Jacksons Fencing Wheelie Bin Store Instruction sheet

Jacksons Fencing Head Office, Stowting Common, Ashford, Kent, TN25 6BN
+44 (0) 1233 750393 | www.jacksons-fencing.co.uk |info@jacksons-fencing.co.uk
DRB approved (ACT) 28/03/2019 JFW 40 Issue 08 Page 1 of 9
How to Install a Wheelie Bin Store
Thank you for choosing Jacksons Fencing. Our high quality fencing products will last for years
and give you trouble-free service if you follow the installation instructions below, which are
offered as a general guide. Read the instructions fully before starting assembly especially if
additional bin is to be assembled as well.
PLEASE NOTE: THE WHEELIE BIN STORE IS DESIGNED TO CONCEAL VARIOUS RECYCLING
BINS. IT IS NOT DESIGNED TO BE WATERPROOF. PLEASE TAKE THIS INTO ACCOUNT IF THE
INTENTION IS TO USE THIS STORE FOR OTHER PURPOSES.
Tools required:
Drill / Screw Driver Level Tape Measure 19mm Spanner
Assembly Parts List (For Standard Wheelie Bin Store)
PARTS LIST
S# Description Qty
Timber Components
1 Back Panel 01
2 Left Hand Side Panel 01
3 Right Hand Side Panel 01
4 Left Hand Door 01
5 Right Hand Door 01
6 Left Hand Top Cover 01
7 Right Hand Top Cover 01
Metal Components
8 Tie Bar (Top) 01
9 Tie Bar (Bottom) 01
10 Door Handles 02
11 Door Latches 02
Fittings & Tools
12 M5 x 90mm Screws 06
13 M4 x 25mm Screws 24
14 Screw Caps 02
15 M5 x 45mm Screws 06
16 M4 x 40mm Screws 02
17 M4 x 25mm Screws 08
18 T25 Drive Bit 01
19 Pozi Drive Bit 01
Label
(For Timber Components)
Tie Bar
Bottom
Pozi Drive Bit
Door Latches
Door Handles +
Fixings
Note: All timber components are labelled.
Labels are attached to the Top End of each
component e.g. the following picture shows a
Left Hand Door with label attached to top of
the Door.
Tie Bar
Top
T25 Drive Bit

Jacksons Fencing Head Office, Stowting Common, Ashford, Kent, TN25 6BN
+44 (0) 1233 750393 | www.jacksons-fencing.co.uk |info@jacksons-fencing.co.uk
DRB approved (ACT) 28/03/2019 JFW 40 Issue 08 Page 2 of 9
Assembly Instructions:
Note: It is important to note that assembling a Wheelie Bin Store is a two person operation. The Wheelie
Bin Store must be assembled on a FLAT SURFACE to make sure it is square when assembled. It is also
important to note that if an Additional Bin Store is to be assembled with Standard Wheelie Bin Store, the
Right Hand Top Cover provided with Standard Bin Store is to be exchanged with the Additional Bin Sore
Top Cover to give same overhang on each side.
Step 1: Check that all the assembly parts and fittings are provided as stated above. Read and understand
the instructions in full before starting the assembly process.
WHEELIE BIN STORE (STANDARD): Different views showing assembly parts
Standard Wheelie Bin Store (Closed Position)
Standard Wheelie Bin Store (Open Position)
`
Left Hand
Door Right Hand
Door
Right Hand
Side Panel
Left Hand
Top Cover Right Hand
Top Cover
Back Panel
Door Handles
+
Door Latches
Tie Bar
Bottom
Tie-Bar
Top
Left Hand
Top Cover Right Hand
Top Cover
Left Hand
Side Panel
Door
Latches

Jacksons Fencing Head Office, Stowting Common, Ashford, Kent, TN25 6BN
+44 (0) 1233 750393 | www.jacksons-fencing.co.uk |info@jacksons-fencing.co.uk
DRB approved (ACT) 28/03/2019 JFW 40 Issue 08 Page 3 of 9
Step 2: Fix both the Side Panels (Left and Right hand) to the Back panel using screws M5 x 90mm
provided at the positions circled in RED below from both ends . All timber components are labelled,
attached to the Top End of each component. Also both Side Panels are marked for Tie Bars & Front Door
hinges on one end. Marking on the Left Hand Side Panel are shown below. Back Panel must be fixed to
the other end of the Side Panels. Also Back Panel has marking for the Top Cover hinges which must be
on the top side of the panel.
Step 3: Fix both the Tie Bars (Top & Bottom) to the Side Panels using M5 x 45mm screws. The fixing
positions of the Tie Bars are marked on the both Side Panels as explained above. Top Tie Bar has a plate
attached to it in the middle as shown below.
Right Hand
Side Panel
Back Panel
Right Hand
Side Panel
Marked positions for
Top Cover Hinges
Left Hand Side Panel
TOP
2 No’s diagonally
marked positions
for TOP Tie-Bar
Marked Positions
for Left Hand
Door Top Hinge
Marked Positions
for Left Hand Door
Bottom Hinge
1 No. marked
Position for
Bottom Tie-Bar
Bottom Tie Bar
2 No’s M5 x
45mm screws for
each end of TOP
Tie Bar
1 No M5 x
45mm screw
for each end of
Bottom Tie Bar
Left Hand Side Panel
BOTTOM
Top Tie Bar

