Huawei IPE Series User manual

IPE
V100R001C03SPC200
Installation Guide
Issue
03
Date
2013-02-28
HUAWEI TECHNOLOGIES CO.,LTD

Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
i
Copyright © Huawei TechnologiesCo., Ltd. 2013. All rightsreserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior
written consent of Huawei Technologies Co., Ltd.
Trademarksand Permissions
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd. All other
trademarks and trade names mentioned in this document are the property of their respective holders.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and
the customer. All or part of the products, services and features described in this document may not be
within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,
information, and recommendations in this document are provided "AS IS" without warranties, guarantees
or representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.
Huawei Technologies Co., Ltd.
Address:
Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic of China
Website:
http://enterprise.huawei.com

IPE
Installation Guide
About This Document
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
ii
About This Document
Purpose
This document describes the installation procedure and technical specifications of IP Cameras
(IPCs) of the following models: eSpace IPC1601, eSpace IPC1201-VR, eSpace IPC1602,
eSpace IPC2602, eSpace IPC5602, eSpace IPC2202-VR, eSpace IPC2203-VR, eSpace
IPC5201-VR , eSpace IPC5202-VR, eSpace IPC5603, eSpace IPC1701-VR-VP, eSpace
IPC1701-VF-VP, eSpace IPC2702-VF-VP, eSpace IPC2702-VR-VP, eSpace IPC5702-VR-VP,
eSpace IPC1801-Z36, eSpace IPC1901-Z36, eSpace IPC2802-Z18, eSpace IPC2902-Z18,
eSpace IPC5802-Z20, and eSpace IPC5902-Z20.
Intended Reader
This manual is intended for professional system maintenance or installation engineers.
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol
Description
Indicates a hazard with a high level or medium level of
risk which, if not avoided, could result in death or serious
injury.
Indicates a hazard with a low level of risk which, if not
avoided, could result in minor or moderate injury.
Indicates a potentially hazardous situation that, if not
avoided, could result in equipment damage, data loss,
performance deterioration, or unanticipated results.
Provides a tip that may help you solve a problem or save
time.
Provides additional information to emphasize or
supplement important points in the main text.

IPE
Installation Guide
About This Document
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
iii
Change History
Changes between document issues are cumulative. The latest document issue contains all the
changes made in earlier issues.
Updates in Issue 03 (2013-02-28)
This issue is the third official release. The contents are revised as follows:
Chapter 3 Installing an Infrared Waterproof Tube-Type IPC I
Updated accessories delivered with the device and related descriptions.
Chapter 5 Installing a Vandal-Proof Dome IPC
Updated accessories delivered with the device and related descriptions.
Chapter 6 Installing an Infrared Dome IPC
Updated accessories delivered with the device and related descriptions.
Chapter 7 Installing a Day & Night High Speed Dome IPC
Updated descriptions about accessories delivered with the device..
Updates in Issue 02 (2012-11-30)
This issue is the second official release. The contents are revised as follows:
Chapter 1 Installation Precautions
Add the precautions when installation engineers work at heights.
Chapter 2 Installing the Housing of a Box IPC
Update the procedure for installing the housing of a box IPC and related figures.
Chapter 3 Installing an Infrared Waterproof Tube-Type IPC I
Add the contents about installing an infrared waterproof tube-type IPC I.
Chapter 4 Installing an Infrared Waterproof Tube-Type IPC II
Add the contents about installing an infrared waterproof tube-type IPC II.
Chapter 5 Installing a Vandal-Proof Dome IPC
Update the procedure for installing a vandal-proof dome IPC and related figures.
Chapter 6 Installing an Infrared Dome IPC
Update the procedure for installing an infrared IPC and related figures.
Chapter 7 Installing a Day & Night High Speed Dome IPC
Update the procedure for installing a day & night high speed dome IPC and related figures.
Chapter 8 Installing an Infrared High Speed Dome IPC
Update the procedure for installingan infrared high speed dome IPC and related figures.

IPE
Installation Guide
About This Document
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
iv
Issue 01 (2012-07-15)
This issue is the first official release.

