OPERATION
1) PRIMING :
When the pump is started for the first time it is to be primed (i.e.
the pump is to be filled with water). This can be accomplished
using the T fitting as shown in figure. The air-cock is opened.
Water is poured until there is a free flow from the air - cock. Then
the air-cock is closed gradually while water is being poured. If
after closing the air-cock water level in the fitting falls, this
indicates there is a leak and mechanic should be consulted.
2) CAUTION :
Pumped water must not contain sand or grit. In a new borewell
there will be sand, mud, grit, etc. as a result of the drilling of the
borewell. While starting for the first time, the pump is not to be
stopped until clear water flows ie. It must not be switched off while
pumping sandy water.
1) The Jet monobloc should be installed in a clean, dry location
with proper ventilation. Do not install in open air without sufficient
covering.
2) The Monobloc can be installed either over a well or away from
it. The Pipe leading from the Monobloc to the well must slope
down from the Monobloc to the well.
3) Only new pipes and fittings are to be used. Old pipes contain
lose scale and dirt. This will block the nozzle and put the pump
out of order.
4) The Jet unit should be located around 3 metres (10 ft) below the
lowest water level in the well.
5) Equipment required (refer the list of materials)
6) The foot valve is to be checked by filling it with water and
allowing the water to stand for 30 minutes; if the foot valve is
faulty the water level will decrease due to leakage. The dealer is
to be contacted immediately for replacement or rectification.
7) If the use of old pipes is unavoidable, the dirt and scale in them
is to be removed by keeping them vertically and hitting them with
a hammer.
8) At every joint threading compound is to be applied to ensure a
leak-proof joint.
Note : The Jet Pump will not function even if there is a slight leak
in the suction pipe.
9) Before the installation of the last two lengths the horizontal pipe
which are to be connected to the Monobloc flanges one should
ensure that their ends are level. This will result in a better fit.
10) The horizontal pressure pipe is to be connected between the
elbow and flange using a slope as shown in figure 1
11) A gasket is to be provided between flange and pump and the
flange nuts are to be tightened well to prevent leakage.
12) For ease in priming the pump at fitting is to be connected on the
delivery side as shown in figure. The T fitting should be located
between the pump and gate valve.
INSTALLATION