manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. GE
  6. •
  7. Network Hardware
  8. •
  9. GE DEH41552 User manual

GE DEH41552 User manual

Other GE Network Hardware manuals

GE MDS P21 Original operating instructions

GE

GE MDS P21 Original operating instructions

GE MDS 4710M User manual

GE

GE MDS 4710M User manual

GE TruVision NVR 40 User manual

GE

GE TruVision NVR 40 User manual

GE 40M06AAG User manual

GE

GE 40M06AAG User manual

GE PB3-POS-RP ProBridge User manual

GE

GE PB3-POS-RP ProBridge User manual

GE TruVision NVR 40 User manual

GE

GE TruVision NVR 40 User manual

GE ATS1203 Assembly instructions

GE

GE ATS1203 Assembly instructions

GE MDS iNET Series User manual

GE

GE MDS iNET Series User manual

GE MDS TransNET User manual

GE

GE MDS TransNET User manual

GE MDS SD Series User manual

GE

GE MDS SD Series User manual

GE 3300 User manual

GE

GE 3300 User manual

GE NetworX NX-7002 User manual

GE

GE NetworX NX-7002 User manual

GE 0150-0241 ProBridge User manual

GE

GE 0150-0241 ProBridge User manual

Popular Network Hardware manuals by other brands

socomec SNMP Card II quick start guide

socomec

socomec SNMP Card II quick start guide

NVR SYSTEMS 4-CH user manual

NVR SYSTEMS

NVR SYSTEMS 4-CH user manual

Draytek VigorSwitch G1240 quick start guide

Draytek

Draytek VigorSwitch G1240 quick start guide

Westermo TD-34 LV installation manual

Westermo

Westermo TD-34 LV installation manual

LaCie Network Space MAX Quick install guide

LaCie

LaCie Network Space MAX Quick install guide

ZoneVu ZSI-450-IP Installation guide & user manual

ZoneVu

ZoneVu ZSI-450-IP Installation guide & user manual

QNAP Turbo NAS Application notes

QNAP

QNAP Turbo NAS Application notes

OpenEye MV Series quick start guide

OpenEye

OpenEye MV Series quick start guide

Huawei SmartAX MT880a quick start guide

Huawei

Huawei SmartAX MT880a quick start guide

Proxim Tsunami QuickBridge 2454-R installation guide

Proxim

Proxim Tsunami QuickBridge 2454-R installation guide

Bay Networks CLAM quick start guide

Bay Networks

Bay Networks CLAM quick start guide

Innodisk SATADOM-SH 3SE Series manual

Innodisk

Innodisk SATADOM-SH 3SE Series manual

Cisco CGR 1000 Series Getting connected guide

Cisco

Cisco CGR 1000 Series Getting connected guide

Matrix Switch Corporation MSC-HD161DEL product manual

Matrix Switch Corporation

Matrix Switch Corporation MSC-HD161DEL product manual

National Instruments NI 653x user manual

National Instruments

National Instruments NI 653x user manual

B&B Electronics ZXT9-IO-222R2 product manual

B&B Electronics

B&B Electronics ZXT9-IO-222R2 product manual

Yudor YDS-16 user manual

Yudor

Yudor YDS-16 user manual

D-Link ShareCenter DNS-320L datasheet

D-Link

D-Link ShareCenter DNS-320L datasheet

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

DEH41552 INSTALLATION INSTRUCTION FOR RIGHT POLE MOUNTING ONLY
Undervoltage Release Device
ELECTRICAL DATA
Cat No.
(Right Pole Only)
Rated
Voltage
MA Current
Dc Ac
TEYXU1 24V Ac --- 100
TEYXU2 48V Ac --- 50
TEYXU3 120V Ac --- 17
TEYXU4* 240V Ac --- 10
TEYXU6 24V Dc 100 ---
TEYXU7 48V Dc 50 ---
TEYXU8 125V Dc 18 ---
TEYXU9* 250V Dc 11 ---
—
Figure 1.
CAUTION: The device is factory installed in the right
pole only. Before inspecting or beginning any maintenance
works on the breaker, it must be dis connected from all
voltage sources, both power and control, an d breaker
placed in th
e off (open
).
—
Fig
ure 2.
NOTES:
1.A
ny work r
equiring cover removal of a sealed breaker
voids UL listing. The UL label must be destroyed.
2 . UVR cannot be installed in bre
akers code dated with
this numb
er or lower: 10
1
STEP
2
Removing Cover
Remove breaker c
over by re
moving cover screws as shown
in Figure 3. Tar must be removed and discarded to gain
access to screw. Remove and save plastic handle and
shutter.
Push trip bar towards load end to trip mechanism.
*Rated UVR coils includes externally serious mounted
resistor.
D
ESCRIPTION
T
