
GPD Global®Service Department
611 Hollingsworth Street, Grand Junction, CO 81505
tel +1.970.245.0408 • fax +1.970.245.9674
(1.800.742-5473) • www.gpd-global.com 4/13/11
Service Procedure
CF8 Wire Clamp
Replacing Wire Clamp PN 801-1-9
Prepare CF8
To prepare the CF8 for wire clamp replacement:
1. Unplug machine power.
2. Remove the transport wheels.
3. Close station 1 (Infeed Chute Adjustment).
4. Remove all dies from stations 6 & 7.
5. Set station 6 & 7 to 700.
6. Set station 8 & 9 to 0 (zero).
Remove Wire Clamp
To remove the wire clamp from the CF8:
1. Using a .050” Allen wrench, loosen the set screw in crank (PN 801-1-7) in station
8 & 9.
2. Remove crank pin (PN 801-1-12).
3. Remove slide assembly (PN 801-1-200) by lifting it upward.
4. Remove 2 cap screws securing wire clamp (PN 801-1-9) to clamp support.
5. From one side, remove the small snap ring (PN G1001) that retains wire clamp
pin (PN 801-1-15).
6. Slide wire clamp pin (PN 801-1-17) from roller support assembly (PN 801-1-100)
and roller (PN 801-1-15).
7. Replace wire clamp (PN 801-1-9) in reverse of Step 4 through Step 6 (in Remove
Wire Clamp section).
Adjust Wire Clamp-to-Die Alignment
To fine tune the alignment of the wire clamp to the die:
1. Install horizontal or modified horizontal dies of any size in stations 6 & 7.
2. Place slid assembly (PN 801-1-200) in die block.
3. Inspect wire clamp-to-die alignment. Correct alignment occurs when the wire
clamp is aligned in the same plane as the die (shown below at left), as opposed to
the wire clamp being offset to the right or left of the die surface.