manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. HP
  6. •
  7. Laptop
  8. •
  9. HP HP EliteBook x360 1020 G2 Assembly instructions

HP HP EliteBook x360 1020 G2 Assembly instructions

EL-MF877-00 Page 1
Template Revision B
PSG instructions for this template are available at EL-MF877-01
Product End-of-Life Disassembly Instructions
Product Category: Notebooks and Tablet PCs
Marketing Name / Model
[List multiple models if applicable.]
HP EliteBook x360 1020 G2 Notebook PC
Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions
for the disassembly of HP products to remove components and materials requiring selective treatment, as defined by EU
directive 2002/96/EC, Waste Electrical and Electronic Equipment (WEEE).
1.0 Items Requiring Selective Treatment
1.1 Items listed below are classified as requiring selective treatment.
1.2 Enter the quantity of items contained within the product which require selective treatment in the right column, as
applicable.
Item Description Notes
Quantity
of items
included
in product
Printed Circuit Boards (PCB) or Printed Circuit
Assemblies (PCA)
With a surface greater than 10 sq cm
3
Batteries
All types including standard alkaline and lithium coin
or button style batteries
1
Mercury-containing components
For example, mercury in lamps, display backlights,
scanner lamps, switches, batteries
0
Liquid Crystal Displays (LCD) with a surface greater
than 100 sq cm
Includes background illuminated displays with gas
discharge lamps
1
Cathode Ray Tubes (CRT)
0
Capacitors / condensers (Containing PCB/PCT)
0
Electrolytic Capacitors / Condensers measuring
greater than 2.5 cm in diameter or height
0
External electrical cables and cords
0
Gas Discharge Lamps
0
Plastics containing Brominated Flame Retardants
weighing > 25 grams (not including PCBs or PCAs
already listed as a separate item above)
0
Components and parts containing toner and ink,
including liquids, semi-liquids (gel/paste) and toner
Include the cartridges, print heads, tubes, vent
chambers, and service stations.
0
Components and waste containing asbestos
0
Components, parts and materials containing
refractory ceramic fibers
0
EL-MF877-00 Page 2
Template Revision B
PSG instructions for this template are available at EL-MF877-01
Components, parts and materials containing
radioactive substances
0
2.0 Tools Required
List the type and size of the tools that would typically be used to disassemble the product to a point where components
and materials requiring selective treatment can be removed.
Tool Description
Tool Size (if
applicable)
Screwdriver #1
Electric torx
screw
driver(T5)
Sucker #2
Sucker
Screwdriver #3
Electric torx
screw
driver(#1)
Screwdriver #4
Electric torx
screw
driver(#0)
Description #5
3.0 Product Disassembly Process
3.1 List the basic steps that should typically be followed to remove components and materials requiring selective treatment:
1. Follow steps described in Disassembly instruction (file attached)
2. If parts can be removed without using a tool, remove it first
3. Use correct screwdriver and torque value before unlock the screw.
4.
5.
6.
7.
8.
9.
3.2 Optional Graphic. If the disassembly process is complex, insert a graphic illustration below to identify the items
contained in the product that require selective treatment (with descriptions and arrows identifying locations).
MANUFACTURING PROCESS INSTRUCTIONS
MECHANICAL ASSEMBLY
MODEL : Eastwood
Auditor :Tabulator:
Tzan.uen-tung
Tzan.uen-tung
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator:Issue department:
Tzan.uen-tung NPSU-PPE
Auditor :
Tzan.uen-tung
Loosen BTCB screw s
1. Loosen BTCB screw s*5
2. Use Sucker Disassemble BTCB
1(1/1)
Electric torx screw driver(T5) 1
Sucker 1
Fig.2
3
4
2
1
1
Fig.1
2017/7/22
1.00