IPE
Installation Guide
Contents
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
v
Contents
About This Document.................................................................................................................... ii
1 Installation Precautions ............................................................................................................... 1
2 Installing the Housing of a Box IPC.......................................................................................... 3
2.1 Installation Preparations ...................................................................................................................................................3
2.2 Installation Mode...............................................................................................................................................................4
2.3 Installation Procedure........................................................................................................................................................4
3 Installing an Infrared Waterproof Tube-Type IPC I.............................................................. 8
3.1 Installation Preparations ...................................................................................................................................................8
3.2 Installation Mode...............................................................................................................................................................9
3.3 Installation Procedure........................................................................................................................................................9
4 Installing an Infrared Waterproof Tube-Type IPC II.......................................................... 13
4.1 Installation Preparations.................................................................................................................................................13
4.2 Installation Mode.............................................................................................................................................................14
4.3 Installation Procedure......................................................................................................................................................14
5 Installing a Vandal-Proof Dome IPC ...................................................................................... 22
5.1 Installation Preparations .................................................................................................................................................22
5.2 Installation Mode.............................................................................................................................................................23
5.2.1 Installing the IPC on the Ceiling.........................................................................................................................24
5.2.2 Installing the IPC on the Wall..............................................................................................................................32
5.2.3 Installing the IPC on a Wall-Mounted Bracket.................................................................................................33
5.2.4 Installing the IPC on a Ceiling-Mounted Bracket............................................................................................38
6 Installing an Infrared Dome IPC ............................................................................................. 44
6.1 Installation Preparations .................................................................................................................................................44
6.2 Installation Mode.............................................................................................................................................................45
6.2.1 Installing the IPC on the Ceiling.........................................................................................................................46
6.2.2 Installing the IPC on the Wall..............................................................................................................................54
6.2.3 Installing the IPC on a Wall-Mounted Bracket.................................................................................................55
6.2.4 Installing the IPC on a Ceiling-Mounted Bracket............................................................................................60
7 Installing a Day & Night High Speed Dome IPC.................................................................66
7.1 Installation Preparations .................................................................................................................................................66

IPE
Installation Guide
Contents
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
vi
7.2 Installation Mode.............................................................................................................................................................67
7.3 Installation Procedure......................................................................................................................................................67
7.3.1 Installing the IPC on the Wall..............................................................................................................................67
7.3.2 Installing the IPC on the Ceiling.........................................................................................................................72
7.3.3 Installing the IPC in Embedded Mode...............................................................................................................74
8 Installing an Infrared High Speed Dome IPC....................................................................... 77
8.1 Installation Preparations .................................................................................................................................................77
8.2 Installation Mode.............................................................................................................................................................78
8.3 Installation Procedure......................................................................................................................................................78
8.3.1 Installing the IPC on the Wall..............................................................................................................................78
8.3.2 Installing the IPC on the Ceiling.........................................................................................................................83

IPE
Installation Guide
1 Installation Precautions
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
1
1 Installation Precautions
Read this chapter carefully before using an IPC and comply with descriptions in this chapter
when using the IPC. Improper use of electrical products may lead to a disaster and serious
injury. To prevent occurrence of accidents, read the following precautions carefully. If you
install the IPC in a public place, post a conspicuous warning signed with the message "You
have entered the area of electronic surveillance."
CAUTION
Products may vary from those you have received. The document is for reference only.
Products are subject to change without notice.
If you need the latest programs and supplementary descriptions, contact the Customer
Service Department of Huawei.
For any problem that occurs on an in-use IPC,contact the vendor or the Customer Service
Department of Huawei in time.
Users are liable for any loss caused by incompliance with instructions in this document.
Basic Requirements
Install the IPC in strict compliance with the requirements of the vendor.
Do not disassemble the IPC by yourself. When the device is faulty, contact an authorized
maintenance center.
No entity or individual is allowed to modify the structure, security, or performance of the
IPC without prior authorization.
When using the IPC,comply with the related laws and regulations and respect the legal
rights of others.
Power Supply Requirements
When using the IPC,comply with the local electrical security standards and uses LPS-
compliant power adapters.
Use accessories delivered with the IPC. The voltage of the power supply must meet the
input voltage requirement of the IPC.

