manual

Crosswater

Crosswater Balthazar US-N25 User manual

Crosswater Palermo Petite US-N4CCS User manual

Crosswater

Crosswater Palermo Petite US-N4CCS User manual

Crosswater Formoso Grande US-N2ACS User manual

Crosswater

Crosswater Formoso Grande US-N2ACS User manual

Crosswater Romano US-N11BCS User manual

Crosswater

Crosswater Romano US-N11BCS User manual

Crosswater Teardrop Grande US-M11FCS User manual

Crosswater

Crosswater Teardrop Grande US-M11FCS User manual

Crosswater US-N8ECS User manual

Crosswater

Crosswater US-N8ECS User manual

Crosswater Vicenza Grande US-N7DCS User manual

Crosswater

Crosswater Vicenza Grande US-N7DCS User manual

Crosswater Sontuoso US-N8ECS User manual

Crosswater

Crosswater Sontuoso US-N8ECS User manual

Crosswater Patinato 66 User manual

Crosswater

Crosswater Patinato 66 User manual

Crosswater US-M11FCS User manual

Crosswater

Crosswater US-M11FCS User manual

Crosswater Florenza US-N23CS User manual

Crosswater

Crosswater Florenza US-N23CS User manual

Crosswater US-N9CS User manual

Crosswater

Crosswater US-N9CS User manual

Crosswater Nuvola US-N22CS User manual

Crosswater

Crosswater Nuvola US-N22CS User manual

Crosswater Puro US-N15CS User manual

Crosswater

Crosswater Puro US-N15CS User manual

Crosswater Formoso Petite US-N1ACS User manual

Crosswater

Crosswater Formoso Petite US-N1ACS User manual

Crosswater Batello Grande US-N10CS User manual

Crosswater

Crosswater Batello Grande US-N10CS User manual

Crosswater MPRO66 User manual

Crosswater

Crosswater MPRO66 User manual

Popular Bathtub manuals by other brands

BETTE BETTEONE HIGHLINE Installation

BETTE

BETTE BETTEONE HIGHLINE Installation

TERMEX VT-TMP operating manual

TERMEX

TERMEX VT-TMP operating manual

glass 1989 nubea 170/75 manual

glass 1989

glass 1989 nubea 170/75 manual

Jacuzzi MILANO H546000 manual

Jacuzzi

Jacuzzi MILANO H546000 manual

glass 1989 nubea 190/90 manual

glass 1989

glass 1989 nubea 190/90 manual

Jacuzzi Projecta lagoon 2 Installation - use - maintenance

Jacuzzi

Jacuzzi Projecta lagoon 2 Installation - use - maintenance

Swiss Madison Ivy SM-AB546 installation instructions

Swiss Madison

Swiss Madison Ivy SM-AB546 installation instructions

American Standard Scala Corner Whirlpool and Bathing Pool... Specification sheet

American Standard

American Standard Scala Corner Whirlpool and Bathing Pool... Specification sheet

Safety Bath SO-LO Installation & user guide

Safety Bath

Safety Bath SO-LO Installation & user guide

Jacuzzi infinito Installation - use - maintenance

Jacuzzi

Jacuzzi infinito Installation - use - maintenance

Clou Solium I CL/05.70010 installation instructions

Clou

Clou Solium I CL/05.70010 installation instructions

glass 1989 CONCRETE SOFT installation guide

glass 1989

glass 1989 CONCRETE SOFT installation guide

Porcelanosa KRION ARCH installation guide

Porcelanosa

Porcelanosa KRION ARCH installation guide

Wedi Sanbath Cube Assembly instructions

Wedi

Wedi Sanbath Cube Assembly instructions

Ideal-Standard TEMPO IDEALFORM PLUS+ installation instructions

Ideal-Standard

Ideal-Standard TEMPO IDEALFORM PLUS+ installation instructions

DURAVIT 2nd floor 7X0079 Mounting instructions

DURAVIT

DURAVIT 2nd floor 7X0079 Mounting instructions

Bestbath BigE XTWJ6035 Installation and operating instructions

Bestbath

Bestbath BigE XTWJ6035 Installation and operating instructions

American Standard Green Tea Whirlpool and Bathing Pool... Specifications

American Standard

American Standard Green Tea Whirlpool and Bathing Pool... Specifications

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.