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator:Issue department:
Tzan.uen-tung NPSU-PPE
Auditor :
Tzan.uen-tung
1.Disassemble battery cable CNTR
2.Loosen SSD screw *1 , Disassemble SSD.
3.Loosen Battery screw *6, Disassemble Battery.
2(1/1)
Disassemble battery & SSD
Fig.1
Fig.2
4
5
1 2
6
3
Fig.3
2017/7/22
1.00
Electric torx screw driver(#1) 1
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator:Issue department:
Tzan.uen-tung NPSU-PPE
Auditor :
Tzan.uen-tung
1. Disassemble volume FPC&FP FPC
2. Disassemble speaker CNTR(Fig.2)
3. Disassemble audio FFC (Fig.3)
4. Disassemble clickpad FFC(Fig.4/Fig.5)
3(1/2)
Disassemble FPC/FFC,CNTR
Fig.1
2,Volume CNTR 1.FPR CNTR
Fig.
2
Fig.3
Audio CNTR
2017/7/22
1.00
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator:Issue department:
Tzan.uen-tung NPSU-PPE
Auditor :
Tzan.uen-tung
3(2/2)
Fig.4
Click pad FFC CNTR
Clickpad FFC CNTR
Fig.5
Disassemble FPC/FFC,CNTR 2017/7/22
1.00
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator:Issue department:
Tzan.uen-tung NPSU-PPE
Auditor :
Tzan.uen-tung
1. Disassemble NFC FFC & antenna Fig.1/Fig.2
2. Disassemble NFC Antenna& Camera cable,Fig.3
4(1/1)
Disassemble NFC/camera cable
NFC antenna
Fig.2
Fig.1
MB CNTR
Fig.3
WLAN connector
Camera cable CNTR
2017/7/22
1.00
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator:Issue department:
Tzan.uen-tung NPSU-PPE
Auditor :
Tzan.uen-tung
1. DIS thermal sensor cable &speaker
cable,Fig.1
2. DIS LVDS cable,Fig.2
3. DIS KB FFC & BL FPC,Fig.3/Fig.4
5(1/1)
DIS LVDS/speaker/thermal&KB/BLcable
Fig.1
Fig.2
Speaker CNTR
Thermal sensor CNTR
LVDS cable CNTR
Fig.
3
Fig.
4
KB FFC CNTR
BL CNTR
2017/7/22
1.00
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator:Issue department:
Tzan.uen-tung NPSU-PPE
Auditor :
Tzan.uen-tung
1. Loosen M/B Screw * 5 , Dissemble MB,Fig.1
2. Dissemble power button sponge, Disassemble power button,Fig.2
3. Dissemble volume board& volume button,Fig.3
6(1/1)
Electric torx screw driver(#1) 1
DIS MB & power button/volume button
1
2
3
5
Fig.1
4
Fig.2
sponge
Power button
Fig.3
Volume button
Volume board
2017/7/22
1.00
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator:Issue department:
Tzan.uen-tung NPSU-PPE
Auditor :
Tzan.uen-tung
1. Disassemble Thermal & Fan Screw *6, Disassemble FANCNTR,
Disassemble thermal(Fig.1/2/3)
2. Disassemble speaker cable mylar,Fig.4
DIS thermal& mylar 7(1/1)
Electric torx screw driver(#0) 1
Fig.1 Fig.2
5 6
Fig.3
1
2
3
4
FAN CNTR
Fig.4
2017/7/22
1.00
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator:Issue department:
Tzan.uen-tung NPSU-PPE
Auditor :
Tzan.uen-tung
1. Loosen speaker screw*4,Dissemble speaker,Fig.1。
2. Loosen audio/B screw*1, Disassemble audio/B,Fig.2
DIS speaker 8(1/1)
Electric torx screw driver(#1) 1
Fig.
1
1 4
2 3
Fig.
2
2017/7/22
1.00
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator:Issue department:
Tzan.uen-tung NPSU-PPE
Auditor :
Tzan.uen-tung
1. Loosen FP BRKT screw *1, Disassemble FP BRKT(Fig.1)。
2. Disassemble FP module,& FP FPC,Fig.2
9(1/1)
Electric torx screw driver(#1) 1
Disassemble FP
Fig.
1
取螺絲*1
指紋鐵件
Fig.
2
2017/7/22
1.00
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator:Issue department:
Tzan.uen-tung NPSU-PPE
Auditor :
Tzan.uen-tung
10(1/1)
1. Loosen hinge screw * 6 (Fig.1)。
2. Disassemble LCM module,Fig.2
Electric torx screw driver(#1) 1
2 5
6 1
4 3
Disassemble LCM module
Fig.1
Fig.2
2017/7/22
1.00
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator:Issue department:
Tzan.uen-tung NPSU-PPE
Auditor :
Tzan.uen-tung
1. Loosen Click pad BRKT screw * 6 , Disassemble clickpad,Fig.1
2. Disassemble speaker & thermal sensor/B,Fig.2
DIS Clickpad,thermal sensor/B, speaker
Electric torx screw driver(#1) 1
Fig.1
1
2
3 4
5 6
11(1/1)
Fig.2
speaker
Thermal sensor/B
2017/7/22
1.00