Jacksons Fencing Head Office, Stowting Common, Ashford, Kent, TN25 6BN
+44 (0) 1233 750393 | www.jacksons-fencing.co.uk |info@jacksons-fencing.co.uk
DRB approved (ACT) 28/03/2019 JFW 40 Issue 08 Page 4 of 9
Step 4: Fix the Doors (Left Hand & Right Hand) to the Side Panels using M4 x 25mm screws. The Front
Doors hinge positions are marked on the Side Panels as shown above in Step2.
Step 5: Fix the Door latches to the Top Tie Bar as shown below. The positions of the latches can be
adjusted to suit the holes in the Doors.
Step 6: Now close both doors and hold in place by latches. If the surface is flat, the top of both doors
should be aligned and will have a 10-15mm gap between them (as shown below) to avoid rubbing against
each other while opening and closing. If door tops are not aligned, use suitable packers e.g. washers etc.
as required under a corner of the store to align them.
Left Hand
Door Right Hand
Door
Door
Latches
10-15mm Gap
between doors in
closed position
Top of Both doors
aligned

Jacksons Fencing Head Office, Stowting Common, Ashford, Kent, TN25 6BN
+44 (0) 1233 750393 | www.jacksons-fencing.co.uk |info@jacksons-fencing.co.uk
DRB approved (ACT) 28/03/2019 JFW 40 Issue 08 Page 5 of 9
Step 7: Fix the Door Handles with M4 x 25mm Screws. The positions for Door Handles are marked on
both the doors as shown below.
Step 8: Fix the both Top Covers (Left and Right hand) to the Back Panel using M4 x 25mm screws. The
Top Cover hinge positions are marked on the Back Panel as explained in Step2. Fix the chains attached
to the Top Covers to the respective Side Panels using M4 x 40mm screws with screw caps. The positions
where the chains are required to be fixed are marked on both side panels.
This will complete the assembly of the Standard WHEELIE BIN STORE.
Marked Positions
for Door Handles
Door Handles
Left Hand
Top Cover
Right Hand
Top Cover
Chain fixed to the
Right Hand Side
Panel at the
marked position

Jacksons Fencing Head Office, Stowting Common, Ashford, Kent, TN25 6BN
+44 (0) 1233 750393 | www.jacksons-fencing.co.uk |info@jacksons-fencing.co.uk
DRB approved (ACT) 28/03/2019 JFW 40 Issue 08 Page 6 of 9
Additional Store:
It is important to note that if an additional store is bought separately, the Top Cover provided is to be
exchanged with the Right Hand Top Cover of the main Wheelie Bin Store when viewed from front to give
same overhang on each side.
Once the main store has been built, check it is square and sitting on a level base, before starting on the
Additional Bin Store. The Additional Store is designed to be installed to the right of the main store. There
is a risk of distorting the structure if the Additional Store is added to the left, as the Additional Door would
have to be hung off the Additional Side Panel.
Assembly Parts List (For Additional Wheelie Bin Store)
PARTS LIST
S# Description Qty
Timber Components
1 Additional Store Back Panel 01
2
Additional Store Right Hand Side
Panel
01
3 Additional Store Door 01
4 Additional Store Top Cover 01
5 Shelf (optional) 01
Metal Components
8 Tie- Bar (Top) 01
9 Tie- Bar (Bottom) 01
10 Door Handle 01
11 Door Latch 01
Fittings & Tools:
12 M5 x 90mm Screws 05
13 M4 x 25mm Screws 12
14 Screw Caps 02
15 M5 x 45mm Screws 06
16 M4 x 40mm Screws 01
17 M4 x 25mm Screws 04
18 M5x 60mm Screws (optional) 04
18 T25 Drive Bit 01
19 Pozi Drive Bit 01
ADDITIONAL WHEELIE BIN STORE:
Different views showing assembly parts
Tie Bar
Bottom
Note: All timber components are labelled.
Labels are attached to the Top End of each
component e.g. the following picture shows an
Additional Store Door with label attached to the
Top End.
Tie Bar
Top
Additional
Front Door
Top Cover provided
with Additional Bin
Store
Right Hand Top Cover
provided with Standard
Wheelie Bin Store
Tie Bar
Bottom
Tie Bar
Top
Additional
Side Panel
(Closed Position)
(Open
Position)

