manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. i-MO
  6. •
  7. DC Drive
  8. •
  9. i-MO Jaguar VXT User manual

i-MO Jaguar VXT User manual

Other i-MO DC Drive manuals

i-MO HD1-E-COP User manual

i-MO

i-MO HD1-E-COP User manual

i-MO HD2-3.7A-43 User manual

i-MO

i-MO HD2-3.7A-43 User manual

i-MO SD1 Series User manual

i-MO

i-MO SD1 Series User manual

i-MO SD1-2.5A-21 User manual

i-MO

i-MO SD1-2.5A-21 User manual

i-MO WD-L User manual

i-MO

i-MO WD-L User manual

Popular DC Drive manuals by other brands

National Instruments NI MID-7604 user guide

National Instruments

National Instruments NI MID-7604 user guide

SOMFY Maestria WT Series instructions

SOMFY

SOMFY Maestria WT Series instructions

Danfoss VLT HVAC Design guide

Danfoss

Danfoss VLT HVAC Design guide

Trane TR150 Service manual

Trane

Trane TR150 Service manual

Chamberlain Garog D Series operating manual

Chamberlain Garog

Chamberlain Garog D Series operating manual

Parker PDS Series user guide

Parker

Parker PDS Series user guide

Binks QS-5012-1-CE Service manual

Binks

Binks QS-5012-1-CE Service manual

Danfoss VLT 2800 Series Quick setup

Danfoss

Danfoss VLT 2800 Series Quick setup

YASKAWA CANopen SI-S3 Technical manual

YASKAWA

YASKAWA CANopen SI-S3 Technical manual

GE D20A6 instructions

GE

GE D20A6 instructions

Danfoss VLT AQUA Drive FC 202 operating manual

Danfoss

Danfoss VLT AQUA Drive FC 202 operating manual

Lenze PositionServo 940 user manual

Lenze

Lenze PositionServo 940 user manual

Unex MC-D-250-1000-050W-TW operating manual

Unex

Unex MC-D-250-1000-050W-TW operating manual

Geckodrive G213V manual

Geckodrive

Geckodrive G213V manual

ABB RSYC-01 user manual

ABB

ABB RSYC-01 user manual

Rockwell Automation PowerFlex 700S Programming manual

Rockwell Automation

Rockwell Automation PowerFlex 700S Programming manual

WEG DeviceNet CFW500 user manual

WEG

WEG DeviceNet CFW500 user manual

Siemens SINAMICS G List manual

Siemens

Siemens SINAMICS G List manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

Instruction Manual
Option Attachment “OPC-E2-ADP1”
CAUTION
• Please read and ensure a proper understanding of this manual before installing, connecting (wiring), operating, or conducting
maintenance and inspection of the interface option.
• Improper handling might result in incorrect operation, a short life, or even a failure of this product as well as the motor.
• Deliver this manual to the end user of this product. The end user should store this instruction manual safely until suc time as
the product is disposed of.
(8) Tighten with tapping screws *1
Tightening torque: 0.25Nm *2
*1
*2
The attachment will be temporarily secured with the clips on
the case, however, it must be secured properly with the tapping
screws before performing operation.
The tapping screws may be deformed or damaged if tightened
with more than the specied amount of torque.
Front view of screw tightening locations
(9) Align the option card with the protrusion (11) Tighten the board securing screws (provided with
the option card). Tightening torque: 0.7Nm
(13)
Push the option card down
in the direction
Protrusion
(10)
(12) (14)
(15) Attachment
installation
complete
Part A
Use the screw (M3 x 6) provided to connect the ground wire to
Tightening torque: 0.7Nm Recommended ground wire size: AWG 20 to 16 (0.5 to 1.5mm2)
Part A
Note If removing the attachment, always disconnect one side of the harness connector beforehand.
Note Always connect the attachment ground wire to the inverter ground to ground the inverter also.
IMO Precision Controls Ltd
1000 North Circular Road, London NW2 7JP, United Kingdom
Tel: +44 (0)20 8452 6444 Email: [email protected] Web: www.imopc.com
Installation procedure (Example using option card OPC-DIO)
Press the indented locations (indicated
with à) to release the lock, allowing the
cover to be opened.
Step (2) details
(1) Remove the bottom cover (2) Open the top cover
(3) Remove the touch panel
(5) Pass the harness
through to the inside
of the attachment
(4) Connect the harness to the
inverter connector
(larger side of the connector)
(6) Attach the
attachment to
the inverter
(6)
(6)
(6)
(7) Connect the connector on the
opposite end of the harness to
the attachment connector
Note Ensure that all connectors have been inserted fully and are locked.
Thank you for purchasing the option attachment “OPC-E2-ADP1”
The use of this option attachment allows the Jaguar VXT series to be equipped with option cards (sold seperately).
1.Product Check
Please check the following before using the product
(4) Check the model on the nameplate and ensure that
the product is the same as ordered.
(5) Ensure that the package contains both the attachment
and accessories.
(6) Ensure that neither the attachment nor the
accessories have su󰀨ered damage such as breakage
or denting during transport.
(7) Refer to the “1.1 Product Conguration” diagram on
the right for details of the nameplate attachment
location and accessories.
Attachment
Nameplate
Harness Tapping screw
(M3 x 14)
2
Screw
(M3 x 6)
1
1.1 Product Conguration
If anything is out of place, or the product appears to be
defective, contact IMO.
2.Specications
The applicable scope for this product is as follows:-
(1) Applicable models
(2) No. of installable option cards: 1
Series Name Inverter Capacity
Jaguar VXT VXT-4A-2 / 2E ~ VXT-20A-2 / 2E
VXT-2A-4 / 4E ~ VXT-44A-4 / 4E
VXT-3A-1 / 1E ~ VXT-11A-1 / 1E
3.Installation Method
WARNING
Please wait at least 5 minutes after inverter power has been turned OFF before attempting installation and wiring.
Also, ensure that the touch panel LEDs are OFF, and use a tester to conrm that the DC intermediate circuit voltage across main
circuit terminals P(+) and N(-) has dropped to a stable value (+25 VDC or lower).
Risk of electric shock
Note Wire the inverter main circuit terminals and control circuit terminals before installing this attachment.
STEP 1 First, wire the inverter main circuit terminals and control circuit terminals
STEP 2 Follow the installation procedure on the next page to install the attachment
STEP 3 Install the option card
STEP 4 Wire the option card to the attachment ground wire and option card terminals
Note Secure the wiring near the inverter to prevent the weight of the wiring being applied to the option card.