CODING
- 134094
DENVER ASSEMBLY GUIDE
/ 32
STEP 6
STEP 4
STEP 2
STEP 5
STEP 3
STEP 1
- Insert hardware A1 onto panel (1).
(Repeat 12 times.)
- Insert hardware A2 onto panel (1).
(Repeat 2 times.)
- Insert hardware B onto panel (1).
(Repeat 8 times.)
SCREWDRIVER
REQUIRED
* Ensure the arrows on hardware A1 point towards mounting positions.
- Insert hardware A1 onto panel (2).
(Repeat 4 times.)
- Insert hardware B onto panel (2).
(Repeat 4 times.)
SCREWDRIVER
REQUIRED
* Ensure the arrows on hardware A1 point towards mounting positions.
- Attach panel (5) to panel (1).
- Insert all hardware A2 into A1.
- Rotate all A1 until tight.
- Apply A3 onto all A1.
(Repeat 8 times.)
OR
SCREWDRIVER
REQUIRED
* In this step hardware A1, A2 and B are pre-inserted.
HARDWARE
D
A2
x2
ROTATE
x8
PRESS
B
PRESS
A1
x12 x4
PRESS
B
PRESS
A1
x4
PRESS
A1
x2
x4
PRESS
B
A2
x8
ROTATE
A2
x8
ROTATE
x4
ROTATE
I
E
x6
PRESS
B
Section View
x8 ROTATE
A2
A1
x8 PRESS
A3
Attach panel (6) to panel (2) by using hardware F.
(Repeat 8 times.)
SCREWDRIVER
REQUIRED
Fx8
ROTATE
1
1
2
2
33
45
5
5
6
6
6
* In this step hardware B are pre-inserted.
- Insert hardware A1 onto panel (4).
(Repeat 2 times.)
- Insert hardware A2 onto panel (3).
(Repeat 8 times.)
- Insert hardware B onto panel (4).
(Repeat 4 times.)
SCREWDRIVER
REQUIRED
* Ensure the arrows on hardware A1 point towards mounting positions.
- Assemble hardware I to panel (5) with hardware E.
(Repeat 4 times.)
- Insert hardware A2 onto panel (5).
(Repeat 8 times.)
- Insert hardware B onto panel (6).
(Repeat 6 times.)
SCREWDRIVER
REQUIRED