Gimenez Ganga saxun Bioclimatic Pergola P-150 CR User manual


Table of Contents
We do not provide the screws for fixing-anchoring to the wall and/or foundations. The fitter must choose the adequate rod/screw/plug/
nut/washer system for fixing and flushing to the foundations and/or wall based on the nature of these surfaces.
In any case, the screws must be in stainless steel.
1. Installation of the closure beam and columns .............................................................................................. 6
1.1 Fixing the closing beam..................................................................................................................................................................... 6
1.2 Attachment of the base to the column...................................................................................................................................... 7
1.3 Positioning of the reinforcement brackets..............................................................................................................................8
2.2 Electrical pre-installation ................................................................................................................................................................9
2. Installation of beams............................................................................................................................................... 10
2.1 Installation of beams ........................................................................................................................................................................10
2.2 Assembly of the side beams with the closure beam........................................................................................................ 11
2.3 Installation of the opening beam............................................................................................................................................... 12
2.3.1. Combination with closed column ................................................................................................................................... 13
2.4 Levelling of the structure ............................................................................................................................................................. 15
2.5 Installation of surface manifolds................................................................................................................................................ 16
2.6 Installation of gomme parts ..........................................................................................................................................................17
3. Drainage ........................................................................................................................................................................18
3.1 Installation of U-shaped drainage channels.......................................................................................................................... 18
3.2 Installation of drainage parts ...................................................................................................................................................... 19
3.2.1 Drainage channel closed column................................................................................................................................... 23
4. Installation of slats...................................................................................................................................................24
3.1 Installation of slats ........................................................................................................................................................................... 24
3.2 Installation of transmission plate .............................................................................................................................................27
3.3 Motor installation..............................................................................................................................................................................27
5. Electrical connections ...........................................................................................................................................29
The connection of the electrical installation must be done adhering to the current regulations for low voltage (REBT).
6.1 Teleco documentation.................................................................................................................................................................... 29
6.2 Somfy documentation................................................................................................................................................................... 29
6.3 Installation of column-mounted automation systems .................................................................................................... 29
6.4 Perimeter LED installation...........................................................................................................................................................30
6. Installation of covers................................................................................................................................................31
6.1 Trim cover.............................................................................................................................................................................................. 31
6.2 Top cover............................................................................................................................................................................................. 32
7. Maintenance................................................................................................................................................................33
Before assembling, please read the maximum tightening torque for each type of screw, as indicated in this section.
Annex I Disassembly and disposal of packaging and product components at the end of the product’s service life ..34
Annex II Warranty certificate ...........................................................................................................................................38
Bioclimatic Pergola installation check sheet.............................................................................................................. 40

4
Before assembly
Check the slope of the ground and verify the total height of your pergola 3D scale plan in order to line up the S surface and beam fixtures
correctly with the wall.
Total wall height
Warning: Leave 100 mm free at each end
of the beam to allow the slats to rotate
correctly.
Height - slope =
Total wall height
Width
Long
Wall
Column base fixing
Top view
Side view

5
BIOCLIMATIC PERGOLA P-150 CR 2 COLUMNS PARALLEL TO THE WALLASSEMBLY INSTRUCTIONS
150
8234,8 33,2
74,2
74,2
150
8233,2 34,8
To obtain the 90º angle with the wall, follow the steps indicated
below:
1 Mark the total width of the pergola on the wall where it will be
installed.
2 At each end of the pergola width, mark a point parallel to the
wall at a distance of 2000 mm from it.
3 Make another two marks perpendicular to the ends of the
pergola length at a distance of 2000 mm.
4 The exact measure of the diagonal lines between the points
marked to obtain the 90º angle must be 2828.40 mm (as shown
in the drawing).
After measuring the 90º angle, install the base fixings using
M10 screws (not included), with a quality of at least AISI 304
(stainless steel).
•We recommend installing against a reinforced concrete wall
and foundations that are at least 150 mm thick (or a surface
of equal strength) using 12 mm stainless steel screws (not
included).
2.000
2.828,40
2.828,40
2.000 2.000
2.000
4
3
212
43

6
Use the two mitred cut ends of the beam to make the holes that will allow us to fix the beam to the wall.
Attach the beam to the wall with a maximum distance between attachment points of 500 mm in the gutter area so that they are con-
cealed.
After verifying the height, fix the beam against the wall, screwing it through the holes.
The beam will be installed using the adequate screws for the type of wall and they will always be in stainless steel.
Check that the closing beam is level to the base, its height from
the plan and that all markings form a 90º angle with the base
brackets.
The correct installation of the beam and the bases is critical for
the optimum operation of the pergola.
Screws and wall anchors not included.
Importante
90º
90º
90º
90º
1. Installation of the closure beam and columns
1.1 Fixing the closure beam

