
CARE AND MAINTENANCE
Periodically check all fixings to ensure they remain secure - Prolonged exposure to the elements will
inevitably lead to weathering of the metal parts, although this may be considered a feature, original or
alternative colours can be achieved by appropriate application of any outdoor paint suitable for metal
Should you require further details or assistance, please contact our customer care line on 01562
753040
GABLEMERE LTD DY11 7FB
STEP 3:
CONNECT THE TWO ARCH SECTIONS
(A) TOGETHER AT THE BASE USING
THE 2 CONNECTING RAILS WITH
ADDITIONAL FLANGES (G) AND USING
4 x (30 mm NUTS, BOLTS AND
WASHERS
STEP 4:
CONNECT THE TWO ARCH SECTIONS
(A) TOGETHER USING THE REMAINING
3 CONNECTING RAILS (F) AND USING 10
x 35 mm BOLTS
STEP 5:
ATTACH THE ASSEMBLED ARCH
SECTION TO THE PRE-ASSEMBLED
BENCH SECTION USING 4 x 50mm NUTS,
BOLTS AND WASHERS
ENSURE THE ASSEMBLY IS SQUARE AND
STANDING CORRECTLY THEN FULLY
TIGHTEN ALL NUTS AND BOLTS –(plastic
nut covers are supplied for visible nuts / bolts)
THE ARCH CAN BE ANCHORED TO A
LAWN USING PEGS (NOT PROVIDED) OR
SECURELY AND PERMANENTLY FIXED
TO OTHER SURFACES USING
APPROPRIATE SCREWS OR FIXINGS (NOT
SUPPLIED)