his device is used for automatic breaker tripping when
line voltage drops below a pre-determined level.
STEP 1
Breaker
Preparation for Field Installation.
Open breaker contacts by moving handle to the breaker
“OFF” position as shown in Figure 2.
—
Figure 3.
1
This accessory to be installed in Right Pole only.
STEP 5
5a. Removal of existing barrier
Remove the barrier between right pole and
mechanism center pole, as shown in Figure 6a
—
Figure 5.
STEP 4
Removing Tie Bar
Use #1 Phillips screw driver
to remove the tie bar and
its mounting screws from right pole as shown in
Figure 5.
Save th
e tie bar a
nd its mounting screws.
—
Fi
gure 6b.
STEP 3
Cover Modification for Wire Exiting
Perform cover modification as shown in Figure 4.
Remove all debris.
LINE
END
LINE
END
CUT NOTCH IN RIGHT SIDE
LOAD
END
LOAD
END
BARRIER SUPPLIED WITH KIT
REMOVAL OF EXISTING BARRIER
—
Figure 6a.
5b. Installation of Phase Barrier for UVR
Assemble the Phase barrier supplied with kit, as shown
in Figure 6b
2
—
Figure 4b. Side View of Breaker Cover
CUT NOTCH IN RIGHT SIDE
—
Figure 4a. Side View of Breaker Cover
STEP 7
Reinstalling Cover
Reinstall plastic breaker handle and shutter. Position the wires to
match the wire exiting hole in the cover as shown in Figure 9.
Make sure no wires are pinched in the routing.
Wires must pass through the cover notch as shown in Figure
10.
Make sure the cover is properly seated and tighten the
four inner cover mounting screws to torque value of 12-15
Lb-in and two outer mounting screws to 18-22 Lb-in.
—
Figure 9.
—
Figure 10.
While dropping down the UVR in the right pole, make
sure that the UVR reset arm is properly relieved and made
to rest on the handle “L” bend extension provided as
shown in the figure 8.
UVR Reset Arm
Handle
Yoke
“L” Bend
—
Figure 8.
—
Figure 7.
3
STE
P 6
INSTALLATION
Drop down the UVR in the right pole in locating holes
provided in Base as shown Figure 7.
Be absolutely sure to reinstall parts in their proper
location which are accidentally removed from the breaker.
These instructions do not purport to cover all details or variations in equipment nor, to
provide contingency to be met in connection with installation, operation, or
maintenance. Should further information be desired, or should particular problems
arise which are not covered sufficiently for the purchaser’s purposes, the matter should
be referred to ABB Company.
STEP 8
PERFOR
MANCE CHECK
Move breaker handle to “OFF” position to reset breaker.
With coil deenergized, move breaker handle towards “ON”
position. Breaker should trip and handle should come to
rest in the tripped position when released.
Apply 80% of rated voltage to coil (use dropping resistor if
required). Repeat Step 1, then move handle to “ON”
position. Breaker should turn “ON” and stay “ON”.
Reduce coil voltage. Device should trip breaker between
35% and 70% of rated voltage.
STEP 9
LOCATI
ON OF LABELS
Rating Label Location
Paste the Rating Label on the Base as shown in the
Figure 11.
Tick the respective Voltage Rating in the check Box
provided in the Rating label to be offered to Customer
Rating Label
—
Figure 12.
—
Figure 11.
Line and Load Labels
Paste the Line and Load Labels on the top of
the Cover as shown in the Figure 12.
Align horizontal bottom edge of
Rating Label with the barcode label
top edge
Align vertical edge of the Rating Label
with the Base vertical edge reference
4
1SQC930043M0201, DEH41552 February 2020
—
ABB Inc.
305 Gregson Drive
Cary, NC 27511.
electrification.us.abb.com
—
We reserve the right to make technical
changes or modify the contents of this
document without prior notice. With
regard to purchase orders, the agreed
particulars shall prevail. ABB Inc. does not
accept any responsibility whatsoever for
potential errors or possible lack of
information in this document.
We reserve all rights in this document and
in the subject matter and illustrations
contained therein. Any reproduction or
utilization of its contents – in whole or in
parts – is forbidden without prior written