Haas Automation OFFICE MILL User manual

OFFICE MILL
OPERATOR’S ADDENDUM
96-0198 Rev V
March 2012 © 2012 Haas Automation, Inc.


1
96-0198 Rev V
March 2012
Installation
NOTE: Use these installation recommendations with those in the
Vertical Mill Reference Manual. Information supplied here is
1. Unwrap the shipping material and lift the machine from the pallet.
4. Connect power and air.
6. Do a spindle sweep.
7. Run-in the spindle.
Lift The Machine
Refer to the Vertical Mill Reference Manual for information on machine lifting.
Install Casters (Optional)
Warning
Leveling Pads
24-1/2 (622 mm)
Pallet Jack
Pendant ArmShown
in Shipping Position
Control
Cabinet
SIDE VIEW

296-0198 Rev V
March 2012
1. Raise the leveling screws high enough to remove the leveling pads. This lowers
this is complete.
Put the pendant arm into operating position when the machine is in place.
1. Remove the four screws from the pendant arm.
2. Swing the pendant arm 90° toward the front of the machine to the operating
position.
3. Replace the pendant arm screws.
3. Remove the four screws from the pendant arm.
screws.
position and reinstall the door handles.
Remove the Shipping Brackets
Spindle Head Shipping Bracket

3
96-0198 Rev V
March 2012
Cable Carrier Shipping Bracket Coolant Tank Shipping Bracket
NOTE: Refer to the Vertical Mill Reference Manual for machine leveling
instructions.
. Fine leveling will not affect the cutting performance of
the mill and
Connecting Electrical Power

496-0198 Rev V
March 2012
-
nects to voltage that can range from 195V to 254V.
power using a L6-20R connector. This connector has 2 power pins and a ground
L1
L2
Single-Phase Connection
Line Load
Connecting Air
CAUTION
when it is connected to the machine.
1. Refer to the procedure given in the Installation section of the Service manual to

5
96-0198 Rev V
March 2012
CAUTION
moved in the tool holder.
-
-
the spindle.

696-0198 Rev V
March 2012
Operation
You can use HA5C indexers with AC-25 or AC-125 air collet closers, or an HRT110 or
Office Mill with HRT110 Rotary Table Office Mill with TR110 Rotary Table
Maintenance
-
dures.
Tool Changer
Table of contents
Other Haas Automation Industrial Equipment manuals
Popular Industrial Equipment manuals by other brands

Cognex
Cognex In-Sight 3800 Series Reference manual

FLENDER
FLENDER FASTEX EC220 Assembly and operating instructions

ABB
ABB G391 Series quick start guide

Emerson
Emerson Aventics G3 Series Technical manual

MATE
MATE ULTRA C Installation and replacement instructions

KStrong
KStrong AFA935865 User instruction manual