SOLIVIA GW Quick Start Instructions
for SOLIVIA NA, EU or AP Inverters
Scope
Install the SOLIVIA GW Gateway between a SOLIVIA inverter and an internet connected network port.
Planning
• If more than one inverter will be connected in a chain, ensure that each inverter has a unique ID assigned in the inverter user interface. Please
check the SOLIVIA inverter user manual for instructions on how to select the inverter ID.
• Mount the gateway to an indoor wall. Allow 20 cm or 8 inches vertical clearance, 10 cm or 4 inches horizontal clearance and 2.5 cm or 1 inch height.
• The gateway must have an AC power outlet within 2 meters or 6 feet of the gateway. Please note that maximum Ethernet cable lengths are detailed
in the inverter installation diagram.
• The SOLIVIA GW box contains two MAC address labels. One label should be placed on the SOLIVIA GW gateway side or top for easy reference
and it is recommended to place the second label into the inside front cover of the SOLIVIA inverter user manual or another location where you can
easily nd it.
NOTE: The SOLIVIA GW box contents do not include two twisted pair Ethernet cables required for installation. The Ethernet cables should meet or
exceed the standard TIA/EIA- 568-B-2.1. These standard twisted pair Ethernet cables can be purchased in the appropriate lengths for your installation
at many electronics and ofce supply retailers.
Safety warning
ADHERE TO ALL CAUTIONS AND SAFETY INSTRUCTIONS IN THE SOLIVIA INVERTER MANUAL
Installation procedure
1. First register for a SOLIVIA Monitor user account at: http://www.solivia-monitor.com. Click on the “Register” link and ll out the registration form.
Note: your email address entered in the registration form will become your username. Recall your password for log in later.
After successfully registering, go back to www.solivia-monitor.com and log in with your new username and password. After logging in you will
see a link at the top of the page called “Manage Customers.” Click on this link to launch the Conguration Wizard that will allow you to set up
customers and PV systems. Complete the Conguration Wizard setup before installing the monitoring hardware. In this way, you can go to the
web portal after the hardware installation and verify everything is working correctly.
IMPORTANT: The SOLIVIA GW Box contains two MAC address labels. The MAC address is required during the Conguration Wizard setup.
As noted in planning, please keep one MAC address label in a place where you will nd it easily during the conguration process.
2. At the install site, verify the internet connection is active by connecting a laptop to the internet ready network port and pointing a web browser to
www.solar-inverter.com.
3. Mount the SOLIVIA GW gateway with the appropriate clearance and AC power location specied in the planning section.
4. Securely connect the DB25 to RJ45 adapter with the thumbscrews to the SOLIVIA GW gateway. See step 1 in the diagram.
5. Connect an Ethernet network cable between the RJ45 connector on the adapter and the RS485 connector on the SOLIVIA inverter.
See step 2 in the diagram.
6. Connect an Ethernet network cable between the SOLIVIA GW gateway and the internet ready network port. See step 3 in the diagram.
7. Connect the power source to the SOLIVIA GW (Step 4 in the diagram) and check the SOLIVIA GW LED’s. If the setup is correct, the Power LED will
be solid green, the 10/100 MB LINK LED will be solid green, and the 10/100 ACTIVITY LED will be ashing green. The ERROR LED should be off
during normal operation and the RS485 ACTIVE LED will be ashing green every 200 seconds. See the LED Status table for further LED information.
8. Verify that your setup is successful by going to the SOLIVIA Monitor web portal at: http://www.solivia-monitor.com and log in to view your PV system.
If you have a problem, please check the Troubleshooting RS485 communication tips rst and then contact Delta support for further help.

Installation
January 30, 2012
Delta Products Corporation
Support Email: support.usa@solar-inverter.com
Support Hotline: 1-877-442-4832 or 1-626-369-8019
1
2
3
4
Power
Connection*
To Internet Connected
Network Port
Connect the
cable to one
of the connectors
at A or B
RS485 connector on SOLIVIA AP
or EU grid-tie inverters
A
B
RS485 connector in SOLIVIA NA
grid-tie inverter wiring box
*U.S. power receptacle shown.
The SOLIVIA GW comes with an
international AC / DC adapter which
will operate in many countries
worldwide. The input voltage range
must be between 100V - 240V AC.
NOTE: When installing
the monitoring device to a
SOLIVIA NA inverter, the
Ethernet cable must be
routed through a 1/2“ conduit
on the SOLIVIA NA inverter
wiring box. Please check
the inverter user manual for
further information.
LED Status
LED Name(s) Color and Condition Description
Power Green - Solid Gateway Powered On
10/100 MB LINK Green - Solid 100 Mb Link Established
10/100 ACTIVITY Green - Flashing Once Per Second Data Transfer
ERROR OFF Normal Operation (If ERROR LED is lit in combination with a solid or ashing
green LED below, there is a problem)
ERROR and RS485 ACTIVE ERROR Steady Red and RS485 ACTIVE Flashing Green Device Error
ERROR and RS485 ACTIVE ERROR Flashing Red and RS485 ACTIVE Flashing
Green
• No DHCP response or
• Wrong MAC Address or Inverter ID entered in the con guration process or
• Con guration Wizard setup was not completed
RS485 ACTIVE Green - Solid Connection to the inverter is successful
RS485 ACTIVE Green - Flashing (every 200 sec.) Communication with the inverter
RSR85 ACTIVE OFF No connection to the inverter
Delta Energy Systems (Germany) GmbH
Support Email: support@solar-inverter.com
Support Hotline: 0180 16 SOLAR (76527)
www.solar-inverter.com
www.deltaenergysystems.com
Monday to Friday from 8 am to 5 pm (except official Bank
Holidays) (3.9 ct/min.)
This cable length
should not exceed
1,000 meters or
3,000 feet.
This cable length
should not exceed
100 meters or
300 feet.
DB25 to RJ45
Adapter (included
with the gateway)
USA & CANADA EUROPE
Troubleshooting RS485 communication
1. Try a different Ethernet cable if the network or inverter connection is not established. There may be a broken wire in the cable.
2. Verify that the gateway is powered up - Power LED should appear solid green.
3. If the length of the cable is greater than 65 meters or 200 feet, verify that shielded cable is used.