
IV. INSTALLATION OF A LUMINAIRE IN THE FRAME
BASE / MONTAŻ OPRAWY W PODSTAWIE RAM I
V. INSTALLATION OF THE FRONT PART OF THE
FRAME / MONTAŻ PRZEDNIEJ CZĘŚCI RAM I
FIX THE FRAME BASE (PART B) TO THE
BAC PART OF THE LUMINAIRE’S
HOUSING BY MEANS OF FOUR 3X8
SCREWS (PART G, IN THE SET)) /
PRZYMOCUJ PODSTAWĘ RAM I (CZĘŚĆ
B) DO TYLNEJ CZĘŚCI OBUDOWY
OPRAWY ZA POMOCĄ CZTERECH
W RĘTÓW 3X8 (CZĘŚĆ G, W ZESTAWIE)
Ø3x8
Ø3x8
1. FIX THE FRONT PART OF THE FRAME (PART A)
TO THE LUMINAIRE BY MEANS OF FOUR M3X6
SCREWS (PART E, IN THE SET) /
PRZYMOCUJ PRZEDNIĄ CZĘŚĆ RAM I (CZĘŚĆ A)
DO OPRAWY ZA POMOCĄ CZTERECH W RĘTÓW
M3X6 (CZĘŚĆ E, W ZESTAWIE)
2. THEN SCREW IN SLIGHTLY TWO M4X6
SCREWS (PART F, IN THE SET) /
NASTĘPNIE W RĘĆ LE O DWA W RĘTY
M4X6 (CZĘŚĆ F, W ZESTAWIE)
M3x6
M3x6
M3x6
M3x6
M4x6
M4x6
VI. INSTALLATION OF THE READY IP66/67
ASSEMBLED IT ON THE WALL BRAC ET /
MONTAŻ GOTOWEGO ZMONTOWANEGO
ZESTAWU IP66/67 NA LAMRZE ŚCIENNEJ
1. PUT THE READY IP66/67 IT ON THE WALL BRAC ET SO THAT
SCREWS M4X6 (PART F) CAN HOO THE HOLES IN THE BRAC ET /
POŁÓŻ GOTOWY ZESTAW IP66/67 NA LAMRZE ŚCIENNEJ TA , ABY
W RĘTY M4X6 ZAHACZYŁY O OTWORY W LAMRZE
2. THEN SCREW THE SCREWS (F) FIRMLY /
NASTĘPNIE DO RĘĆ MOCNO W RĘTY (F)