
8M3x6
STEP 3:
()
Pumps in Series
,,。
()
STEP 1:
。 ()
STEP 2:
()Plug
()
plate
()Screw M3x6
M3x6
(O-ring)
(O-ring)
(O-ring)
(Acrylic board)
(Front panel)
()Screw M3x12
M3x12 ()Screw M3x10
M3x10
()Reflector ()Screw M3x8
M3x8
()Plug
()Plug
(O-ring)
(Clear Window)
(Front panel)
()Screw M3x12
M3x12
()Screw M3x10
M3x10
(Pump1)
1
(Pump2)
2
(In)
(Out)
()Plug
(Pump1)
1
(Pump2)
2
(In)
(Out)
()Plug
()
Parallel / Relay Pump
()
Parallel Pump
()
Relay Pump
Pump1Pump2 Pump1Pump2 Pump1Pump2
,。 ()
STEP 3:
2。
()
STEP 4:
12。
STEP 5:
。
STEP 6:
()Screw M3x6
M3x6
,,。
STEP 3:
()Plug
Remove both plates and stop plugs from reservoir as
shown bellow, then install bottom plates back.
(Caution: O-ring may come off)
Remove front panel and acrylic board.
(Caution: O-ring may come off)
Remove two reflector and fasten 1 plug as shown.
(Do not discard reflector) Reverse STEP 2 for assembly. Make sure all o-rings are
placed at correct places.
Pump 1 and 2 inseries mode 1. Pump 1 and 2 inseries mode 2.
Fasten reservoir to 5.25” bays with M3x6 screws provided. When loop(s) completed, remove stop plug from
front panel and fill loop.
Installing The Reservoirs ()
()Reservoirs
()Pump cover
()Pump
(O-ring)
()Screw M4x10
M4x10
()
Installing The Pump
。
STEP 1:
(O-ring)
,(M4x10)
STEP 2:
(Pump1)
1
(Pump2)
2
()Loop 1
1
()Loop 2
2
,,。
()
STEP 1:
()Plug
()
Plate
()Screw M3x6
M3x6
12。
STEP 2:
(/) !"#
Pumps in Parallel/Default
(O-ring)
()Plug
(O-ring)
。
STEP 1:
,。
STEP 2:
()Panel
Attach provided o-ring to pump. Attach pumps and covers to reservoir,
then fasten screws(M4x10) in cross pattern.
Open the of the , install the two
plugs,Install two backplanes.( the may fall off)
two bottom plates
Note: O-ring
reservoirs
Loop 1 and Loop 2 are parallel operated.
Remove two 5.25” drive bay covers if applicable. Slide reservoir horizontally into chassis from front,
Align reservoir front panel flush with chassis panel.