Husky XS E159503 Installation instructions

®
USE WRENCH ON HOSE NUT ONLY.
TESTING / MAINTENANCE / INSPECTION
XS®w/Mate
Guards
WARNING
INSTALLATION INSTRUCTIONS
IF DRIVE OFF OCCURS
ANY TEST / INSPECTION FAILURE
REQUIRES IMMEDIATE EQUIPMENT
REPLACEMENT OR REMOVAL FROM
SERVICE.
MADE IN THE USA

CAUTION: DO NOT TOP OFF!
ALWAYS ADHERE TO INSTALLATION / USAGE INSTRUCTIONS AND WARNINGS.
WARRANTY
VAPOR PRODUCTS ®
CONVENTIONAL PRODUCTS
GENERAL WARNINGS / INSTRUCTIONS PERTAINING TOA RISK OF FIRE, ELECTRIC
SHOCK OR INJURY TO PERSON:

Nozzle keeps shutting o or won't dispense... 1. Make sure dispenser is on and activated.
2. Slow down ow rate - use lower notch
on clip.
3. Clean spout tip end.
4. Clean or replace lter.
5. Inspect Safe-T-Break®.
6. Replace spout assembly.
7. Check dispenser pressure - 19 psi /
1.3 bar to activate nozzle.
8. Remove nozzle & drain hose.
Nozzle won't shut o... 1. Check ow rate - minimum of 3 gpm /
11.3 Lpm required.
2. Remove nozzle and drain hose.
Nozzle leaks... 1. Check for loose spout.
2. Check hose connection.
3. Check for cracks in nozzle and hose threads.
Low ow rate... 1. Remove Flo-Equalizer® (if equipped).
2. Verify dispenser is not in slow ow rate mode.
3. Check for system leak.
Flow rate above 10 gpm / 37.9 Lpm... 1. Verify Flo-Equalizer® being used - either inside
or outside dispenser.
2. Check Flo-Equalizer® for debris.
Fuel Type Test and warranty for gasoline and diesel fuel
Flow Rate Unleaded w/o Flo-Equalizer® = 14 gpm / 52.9 Lpm
Light Duty Diesel w/o Flo-Equalizer® = 16 gpm / 60.6 Lpm
Body Die cast aluminum
Disc Fluorocarbon
Packing Double O-ring seal protected by ber reinforced Teon®
Lever One piece contoured steel
Shipping Unleaded = 3.1 lbs / 1.4 kg
Weight Light Duty Diesel = 3.1 lbs / 1.4 kg
Threads ¾" / 19.1 mm NPT
Spout Unleaded = 13/16 in / 20.6 mm O.D. Light Duty Diesel = 15/16 in / 23.8 mm O.D.
Case Quantity 15
Listings Default ^ NOT LISTED
TROUBLESHOOTING GUIDE
GENERAL TECHNICAL DATA
Husky Corporation • 2325 Husky Way • Pacic, MO 63069 • Phone: (800) 325-3558 • Fax: (636) 825-7300 • www.husky.com
Page 3 009216-15 10/2019
1. Activate dispenser.
2. Insert spout into ll pipe opening.
3. Lower hose end of nozzle so the spout spring catches
the inside of the ll pipe.
4. Raise the lever and begin fueling.
5. Nozzle will shut o automatically when the tank is full.
6. Wait 15 seconds to allow any fuel remaining in the
spout to drain.
7. Remove nozzle from ll pipe by raising hose end of
the nozzle.
8. Return nozzle to nozzle boot.
NOTE: Nozzle is equipped with a unique Flo-Stop® device that shuts o the
nozzle if it falls from ll pipe or raises above horizontal.
1. Verify nozzle has hold open clip.
2. Verify dispenser is turned o.
3. Place nozzle spout into test can.
4. Pull up lever and latch clip - a small amount of fuel
may ow until the line pressure is relieved.
5. Turn on dispenser and select grade - nozzle should
not dispense fuel.
6. Release the lever.
7. Pull up lever and latch clip - nozzle should dispense
fuel.
8. Turn o dispenser - nozzle should stop dispensing
fuel.
9. Turn dispenser on and select grade - nozzle should
not dispense fuel.
NOTE: The no pressure / no ow device fullls the NFPA Code 30A
requirement regarding self-service nozzles with a hold open latch. If nozzle
fails item #5 or #9, verify dispenser is not allowing constant pressure to the
hose. If dispenser tests OK, replace nozzle.
OPERATION INSTRUCTIONS
PRESSURE ACTIVATION TEST INSTRUCTIONS

