manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. IMI Hydronic
  6. •
  7. Industrial Equipment
  8. •
  9. IMI Hydronic Pleno Connect PI 9 Instruction sheet

IMI Hydronic Pleno Connect PI 9 Instruction sheet

SAFETY – INSPECTION – DISASSEMBLING – DISPOSAL prescriptions
Compresso
Transfero
Vento
Pleno
Rell
SAFETY – INSPECTION
•••••Personnel
Installing and operating personnel must possess the appropriate knowledge and training.
•••••Follow the instructions
Installation, operation, maintenance and disassembly must be carried out as stated and showed in the di󰀨erent instruction
manualsmaking integral part of the delivery and in accordance with best practice. In addition to the IMI Hydronic Engineering
instructions, additional instructions from other companies may be included for the components used (e.g. backow preventers)
.
Youmust follow these instructions in the same way as the IMI Hydronic Engineering instructions.
Ifanything is unclear, please contact IMI Hydronic Engineering customer service.
•••••Testsfor commissioning and periodic inspections
Testrequired for commissioning and periodic inspections must be performed according to the regulations in the country
where the device is installed and operated. There are no unied international regulations for the acceptance test prior to
commissioning and periodic inspections. It is usually the vessels that determine how the installation is classied.
These are CE type-tested in accordance with guideline PED/2014/68/EU for pressurised equipments. Forperiodic
inspections, openings are provided for ange-type or endoscope inspections.
•In Switzerland, Compresso does not require autorisation from the SVTI if the installation is protected in such a way that
psCH is not exceeded. Vesselswith psv x V up to 3000 bar*litres do not require inspection by the SVTI.
Following combinations withTecBox are recommended:
Primary vessel (2) TecBoxsafety valve (SV)
C 10 C15
≤ 1000 litres 3 bar on request
≤ 800 litres 3.75 bar on request
≤ 700 litres 4.2 bar on request
≤ 600 litres 5 bar on request
≤ 500 litres 6 bar 6 bar
≤ 300 litres – 10 bar
•ForTransfero as many extension vessels as required can be connected to the primary vessel. The CE-approved 2 bar
safety valve protects the vessels from inadmissible pressures. In Switzerland, SVTI inspection is not required for these
types of vessels.
•Backow preventer BA: Perform inspection and maintenance in accordance with EN 1717 and the rules in the operator’s
country. Functional testing, with documentation, must normally be carried out annually. Dirt trap (SF): Inspect and clean if
necessary after a drop in the water make-up capacity or before functional testing of the backow preventer BA. We recommend
including the Pleno P / P R / P CR / BA4R in the maintenance cycle of the connected pressure-maintaining or degassing station.
Follow the maintenance instructions for Rell softening modules. The Pleno P / P R / P CR / BA4R can work as an accessory in
systems requiring technical inspections (Compresso | Transfero) and can be included as part of the inspection.
•••••Place of installation
The access to the place of installation must be restricted to trained and specialised personnel. The oor statics must be able
to support the maximum operating and installation conditions. Connections for electricity,communication, main water and
waste water must correspond to the requirements of the device.The room must be thouroughly ventilated. Do not store
ammable, explosive materials near the pressure vessel. Pressurized containers (eg Compresso expansion vessels) must
be protected against external re, at least according to national regulations.
•••••Waterquality
IMI Hydronic Engineering devices are designed to maintain pressure, to degass or to make-up and/or treat water in closed
heating, solar and cooling systems with water that contains no aggressive or toxic agents.The entire system must be
dimensioned and operated in such a way as to minimise the amount of oxygen admitted through the make-up water or
through permeable components. Water treatment systems are to be dimensioned, installed and operated according to the
current state of the art.
•••• Electrical connection
The electrical and the communication wiring and connections should be carried out by a qualied electrician, in accordance
with current local regulations.The devices and the potential free outputs must be disconnected from the electrical supply
before working on electrical components.
Protection on the supply to be done by the contractor:
Compresso C2.1, C10.1; C10.2; C15; CX: 10 A
Compresso C15.2: 16 A
Transfero range 4, 6, 8, 10, 14 = 1 x 230 V: T.1: 10 A
T.2: 16 A
Transfero 19, 25 = 3 x 400 V: 10 A
Vento range 2, 4, 6, 8, 10, 14 = 1 x 230V: 10 A
Vento range 19, 25 = 3 x 400 V: 10 A
Pleno PI9.1; PI6.1; PIX: 10 A
Pleno PI9.2; PI6.2: 16 A
Pleno P BA4R: not applicable
Residual current device (RCD) following local regulation.
If installed in residential building we recommend a commercially available line lter to the junction box.
WXMOIN00001
07.2019
en
de
fr
nl

