
(A) Tent
(B) Floor Tray
ASSEMBLY GUIDE ASSEMBLY GUIDE
STEP 1
240 x 120 x 205cm
CONTENTS STEP 2
Assemble the frame by attaching the poles into the
corner units (D) as shown above. Make sure that
the poles are securely pressed into the corner unit,
(you will hear a clicking sound).
Fit the ceiling hanging bars inside the tent as shown.
Insert (4) first and then place (5) on top. These poles
can be moved arround to accomodate for different
equipment.
(1 - 5) Framework Support
A1 pcs B1 pcs
C
1
2
3
4
5
4 pcs D8 pcs
E2 pcs F2 pcs
6 pcs
6 pcs
14 pcs
4 pcs
4 pcs
(C) Filter Straps
(D) Corner Adapter