Other manuals for HP EliteBook x360 1020 G2

1

Other HP Laptop manuals

HP EliteBook 8470w Manual

HP

HP EliteBook 8470w Manual

HP Spectre x360 Manual

HP

HP Spectre x360 Manual

HP Presario CQ32-100 - Notebook PC User manual

HP

HP Presario CQ32-100 - Notebook PC User manual

HP EliteBook 820 G2 Manual

HP

HP EliteBook 820 G2 Manual

HP ProBook 640 G1 Manual

HP

HP ProBook 640 G1 Manual

HP Pavilion 14 Manual

HP

HP Pavilion 14 Manual

HP Presario F700 - Notebook PC Manual

HP

HP Presario F700 - Notebook PC Manual

HP FM972UT#ABA - 4310ST6670 13.3 320/4GB Pc User manual

HP

HP FM972UT#ABA - 4310ST6670 13.3 320/4GB Pc User manual

HP Pavilion dv6-7000 User manual

HP

HP Pavilion dv6-7000 User manual

HP Pavilion dv9000 Manual

HP

HP Pavilion dv9000 Manual

HP 4710s - ProBook - Core 2 Duo 2.53 GHz Manual

HP

HP 4710s - ProBook - Core 2 Duo 2.53 GHz Manual

HP 1035nr - Mini - Atom 1.6 GHz User manual

HP

HP 1035nr - Mini - Atom 1.6 GHz User manual

HP Compaq Presario User manual

HP

HP Compaq Presario User manual

HP OmniBook 5000 User manual

HP

HP OmniBook 5000 User manual

HP Envy 17-3070 User manual

HP

HP Envy 17-3070 User manual

HP MINI 2102 Manual

HP

HP MINI 2102 Manual

HP Mini 110-3131 User manual

HP

HP Mini 110-3131 User manual

HP Laptop User manual

HP

HP Laptop User manual

HP Compaq NW8000 Quick start guide

HP

HP Compaq NW8000 Quick start guide

HP Compaq nx6310 Manual

HP

HP Compaq nx6310 Manual

HP Pavilion dv2000 - Entertainment Notebook PC User manual

HP

HP Pavilion dv2000 - Entertainment Notebook PC User manual

HP Compaq Presario User manual

HP

HP Compaq Presario User manual

HP Officejet 630 User instructions

HP

HP Officejet 630 User instructions

HP ProBook 650 G5 Manual

HP

HP ProBook 650 G5 Manual

Popular Laptop manuals by other brands

Asus G71G - Q2 - Core 2 Quad GHz user manual

Asus

Asus G71G - Q2 - Core 2 Quad GHz user manual

Psion Teklogix Netbook Pro none quick start guide

Psion Teklogix

Psion Teklogix Netbook Pro none quick start guide

Fujitsu Siemens Computers AMILO Pro V3525 Edition datasheet

Fujitsu Siemens Computers

Fujitsu Siemens Computers AMILO Pro V3525 Edition datasheet

Sony VAIO PCG-Z600TEK Software manual

Sony

Sony VAIO PCG-Z600TEK Software manual

Dell Inspiron 5584 Setup and specifications

Dell

Dell Inspiron 5584 Setup and specifications

Toshiba L655D-S5102 Specifications

Toshiba

Toshiba L655D-S5102 Specifications

Fujitsu Siemens Computers AMILO Pro V3205 operating manual

Fujitsu Siemens Computers

Fujitsu Siemens Computers AMILO Pro V3205 operating manual

Sony VAIO VGN-TZ290NAP Specifications

Sony

Sony VAIO VGN-TZ290NAP Specifications

Marson MK8000 Series quick start guide

Marson

Marson MK8000 Series quick start guide

Toshiba A665-S6067 Specifications

Toshiba

Toshiba A665-S6067 Specifications

Sony VPCEA45FX/WI Specifications

Sony

Sony VPCEA45FX/WI Specifications

Sony VAIO PCG-FX290 Service manual

Sony

Sony VAIO PCG-FX290 Service manual

Toshiba C650D-ST5N01 Specifications

Toshiba

Toshiba C650D-ST5N01 Specifications

Dell Precision M4500 Service manual

Dell

Dell Precision M4500 Service manual

Dell Inspiron 600m Setup guide

Dell

Dell Inspiron 600m Setup guide

Lenovo ThinkPad E14 Setup guide

Lenovo

Lenovo ThinkPad E14 Setup guide

Lenovo 1866 - ThinkPad X41 Tablet troubleshooting guide

Lenovo

Lenovo 1866 - ThinkPad X41 Tablet troubleshooting guide

Sony VPCEA43FX/WI Specifications

Sony

Sony VPCEA43FX/WI Specifications

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.