IPE
Installation Guide
1 Installation Precautions
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
2
Before installation is complete, do not power on the IPC. Before inserting or removing
cables to or from the IPC, stop using the IPC and cut off the power supply of the IPC.
Check whether the powersupply is correct before the IPC is put into use.
Ensure that the powersockets are clean and moisture-free to prevent an electric shock or
other dangers.
Important Notice
Prevent the product from being damaged by the heavy weight, serious shock, or water
immersion during transportation, warehousing, and installation of the product. The
warranty does not cover the damage resulting from improper transportation of an
assembled product no matter whether the product is delivered by the contractor or is
returned to the factory for service.
Do not install the IPC upside down. Handle the module with care. Do not squeeze the
mechanical part. Otherwise, mechanical faults may be resulted.
Do not disassemble the IPC without prior approval. The module does notcontain any
part that users can repair by themselves. The IPC must be sent to the professional
maintenance personnel for service.
Do not scratch orwear out the housing of the IPC. Otherwise, the paint that falls off may
cause allergy or an IPC fault. For example, the paint may fall into the module and causes
a shortcircuit.
If an abnormal symptom is detected, for example, smoke comes out of the IPC, the IPC
generates an abnormal sound or smell, stop using the IPC,cut off the power supply, and
remove all cables (including power and networkcables) from the IPC.
When the IPC is faulty, send the IPC to the designated maintenance center for service.
Deploy surge protection devices if the device is installed outside.
When working at heights, use a safe elevator and secure the safety belt, and take
necessary security measures.
Cleaning Tips
Before cleaning the IPC, stop using the IPC,cut off the power supply, and remove all
cables (including power and networkcables) from the IPC.
Use soft and dry cloth to wipe the IPC. To remove stubborn stains, dip a clean and soft
cloth with appropriate neutral detergent and then use the cloth to wipe and dry the IPC.
Do not use volatile solvent (such as alcohol, benzene, or thinner) or alkaline detergent
containing the abrasive to clean the IPC. Otherwise, the coater of the IPC will be
damaged or the operating performance of the IPC will be deteriorated.
Environment Requirements
Protect the IPC against penetration of water or other liquids. If the liquid accidentally
enters the IPC, immediately cut off the power supply and remove all cables (including
power and network cables) from the IPC.
Prevent the product from being damaged by the heavy weight, serious shock, or water
immersion during transportation, warehousing, and installation of the product.
Keep the IPC far away from a heat source or exposed ignition source, such as the electric
heater and candle.
Do not install or use the IPC in the areaswith highly flammable or explosive objects.

IPE
Installation Guide
2 Installing the Housing of a Box IPC
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
3
2 Installing the Housing of a Box IPC
2.1 Installation Preparations
Table 2-1 lists the tools and accessories that may be used during installation. You must
prepare for tools by yourself and obtain the accessories from the packing box of the IPC.
Table 2-1 Installation tools and accessories
Tool
Appearance
Remark
Phillips screwdriver
Prepared by yourself
Claw hammer
Percussion drill
Horizontal ruler
Universal adapter for a
box IPC
Delivered with the IPC
Mounting block

IPE
Installation Guide
2 Installing the Housing of a Box IPC
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
4
Tool
Appearance
Remark
Black cross recessed
round head screw
2.2 Installation Mode
This section describes how to install the box IPC in the shield and fix it to the place required
by the customer. The installation method is simple. For details about the installation procedure,
see the following descriptions.
CAUTION
The wall where the bracket is installed must be able to bear at least three times of the total
weight of the bracket and the IPC.
2.3 Installation Procedure
Step 1 Install the box IPC on the mounting block. Use the Phillips screwdriver to fasten two black
screws onto the IPC, as shown in Figure 2-1.
Figure 2-1 Installing theIPC onto themounting block
Black screw
Mounting block
Step 2 Take out the installation plate from the shield. Adjust the IPC lens so that the front-most end
is 10 mm above the installation plate, as shown in Figure 2-2. Then, use the Phillips
screwdriver to fasten screws of the shield onto the installation plate.

IPE
Installation Guide
2 Installing the Housing of a Box IPC
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
5
Figure 2-2 Installing the box IPC ontothe installation plate
Box IPC
Installation plate
Step 3 Open the locking knob at the back of the housing. Fix the assembled IPC and installation plate
into the shield. It is recommended that the lens be 3 mm away from the glass mirror inside the
shield after the IPC focus is adjusted. Then, use the screws on the shield to fix the installation
plate of the IPC onto the IPC, as shown in Figure 2-3.
Figure 2-3 Installing theIPC and installation plate inside the housing
Housing
Box IPC

IPE
Installation Guide
2 Installing the Housing of a Box IPC
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
6
Step 4 Connect the cable and lead the cable out of the shield through the cable outlet. Close the cover
of the shield and lock the locking knob, as shown in Figure 2-4.
Figure 2-4 Closing and locking the shield
Step 5 Secure the assembled housing onto the bracket using the screws on the housing, as shown in
Figure 2-5.
Figure 2-5 Securing the housing onto the bracket
Step 6 Determine the positions of installation holes based on the installation dimensions of the
bracket and mark the holes. Use a percussion drill bit with a diameter of 8 mm to drill three
holes that are 40 mm deep. Figure 2-6 shows the installation dimensions (in the unit of mm)
of the bracket.

