
13
Loosen the two top posts on the nose
slide, and then install the laser head on
the nose slide from top to bottom.
Slide the laser head down to the appro-
priate position, and then tighten the
screws on the right hand.
Insert the power supply cable connec-
tor of the laser head into the laser
terminal port.
Insert the gas pipe from the air pump
into the gas pipe interface of the laser.