
INSTALLATION INSTRUCTIONS
IMPORTANT: Read all instructions before performing any work. Be sure all
power is off prior to installing luminaire.
WARNING: Luminaire must be grounded in accordance with appropriate
codes. Failure to do so may result in serious injury.
Corona CX 5/14/2013
Corona Linear Flood Mounting Installation Instructions
Linear Flood Mount
For installation the Corona using a Linear Flood Mount
system the following instructions should be followed by a
qualified Electrician
4. Next install 4” round junction box to a preformed
concrete base using concrete fasteners (supplied by
others).
5. Feed wires through gasket and attach to base.
Concrete Fasteners &
Junction Box
(Supplied By Others)
© 2013 Illumitex Inc. All rights reserved. The information in this document is subject to change without prior notice.
Illumitex Inc. | 5307 Industrial Oaks Blvd., Ste. 100 | Austin, TX 78735 USA | +1 512 279 5020 | www.illumitex.com
½”Rigid Conduit Stem
6. Wire the input wires to the line voltage wires coming.
Follow the standard color wire scheme. Gel filled wire
nuts are recommended .
7. Mount Corona’s base to the 4” round junction box using
the screws provided to base, feed wires. Tighten screws
to 12 ft/lbs.
8. Loosen hex end bolt and adjust the angle.
9. Power ON the Corona and ensure that all LEDs light.
Black = 120-277 VAC
White = eutral/Common
Green = Ground
Fasteners
Gasket