IPE
Installation Guide
2 Installing the Housing of a Box IPC
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
7
Figure 2-6 Installation dimensions of the bracket
Step 7 Drive four expansion bolts into the holes.
Step 8 Install the bracket and housing together in the designated place and fasten threescrews, as
shown in Figure 2-7.
Figure 2-7 Fixing the housing
----End

IPE
Installation Guide
3 Installing an Infrared Waterproof Tube-Type IPC I
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
8
3 Installing an Infrared Waterproof Tube-
Type IPC I
3.1 Installation Preparations
Table 3-1 lists the tools and accessories that may be used during installation. You must
prepare for tools by yourself and obtain the accessories from the packing box of the IPC.
Table 3-1 Installation tools and accessories
Tool
Appearance
Remark
Phillips screwdriver
Prepared by yourself
Claw hammer
Percussion drill
Horizontal ruler
Expansion particle
Delivered with the IPC
Self-tapping screw
L-Wrench

IPE
Installation Guide
3 Installing an Infrared Waterproof Tube-Type IPC I
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
9
Tool
Appearance
Remark
Drill Template
Foam-rubber
Cushion of installing
bracket
Delivered with the IPC
(Optional)
3.2 Installation Mode
The infrared waterproof tube-type IPC I can be installed on the ceiling or wall. You can select
an installation position based on your requirements. If the IPC is installed on a concrete wall,
install the expansion bolts before installing the bracket. (The installation holes of expansion
bolts must be consistent with those of the bracket.) If the IPC is installed on a wooden wall,
start from Step 4 in section 3 3.3 "Installation Procedure" and use self-tapping screws to
directly install the bracket.
CAUTION
The wall where the bracket is installed must be able to bear at least three times of the total
weight of the bracket and the IPC.
3.3 Installation Procedure
Step 1 Stick the positioning label on the wall, as shown in Figure 3-1.

IPE
Installation Guide
3 Installing an Infrared Waterproof Tube-Type IPC I
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
10
Figure 3-1 Sticking the positioning label
Positioning label
Please drill holes at the positions
marked by the red circles.
Step 2 Drill four holes with a diameter of 5.5 mm based on the marks on the positioning label. Drive
the expansion particles into the holes, as shown in Figure 3-2.
Figure 3-2 Installing the expansion particles
Step 3 Mount the IPC on the wall and fasten the screws, as shown in Figure 3-3.

IPE
Installation Guide
3 Installing an Infrared Waterproof Tube-Type IPC I
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
11
NOTE
When the wall is not flat enough, stick sponge sticks on the bracket and install the device.
Figure 3-3 Fixing theIPC
Step 4 Connect the multi-connector cable of the IPC.
Step 5 Adjust the IPC horizontally and vertically so that the IPC faces the monitored area, as shown
in Figure 3-4.
Figure 3-4 Adjusting the monitoring direction of theIPC

IPE
Installation Guide
3 Installing an Infrared Waterproof Tube-Type IPC I
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
12
Step 6 Unscrew the front cone of the IPC. Adjust the lens and check images on the analog monitor
that has been connected in Step 4 until the captured images are clear. Then, lock the lens and
screw the front cone of the IPC.
----End

IPE
Installation Guide
4 Installing an Infrared Waterproof Tube-Type IPC II
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
13
4 Installing an Infrared Waterproof Tube-
Type IPC II
4.1 Installation Preparations
Table 4-1 lists the tools and accessories that may be used during installation. You must
prepare for tools by yourself and obtain the accessories from the packing box of the IPC.
Table 4-1 Installation tools and accessories
Tool
Appearance
Remark
Phillips screwdriver
Prepared by yourself
Claw hammer
Percussion drill
Horizontal ruler
L-Wrench
Delivered with the IPC
Stainless hexagon
screw
This manual suits for next models
21
Table of contents
Other Huawei IP Camera manuals