FLO-EQUALIZER®INSTALLATION INSTRUCTIONS
Model 004490 Conventional Flo-Equalizer®
1. Turn o dispenser and relieve line pressure.
2. Install pipe nipple (if necessary) to achieve proper
ow direction.
3. Use thread sealant on male threads -- DO NOT
use Teon tape.
4. Tighten approximately ½ turn past hand tight - do
not overtighten.
5. Conrm nozzle is properly installed, pressurize
the system and check for leaks.
NOTE: In the event of pressure dierential in excess of 25 psi / 1.7 bar across
the Flo-Equalizer® or the presence of debris obstructing movement of
internal components, the Flo-Equalizer® output may exceed 10 gpm /
37.9 Lpm.
SPOUT REPLACEMENT INSTRUCTIONS
Model 001471 Light Duty Diesel Spout Assembly,
001473 Unleaded Spout Assembly
1. Remove spout lock nut and spout.
2. Remove and discard spout seal.
3. Place new spout seal in groove.
4. Insert new spout into body making sure the vent
tube is in the port.
5. While holding the spout in proper alignment,
tighten spout lock nut rmly, approximately 35 - 60
lbf•ft / 47 - 81 N•m. Do not overtighten.
GUARD REPLACEMENT INSTRUCTIONS
EASY-ON MATE GUARD
Model 003795
1. Remove old guard from nozzle.
2. Install new guard over spout and pull back.
POPD®MATE GUARD
Model 007815
1. Turn o dispenser and relieve line pressure.
2. Remove wae splash guard (if applicable).
3. Remove old nozzle guard.
4. Install new POPD® mate guard over spout and pull
back.
5. Install desired advertisement and clear cover
(model 006628).
FLUTED HANDLE COVER
Model 003376
1. Remove old handle cover.
2. Snap new handle cover into place.
WAFFLE SPLASH GUARD
Model 001808
1. Remove old wae splash guard.
2. Install new wae splash guard over spout lock nut.
POPD®CLEAR COVER
Model 006628
1. Trim advertisement to 3.75 in / 95.25 mm x 3.75 in
/ 95.25 mm.
2. Notch corners of advertisement approximately .375
in / 9.5 mm x .375 in / 9.5 mm.
3. Turn clear cover "inside out".
4. Center advertisement on POPD® guard, using
the notched corners as guides, and fold over the
edges.
5. Lay clear cover over advertisement, making sure
the advertisement stays centered, and turn it "right
side out".
6. Conrm the cover is securely in place.
Husky Corporation • 2325 Husky Way • Pacic, MO 63069 • Phone: (800) 325-3558 • Fax: (636) 825-7300 • www.husky.com
Page 4 009216-15 10/2019
HOLD OPEN CLIP INSTALLATION / REMOVAL INSTRUCTIONS
Model 003593 Hold Open Clip Kit
INSTALLATION
1. Remove nozzle from hose and drain.
2. Position latch spring under latch clip and hold
them in place. The latch clip should straddle the
mating holes in the trigger lever.
3. Insert latch rivet through latch clip and lever,
making sure latch spring is secured in position by
the rivet.
4. Install push nut on rivet - DO NOT hammer in
place.
5. Squeeze lever several times to check operation.
6. Verify clip and lever are parallel.
NOTE: Field installation of the hold open clip is NOT UL approved because
improper installation may cause the nozzle to fail.
REMOVAL
1. Remove nozzle from hose and drain.
2. Place nozzle on a at surface in safe location.
3. Hold up on the latch clip to prevent rivet from
rotating.
4. Drill o the riveted end using a ¼" / 6.4 mm bit.
5. Do not remove latch plate.
NOTE: Nozzles can be ordered without clips.
ACCESSORIES
Model 000397 Unleaded spout gauge
This manual suits for next models
9
Table of contents