
4CTC EcoLogic PRO/Family
General Information
No liability is accepted for any misprints. We reserve the right to make design changes.
Quick reference
Fill in the information below. It may come in useful if anything should happen.
Product: Manufacturing number:
Installer: Name:
Date: Tel. no.:
Electrical installer: Name:
Date: Tel. no.:
* Applies to the CTC EcoLogic PRO only
Table of Contents
GENERAL INFORMATION 4
Important to remember! _____________________________________________ 6
Safety Instructions _____________________________________________________ 6
1. Design and function of the CTC EcoLogic_________ 7
1.1 Main components – printed circuit board (PCB) ____ 7
1.2 Heating System_______________________________________________ 9
1.3 DHW ___________________________________________________________ 12
1.4 Additional heat ______________________________________________ 13
1.5 Solar panels*_________________________________________________ 14
1.6 Recharging bedrock/ground*___________________________ 15
1.7 Cooling* _______________________________________________________ 16
1.8 Pool* ___________________________________________________________ 16
2. Your home’s heating installation_______________________ 17
3. Technical data____________________________________________________ 20
4. Detail Description Menus__________________________________ 21
4.1 Start menu ___________________________________________________ 21
4.2 Room temp. _________________________________________________ 22
4.3 DHW ___________________________________________________________ 24
4.4 Operation _____________________________________________________ 25
4.5 Installer ________________________________________________________ 33
5. Menu overview___________________________________________________ 54
5.1 Room temp. _________________________________________________ 55
5.2 DHW ___________________________________________________________ 56
5.3 Operation _____________________________________________________ 57
5.4 Installer (Time/Language – Settings)__________________ 58
5.5 Installer (Define system/Service) _______________________ 60
6. Operation and Maintenance______________________________ 62
7. Fault Tracing/Appropriate Measures ________________ 63
7.1 Information messages ____________________________________ 65
7.2 Alarm messages____________________________________________ 66
FOR THE INSTALLATION ENGINEER 68
8. Pipe installation _________________________________________________ 68
8.1 CTC EcoLogic system 1* ________________________________ 68
8.2 CTC EcoLogic Systems 2 and 3* _____________________ 73
8.3 EcoLogic systems 4 and 5*_____________________________ 80
8.4 CTC EcoLogic system 6* ________________________________ 88
9. Electrical installation _________________________________________ 95
9.1 High-voltage _________________________________________________ 95
9.2 Protection - low voltage (sensor) _____________________101
10. Resistance for sensors____________________________________ 105
11. Electrical diagram____________________________________________ 106
12. Parts list ___________________________________________________________ 108
13. First start__________________________________________________________ 109
Declaration of conformity ______________________________________ 110