7
BIOCLIMATIC PERGOLA P-150 CR 2 COLUMNS PARALLEL TO THE WALLASSEMBLY INSTRUCTIONS
1.
3.
2.
1.2 Attachment of the base to the column
Place the base on the column and screw it to the inner
reinforcement plates of the column using DIN 933 A2
M8x16 screws and DIN 125 A2 M8 washers (1).
Place over the screw DIN 933 A2 M12x50, which will
allow the height of the column to be adjusted, and tighten
it loosely. (2)
Screw a coupling piece of the cover profile onto the base
L using a DIN 933 A2 M6x10 screw. (3)

8
1.3 Positioning of the reinforcement brackets
Once the column has been bolted to the base, fit the reinforcement bracket, dropping it on top of the column.
Then screw a coupling piece of the cover profile onto the reinforcement bracket using a DIN 933 A2 M6x25 screw. Finally, place the
column in its position in the assembly.
Check that the closing beam is level to the base, its height from the plan and that all markings form a 90º angle with the base brackets.
The correct installation of the beam and the bases is critical for the optimum operation of the pergola.
Instructions
Assembly video
Scan the QR code with your
mobile device or click to
access.

9
BIOCLIMATIC PERGOLA P-150 CR 2 COLUMNS PARALLEL TO THE WALLASSEMBLY INSTRUCTIONS
Cableado interior
1.4 Electrical pre-installation
All the wiring (motor, LEDs, Bluetooth, etc.) that needs to be routed through the beams to the columns should be taken into account
at this point in the assembly and the outlets should be cleared before continuing with the rest of the assembly.
Verify the position of the LED slats in order to pre-install the cabling all the way to the holes.
Remember this step before continuing with the assembly. For a greater safety, it will be necessary to ground the pergola.
Important
Important

10
2,60
2,60
2.1 Beam to column assembly
Screw 2 DIN (ISO 7978) A2 M8x50 screws with DIN 125 A2 M8 washers to the two upper screw holders at both ends of the beams, leav-
ing a gap of 3 cm between the screw head and the start of the beam.
With two columns in position in the assembly, rest the bolts of the beams on the columns. Loosely insert the remaining screws to fix the
position of the beam and tighten to the specified torque.
2. Installation of the beams
It is not necessary to unscrew the gutters from the beams to assemble the structure.
Important
DIN 933 M8x16 A-70 screws
Thread M8
MA tightening torque (Nm) 24
Before tightening the screws, check that the beam is paral-
lel to the edge of the column and that there is a gap of 2.5
mm between the beam and the column for fitting the trim
profile.
Important
Do not tighten the upper right screw; the top cover fitting
will be fixed here later.
Important

11
BIOCLIMATIC PERGOLA P-150 CR 2 COLUMNS PARALLEL TO THE WALLASSEMBLY INSTRUCTIONS
2.2 Assembly of the side beams with the closure beam
When the two sides have been assembled, they will be joined to the closure beam fixed to the wall. The closure beam has brackets on
the ends, where the right and left beams are to be inserted and fixed in place with USL (ISO 7380) A2 M6x16 mm screws (line up the
mitres correctly when tightening th e screws).
As mentioned in the previous point, before installing the side beams, make sure you run the wiring through the beams and out to the col-
umns to make the connections.
DIN 933 M8x16 A-70 screws
Thread M8
MA tightening torque (Nm) 24

12
2.3 Installation of the opening beam
Screw two DIN (ISO 7978) A2 M8x50 screws with M8 DIN 125 A2 washers to the two upper screw holders at both ends of the beam,
leaving a gap of 3 cm between the screw head and the start of the beam.
Place the beam on the columns, and the remaining screws and washers. Install the cover fitting on each of the columns.
Install the front beam using DIN 933 A2 M8x40 screws and DIN 125 A2 M8 washers. Also fit the cover fitting and tighten the screws.
Check that beams and columns are level. If so, carry out the final tightening of all the bolts in the structure, according to the specifi-
cations provided in this manual.
Important
Finally, fix the structure to the ground according to the specifications in section 1.1 “Installation of fixings”.
If the beams are not level, see section 2.4 “Levelling the structure”.

13
BIOCLIMATIC PERGOLA P-150 CR 2 COLUMNS PARALLEL TO THE WALLASSEMBLY INSTRUCTIONS
2.3.1 Combination with closed column
1. Assembly of beams and columns.
The beams are connected to the closed columns by means of four washers, four DIN 933 A2 M8x40 screws and two ULS (ISO 7380) A2
M6x16 screws.
To do this, unscrew the gutters that are screwed to closed columns.
Follow the screwing sequences indicated in the image.
Screw
DIN (ISO 7976) A2 M8x50
No. 050198
ULS (ISO 7380) A2
M6x16
No. 051103
Angle bracket for
column cover
No. 050262
Pergola S beam 180 mm single
column angle bracket
No. 050401
M8 DIN 125 A2 washer
No. 022839

