
LNK-INJ-48-95W
Hardened 1 RJ45 Gigabit data input port to 1 RJ45 Gigabit PSE output port 95W PoE In ector
2 V1.0
Installation
DIN Rail Installation
LNK-INJ-48-95W can be installed on a DIN rail. Installation steps are as follows:
Wall Mount Installation
LNK-INJ-48-95W also can be installed on a Wall Mount. Installation steps are as follows:
Setup
a) Connect the LNK-INJ-48-95W to the power supply. Ensure the power supply in connected to a power
source and the PWR indicator is ON. If not, please ensure that the power cable is connected properly
and the power supply is functioning normally.
b) Connect the Ethernet Port to the network equipment (Switch or PC), Connect the PoE Out Port to the
Power Device (PoE IP-CAM).
c) After all cables are correctly connected, the indicators will be lit as per port status LEDs (page 3).
1. Tighten the screws to fix the
DIN Rail plate
1. Tighten the screws to fix the
DIN Rail plate
2. Mount the switch on the wall or
on a flat surface with 2 screws
piercing through the mounting
holes to secure it in position.
2. Lock the upper part of the
rail clip on the upper side of the
track. Press it until the metal part
move downward and a “click sound
is heard”