12060000365
07.2019
Pleno Connect
PI 9, PI 9F
INSTALL
www.imi-hydronic.com
All manuals and user guides at all-guides.com
2
( ~1200 )
460
Ø
12
60
70
Ø
8,5
Ø
18
460
1
2
80
Accessory
Kit
4
1
2
3
1
2
3
PI 9.1 F
All manuals and user guides at all-guides.com
3
1
2
3
4
5
1
2
PI 9.1 / PI 9.2
All manuals and user guides at all-guides.com
4
≥400
+5°C - +40°C
1x230V
≥400
DF
≥ 2 cm/m
Sof
DF
Sof
≥600
+5°C - +40°C
1x230V
≥400 ≥ 2 cm/m
DF
Sof
PI 9.1 F
PI 9.1 / PI 9.2
All manuals and user guides at all-guides.com
5
PI 9.1 F
Swm
P1
Pleno Refill
Sout
Pleno PI 9.1F
PT
SYS
LS
SFwm
SoutSin
Sofs
Sof
Sin
Swm
Sout
Swm Sout
dpu min bar 1 0,0
dpu max bar 9,0 8,0
Ts min °C 0 0
Ts max °C 30 30
Optional
Sof
All manuals and user guides at all-guides.com
6
Sout
Optional
Swm
P2
P1 SoutSin
Pleno P AB5R
Sout
Pleno PI .1.2
PT
SYS
PI .2
LS
SFwm Sofs
Sof
Pleno Refill
External
Tank
LS
EN 1717
Sin
Swm
Swm Sout
dpu min bar 1 0,0
dpu max bar 9,0 8,0
Swm Sout
Ts min °C 0 0
Ts max °C 30 30
Swm
Sout
Pleno PI 9.1 + Pleno P AB5R
PI 9.1 / PI 9.2
Pleno PI 9.2 + Pleno P AB5R
**
Sof Sof
* optional
Pleno P AB5R
All manuals and user guides at all-guides.com
7
Pleno PI 9.1 F
+
Pleno Rell
tr > 0 °C
Pleno PI 9.1 / 9.2
+
ext. tank
DNe
DN DNet
L max 5 m 20 20
L max 20 m 25 25
L max 30 m 32 32
tR
Q
psvs
Hs
t
P
ZUT
tmax
DSV...DGH
Zeparo G Force
Sout
pw 1 - 9 bar
tw 5 - 30 °C
Pleno
PI 9.1 F
TecBox
Statico
Compresso
Transfero
Swm
DN
tR
Q
psvs
Hs
t
P
ZUT
tmax
DSV...DGH
Zeparo G Force
Statico
Compresso
Transfero
Pleno
PI 9.1 / 9.2
TecBox
external tank
(option for AB5)
DN
Sout
DNet LS
All manuals and user guides at all-guides.com
8
230V/50 Hz
PI.1: 10A / 3 x 1,0 mm²
PI.2: 16A / 3 x 1,5 mm²
5
1 2
LPE
N
LPE
N
34
6
1!
BrainCube
Connect!
#1-5
www.imi-hydronic.com
All manuals and user guides at all-guides.com
9
Pleno PI 9.1 (F) / PI 9.2
230V/50 Hz
All manuals and user guides at all-guides.com
10
Pleno PI 9.1 (F) / PI 9.2
24V
All manuals and user guides at all-guides.com
11
P
umpe 1 Sicherung F20
0
1
0 AT / T
y
p: 5
x
20
q
NPN
S
HIEL
D
S
HIEL
D
R
S 485
US
B
RS
458
L
AN
/
E
t
he
rn
e
t
A B
S
A‘ B‘
S
IN OU
T
Jumper (RS485)
o
ff
=
Off
en
/
stationne‘
/
ope
n
on =
G
esteckt
/
branche‘
/
connect
G
ND
IN
G
ND
IN
G
ND
+
I
N
A B
S
A‘ B‘
S
ID6 ID5 IDA3
q
NP
N
S
HIEL
D
S
HIEL
D
RS
485
ID6 ID5 IDA3
US
B
RS458
LAN
/
E
t
he
rn
e
t
A B
S
A‘ B‘
S
IN OU
T
Jumper (RS485)
off = Offen / stationne‘ / o
p
en
on = Gesteckt / branche‘ / connect
GND
IN
GND
IN
G
ND
+
IN
A B
S
A‘ B‘
S
M
1
~
LINE P/C1 V
1
V
3
V
4
WM V2 P
/C
2OD1OD2
O
D3 OD
4
L
N
PE
L
N
PE
L
N
PE
13 14 13 14 13 14
Klemmen Aus
f
ührung
C
V
ersion des bornes
C
T
e
rmin
a
l
e
x
ecu
ti
o
n
C
230
V 5
0
Hz
F2
0
1
S
icherung
/
f
usible
/
f
use
1
0 A
/
250V
/
5x20
Pleno PI Connect
Pleno PI
Connect
Pleno PI
Connect
Compresso
Compresso
Compresso
Connect
All manuals and user guides at all-guides.com
12
www.imi-hydronic.com
We reserve the right to introduce technical alterations without prior notice.
All manuals and user guides at all-guides.com

