
INSTALLATION INSTRUCTIONS
BAG INSTALLATION: 05150 IRON RIDER MESSENGER BAG
142664- 9/15
dowcopowersports.com – (800) 558-775
2. INSTALLATION CONTINUED
▶ Open horizontal Velcoro straps on the rear of the bag (Fig 2)
▶ Place bag on luggage rack or passenger seat.
▶ Loop Velcro straps around sissy bar/backrest in a way that is secure.
▶ Lace tie-down straps around backrest post and re-attach them using the qick release buckles.
▶ Pull straps until tight and custom cut or secure excess strap to avoid straps getting entangled in any moving parts.
▶ Make sure the straps ar not cut too short, burn cut ends to avoid fraying.
▶ Tie-downs suhould be hooked independently on each side. (Fig 2)
2. INSTALLATION MLS BAG ATTACHMENT
▶ The Messenger Bag can also be attached to our Iron Rider MLS bags, with the included G-hook buckles.
▶ Hook G-hooks in to two web loops on the back of the bag and two on the bottom. (Fig 3)
▶ Lay the Messenger Bag on top of the Iron Rider MLS bag and clip the J-hooks in to the upper D-rings on the MLS bag. (Fig 4)
▶ Pull straps until tight and custom cut or secure excess strap to avoid straps getting entangled in any moving parts.
FIG. 3 FIG. 4