
LPS02
- 7 -
V1.0
INSTALLATION
•The pyr nometer must be mounted in n e sy-to-re ch loc tion in order to cle n
the dome regul rly nd c rry out m inten nce. At the s me time, m ke sure th t
no buildings, constructions, trees or obstructions exceed the horizont l pl ne where
the pyr nometer lies. If this is not possible, select site where obstructions in the
p th of the sun from sunrise to sunset do not exceed 5 degrees of elev tion. N.B.:
The presence of obstructions on the horizon line affects significantly the
measurement of direct irradiance.
•The pyr nometer must be loc ted f r from ny kind of obstruction, which might re-
flect sunlight (or sun sh dow) onto the pyr nometer itself.
•The m st height does not exceed the pyr nometer pl ne to void me surement er-
rors c used by ny reflection or sh dow of the m st itself.
•In compli nce with ISO TR9901 st nd rd nd WMO recommend tions, if the pyr -
nometer is used without the sol r r di tion protection screen, it must be positioned
so th t the connector points to the North Pole, if the instrument is used in the North-
ern Hemisphere, nd to the South Pole, if used in the Southern Hemisphere. In ny
c se, it is better to follow this recommend tion even when the screen is used.
•For fixing, use the two M5 or the two M8 holes in the lower p rt of the pyr nome-
ter. For n ccur te horizont l positioning, djust the height of the two lower feet
with knurled ring, using the bubble level integr ted in the pyr nometer.
Note: for horizontal positioning it is preferable to use the bubble level also in mod-
els equipped with a tilt sensor as it is more accurate; use the tilt sensor for posi-
tioning monitoring after installation. Use the tilt sensor for installation only if the
pyranometer must be positioned tilted with respect to the horizontal plane.
•It is prefer ble to therm lly insul te the pyr nometer from its mounting br cket by
securing it not with the b se directly in cont ct with the support pl te, but by le v-
ing l yer of ir in between (for this purpose, lw ys use the feet even if the in-
st ll tion is not horizont l), while t the s me time ensuring th t there is good
electric l cont ct to ground.
Fig. .1: position of fixing holes and bubble level