RECOMMENDED TOOLS: Tape measure, Level, Pencil, Electrical drill, Stud finder, Hammer, and Clamps
PACKAGE CONTENTS
2 Floor-To-Ceiling frames (Top + Bottom)
Screws
INSTALLATION STEPS
IMPORTANT: When securing the FTC to a location, use the appropriate mounting
fasteners. There are 4 fastener locations on the top and bottom brackets.
STEP 1: MARK SCREW HOLES
Mark the screw holes for the mounting brackets in the desired mounting location.
STEP 2: MEASURE CEILING HEIGHT
Measure the ceiling height in the location you will mount the frame.
STEP 3: MAKE CALCULATIONS
Calculate the height of your ceiling, then subtract the height of the top frame to give
you the measurements for your bottom rail.
STEP 4: MARK BOTTOM FRAME
Mark the bottom frame to determine the cut location.
STEP 5: CUT FRAME
Cut the frame in marked location using a metal-cutting hack
saw.
Note: Do not use a metal cut off wheel as the heat will damage
the product.
STEP 6: CONNECT THE TOP AND BOTTOM FRAMES
Drill holes on the bottom frame, and then use the hardwares to
connect the TOP and BOTTOM frames. Ensure that the holes
for the TOP and BOTTOM frames are lined up in the desired
location.
PRO TIP: Pre-drill holes before installing the Floor-to-Ceiling
mount.
STEP 7: MOUNT BRACKETS
Mount the brackets to the ceiling then the floor using the
appropriate anchors. Do not over-tighten.
STEP 8: MOUNT RAILS
Mount rails to frame. Use all mounting holes to fasten rails
securely.
PRO TIP: Adjust the rails positions if necessary. Use clamps to
hold rails in place while mounting.
To achieve the ideal horizontal level of your
bottle collection, please adjust the
positions of the left and right rails to
accommodate the unique shapes and sizes
of your bottles.