D1013-0001-00
PAGE 2
LINEA CONFERENCE TABLE
HBF
4 INSTALL SPLINES
5 ALIGN AND SECURE WORKSURFACE
-INSTALL ONE JOINT CONNECTOR (E) ON EACH END OF
JOINT TO ENSURE PROPER ALIGNMENT
-INSTALL REMAINING JOINT CONNECTORS
NOTE: TOP WILL HAVE TO BE MOVED FROM SIDE TO SIDE
SLIGHTLY IN ORDER TO INSTALL ALL JOINT CONNECTORS
-INSERT SPLINES (D) IN ONE GROOVE OF EACH JOINT
-PLACE TOPS ON THE BASES IN FINAL LOCATION
-SLIDE TOPS TOGETHER ALIGNING THE SPLINES
TO THE GROOVE
DETAIL D
3 ALIGN AND ATTACH SUPPORT RAILS
-ALIGN TWO RAILS WITH MOUNTING HOLES IN SIDES OF BASE
-SECURE TIGHTLY FROM INSIDE BASE WITH CONNECTOR BOLTS (C)
-MAKE SURE TO PROPERLY ALIGN THE ALUMINUM EXTRUSIONS TO FULLY CLOSE GAPS
-REPEAT THIS PROCESS TO SECURE REMAINING RAIL ENDS TO BASES
DETAIL C
SPLINE
NOTE:
DO NOT LIFT TOP ONCE JOINT FASTENERS ARE
INSTALLED. UNEVEN LIFTING WILL PINCH THE
TOP VENEER AT THE SEAM CAUSING A BUBBLE
IN THE VENEER.
NOTE: ALWAYS INSTALL THE TOP RIGHT
SIDE UP ON TOP OF THE BASES. USE
SAWHORSES IF NECESSARY TO SUPPORT
THE TOP BEFORE THE BASES ARE ATTACHED.
SEE DETAIL C
SEE DETAIL D
GROOVE