Jacksons Fencing Head Office, Stowting Common, Ashford, Kent, TN25 6BN
+44 (0) 1233 750393 | www.jacksons-fencing.co.uk |info@jacksons-fencing.co.uk
DRB approved (ACT) 28/03/2019 JFW 40 Issue 08 Page 7 of 9
Assembly Instructions:
It is also important to note that the Additional store is also required to be assembled on a FLAT
SURFACE.
Step 1: Check that all the assembly parts are provided as stated above including fittings. Read and
understand the instructions in full before starting the assembly process.
Step 2: Remove the Right Hand Top Cover of the assembled Standard Wheelie Bin Store if Additional Bin
Store is required to be added latter. Fix the Additional Back Panel to the rear right hand corner of the
store using 2 no M5 x 90 screws as shown by the markings shown as Red circles below.
Step 3: Fix the Additional Side Panel to the Additional Back Panel using 3 no M5 x 90mm screws.
Looking from the inside of the Additional Bin Store the Additional Side Panel has a marking for the Tie
Bars on the right hand corner. Make sure that markings are at the right place when positioning the
Additional Side Panel.
Right Hand Top
Cover for Standard
Bin Store to be
removed or not
fitted
Additional
Back Panel
Additional
Side Panel
1 No. marked
position for
Additional
Bottom Tie-Bar
2 No's
diagonally
marked
position for
Additional Top
Tie
-
Bar

Jacksons Fencing Head Office, Stowting Common, Ashford, Kent, TN25 6BN
+44 (0) 1233 750393 | www.jacksons-fencing.co.uk |info@jacksons-fencing.co.uk
DRB approved (ACT) 28/03/2019 JFW 40 Issue 08 Page 8 of 9
Step 4: Fix both the Tie bars (Top & Bottom) to the Side Panels using M5 x 45mm screws. The fixing
positions of the tie bars are marked on the Additional Side Panel (as shown in Step3), but are not marked
on the original right hand side panel of the Standard Wheelie Bin Store. The Top Tie Bar has a receiver
plate attached to it on the right hand end. Fix the Door Latch to the Tie Bar.
Step 5: Fix the Additional Bin Door to the original Side Panel using M4 x 25mm screws. The Front Door
hinge positions are NOT marked on this Side Panel so care must be taken to line up the door with the one
next to it on the main store. Fix the Door Handle with the M4x25 screws. The positions for Door Handle
are marked on the Additional Bin Door as shown below.
Step 6: Fix the Top Cover to the Additional Back Panel using M4 x 25mm screws. Note that the Top
Cover supplied with the Additional Store is narrower than the main store Top Cover and to be exchanged
with Right Hand Top Cover of the main store when viewed from the front to give same overhang on each
side. The Top Cover Hinge positions are not marked on the Back Panel. Fix the chain attached to the Top
Cover to the Side Panel using M4 x 40mm screws. The positions are shown as on the main store.
Tie-Bar
Bottom
Tie-Bar Top
Additional
Door Latch
Additional
Bin Door
Door
Handle
Marked Positions
for Door Handle

Jacksons Fencing Head Office, Stowting Common, Ashford, Kent, TN25 6BN
+44 (0) 1233 750393 | www.jacksons-fencing.co.uk |info@jacksons-fencing.co.uk
DRB approved (ACT) 28/03/2019 JFW 40 Issue 08 Page 9 of 9
This will complete the assembly of the Additional Wheelie Bin Store.
Standard Wheelie Bin Store with Additional Unit
Open Position Closed Position
Additional Store Shelf (Optional):
Please note that shelf can only be fitted to the Additional Store because the main unit does not have a
mid-panel to support any shelf.
The shelf can be positioned above the mid-rail on the additional side panels and screwed down into the
mid-rail with the M5 x 60mm screws. On the left side and in positions where there is no mid-rail to support
the shelf, hold the shelf at the desired height and mark the positions of the shelf support battens which
run front to rear. Measure the positions of these on the opposite face and screw through the side panels
into the shelf support battens to fix the shelf in.
Safety Notes:
Biocidal Products Regulation (EU528/2012):
Jakcured articles incorporate biocidal products to protect against wood destroying organisms.
Active ingredients include: Copper(II)Carbonate / Copper(II)Hydroxide (1:1) / Propiconazole /
Tebuconazole / N,N-Didecyl-N,N-dimethylammonium Carbonate/Bicarbonate
Wear gloves when handling treated timber. Avoid inhalation of sawdust when cutting timber. Do not use in
contact with drinking water or for direct food contact. Do not use for animal bedding, in fish ponds or for
sheet piling (canal banks). Dispose of treated wood / off-cuts responsibly – do not burn.
Additional Shelf
(Optional)
Table of contents
Popular Outdoor Furnishing manuals by other brands

Outsunny
Outsunny 840-193 840-193V01 Assembly & instruction manual

Yardistry
Yardistry YM11635 Installation and operating instructions

Mimosa
Mimosa Signature Silverleaves 3192437 quick start guide

Grange
Grange ELITE GRANVILLE ARCH quick guide

Safavieh Outdoor
Safavieh Outdoor Diona PAT7510 manual

Forever Redwood
Forever Redwood MODERN LOUVERED GARDEN PERGOLA Assembly instructions

Daisy
Daisy Under Bench Roller installation instructions

Broyhill
Broyhill ASHFORD Assembly instructions

Hofzelt
Hofzelt Fargo HFZP01019 owner's manual

Sunnydaze Decor
Sunnydaze Decor SSS-758 quick start guide

Essential Garden
Essential Garden L-GG076PST Use and care guide

Times Square
Times Square JHF663 quick start guide