This manual suits for next models

1

Popular Industrial Equipment manuals by other brands

ABB HT575462 Operation manual

ABB

ABB HT575462 Operation manual

R. Beck Maschinenbau EXAKT NC operating manual

R. Beck Maschinenbau

R. Beck Maschinenbau EXAKT NC operating manual

Eaton Char-Lynn HP30 instruction manual

Eaton

Eaton Char-Lynn HP30 instruction manual

Somat SPC-60 Series Service training manual

Somat

Somat SPC-60 Series Service training manual

ABB XAC25291 Operation manual

ABB

ABB XAC25291 Operation manual

Meler Micron PUR LC instruction manual

Meler

Meler Micron PUR LC instruction manual

eks FIMP-EX manual

eks

eks FIMP-EX manual

Getz Equipment Innovators 3G0038 quick start guide

Getz Equipment Innovators

Getz Equipment Innovators 3G0038 quick start guide

Sentry Saf-T-Vise STV-HP3 Installation, operation & maintenance manual

Sentry

Sentry Saf-T-Vise STV-HP3 Installation, operation & maintenance manual

Siemens SENTRON VL operating instructions

Siemens

Siemens SENTRON VL operating instructions

Denray 3648G operating instructions

Denray

Denray 3648G operating instructions

Voltaire HTC Series Installation, operation and maintenance manual

Voltaire

Voltaire HTC Series Installation, operation and maintenance manual

Pack Leader PL-622 Operational manual

Pack Leader

Pack Leader PL-622 Operational manual

HBM HLCM Series Mounting instructions

HBM

HBM HLCM Series Mounting instructions

YATO YT-7292 MANUAL ORIGINAL

YATO

YATO YT-7292 MANUAL ORIGINAL

Vestil MTC-PNU-55 instruction manual

Vestil

Vestil MTC-PNU-55 instruction manual

Panasonic SF4C Series instruction manual

Panasonic

Panasonic SF4C Series instruction manual

Eaton AM-4.16-GT Instruction book

Eaton

Eaton AM-4.16-GT Instruction book

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.