
5.3.3 Securing the pump unit.................................................................. 31
5.4 Mounting the pump unit without foundation...................................... 32
5.5 Aligning the pump unit...................................................................... 32
5.5.1 Determining alignment tolerances................................................. 32
5.5.2 Pump alignment tolerances........................................................... 33
5.5.3 Taking into account peak height changes..................................... 35
5.5.4 Checking the coupling alignment................................................... 37
5.5.5 Aligning the motor.......................................................................... 38
5.5.6 Fitting the coupling guard.............................................................. 39
5.6 Planning pipes.................................................................................. 39
5.6.1 Configuring supports and flange connections............................... 39
5.6.2 Determining nominal widths.......................................................... 39
5.6.3 Determining pipeline lengths......................................................... 40
5.6.4 Optimising cross sectional and direction changes......................... 40
5.6.5 Avoiding overpressure................................................................... 40
5.6.6 Including safety and control equipment......................................... 41
5.6.7 Using hose lines............................................................................ 43
5.7 Connecting pipelines........................................................................ 43
5.7.1 Avoid contamination of the pipes................................................... 44
5.7.2 Install auxiliary pipes..................................................................... 44
5.7.3 Install inlet line............................................................................... 44
5.7.4 Install the outlet line....................................................................... 44
5.7.5 Fitting the heating line (optional)................................................... 44
5.7.6 Check that pipe connection is tension free.................................... 45
5.8 Electrical connection......................................................................... 45
5.8.1 Earth the pump.............................................................................. 45
5.8.2 Connect the motor......................................................................... 45
5.8.3 Checking the direction of rotation.................................................. 46
5.8.4 Connecting the instrumentation..................................................... 46
6 Operation................................................................................................. 47
6.1 Performing initial commissioning...................................................... 47
6.1.1 Determining the pump type........................................................... 47
6.1.2 Commissioning after shutdown..................................................... 48
6.1.3 Removing preservative.................................................................. 48
6.1.4 Lubricating bearings/gears............................................................ 48
6.1.5 Preparing auxiliary operating systems (if present)........................ 48
6.1.6 Inertisation (for ATEX)................................................................... 49
6.1.7 Filling and bleeding........................................................................ 50
6.1.8 Switching on.................................................................................. 51
6.1.9 Switching off.................................................................................. 53
6.2 Operation.......................................................................................... 53
6.2.1 Preparing for operation.................................................................. 53
6.2.2 Switching on.................................................................................. 53
6.2.3 Switching off.................................................................................. 55
6.3 Cleaning/sterilizing the pump........................................................... 55
6.3.1 CIP cleaning/sterilising at CIP temperature below 80 °C.............. 56
6.3.2 CIP cleaning/sterilising at CIP temperature above 80 °C and
pump with sealing system or quench system................................ 56
6.3.3 CIP cleaning/sterilising at CIP temperature above 80 °C and
pump without sealing system, without quench system.................. 56
6.3.4 Mechanically cleaning/sterilising................................................... 57
6.4 Putting out of operation.................................................................... 58
Table of contents
4Type SLH-4G 03/2020 JPB Rev. 6