14
ULS (ISO 7380) A2
M6x16
Cod. 051103
2. Fixing the inverted "U" profile to the floor
With the inverted "U" profile already mounted, fix it to the column bases of the foundation using the (ISO 7380) a2 M6x16mm screws.
3. Installation of cover fittings
With the structure assembled, we will install the fittings for the top covers of the closed columns.
Tighten and do the final adjustment of all the screws in the framing brackets.
Do not install the internal reinforcement until the entire gutter has been installed through the foundations, if necessary.
Important

15
BIOCLIMATIC PERGOLA P-150 CR 2 COLUMNS PARALLEL TO THE WALLASSEMBLY INSTRUCTIONS
2.4 Levelling the structure
If, once the structure is anchored, the beams are not level,
loosen the 8 screws connecting the base to the column, so that
the column slides over the base. It is important not to remove the
screws.
Screw in the M12 screw to raise the column until the beam is
level and retighten the 8 base screws.
At the end of the assembly after section 6.1 Trim cover. When the
height of the column is adjusted, two trim pieces are attached to
the base. To fix the trims, they are sealed with silicone.

16
2.5 Instalación colectores de superficie
Apply the provided sealant between the contact sides of the opening and closing beams and their corresponding surface manifolds.
Join the manifolds of the opening and closing surface by clipping them to the adapters.
Do not bypass this step, it is very important to seal the
manifold joint properly (sealant provided).
Importante
Before continuing the installation, create a groove for the water run-o at each end of the opening manifold (use a hammer and a
flat screwdriver).
Importante
A A
B B
C C
D D
E E
F F
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
Manifold
clipping
closure
Manifold
clipping
closure
Sellador

17
BIOCLIMATIC PERGOLA P-150 CR 2 COLUMNS PARALLEL TO THE WALLASSEMBLY INSTRUCTIONS
2.6 Installation of gomme parts
Apply the included sealant between the mating faces of the clip-on adapters or OPENING and CLOSING beams, and their respective
clip-on manifolds. Clip the opening and closing manifolds (same profile, just in an inverted position). You will possibly need to use clamps
or wooden plugs to help you with the clipping.
Installing gomme on the clippable opening gutter. Installing gomme on the last (closure) slat.
Installed in the opposite way to the rest of lasts.
The clippable closing gutter does not have gomme.
Installing gomme on the slats (150 slat step) Installing gomme on the slats (150 to 160 slat step)

18
3. Drainage
3.1 Installation Profilé “U”
Start by installing the “U” profile with the pre-mounted motor on the LEFT beam. To do this, it will be necessary to insert the profile end
through the pre-drilled draining hole in the B column. Install the “U” profile on the other side following the same procedure.
The aluminium profile of the "U" gutter must fit approximately 3.5 mm into the column on each side. It is important that the gutter is cen-
tred on the beam and that the same gutter spacing is used on both columns.
Check that all the “U” profile holes match the M6 machined ones on the beam. If all of them match, apply the sealant between the “U”
profile and the beam after screwing the profiles with the USL (ISO 7380) A2x16 screws.
Use the sealant provided to seal the “U” profiles to the beams and the joints that could suer water leaks.

19
BIOCLIMATIC PERGOLA P-150 CR 2 COLUMNS PARALLEL TO THE WALLASSEMBLY INSTRUCTIONS
3.2 Installation of drainage parts
Before starting the installation, it is important to clean the drainage parts and gutters so that the silicone adheres perfectly to the surfac-
es.
1. Gutter extensions
These parts are placed at the ends of the U-shaped channel profiles.
The number of parts used will depend on the number of gutters entering the column: one piece for one gutter or two pieces for two
gutters.
Follow the steps below to install the parts:
Be very careful when installing the drainage pieces in the open columns, so as not to make any mistakes that could aect the water
channelling. Make sure all the joints are well sealed with silicone sealant.
Advertencia
Apply a large amount of silicone in the grooves of the 3
outer faces of the piece (marked with red arrows), so that
when the piece is put in place, the silicone will overflow and
create a joint between the piece and the gutter, preventing
the passage of water.
The entire surface marked in blue must be covered in silicone.
Install the piece into the gutter from the inside of the
column, taking care not to remove the silicone in the
process.
1. 2.
Once the part has been fitted, it should meet the end of
the gutter, as shown in the picture.
Press on the 3 sides of the part: bottom, left and right
(marked with red arrows) to seal the part against the
gutter.
The silicone, applied previously, must overflow through the
free spaces between the part and the gutter (marked in
blue in the image).
3. 4.

20
The corner between the extension piece and the gutter
must then be sealed.
To do this, apply silicone (lines in red) and go over it, mak-
ing sure that no gaps are left unsealed.
Results.
(Silicone marked in blue)
Repeat the process with the other gutter extension piece
if required for the column assembly.
To insert it, rotate and place one end behind the exten-
sion already in place and then insert the other end of the
piece, taking care not to remove the silicone marked in
blue in the drawing.
Finally, repeat installation steps 3 and 4 above.
5.
7.
6.
Table of contents