
Figures
1. Storage block . . . . . . . . . . . . . . 2
2. Co pute block. . . . . . . . . . . . . . 2
3. CP Interconnect . . . . . . . . . . . . . 3
4. Manage ent switch . . . . . . . . . . . . 3
5. Storage block co ponents . . . . . . . . 11
6. Co pute block co ponents . . . . . . . 13
7. ThinkAgile CP hardware installed into a
rack . . . . . . . . . . . . . . . . . 19
8. ThinkAgile CP storage slide box
contents . . . . . . . . . . . . . . . 23
9. Screw pin types included with rail kit . . . . 24
10. Installing the rail in a round hole rack . . . . 25
11. Installing the rail in a square hole rack . . . . 27
12. Re oval of side cover . . . . . . . . . . 29
13. Installing the enclosure into the rack . . . . 30
14. Installing screws on front of enclosure . . . . 30
15. Reinstalling the side cover . . . . . . . . 31
16. ThinkAgile CP co pute slide rails box
contents . . . . . . . . . . . . . . . 32
17. Slide rails . . . . . . . . . . . . . . . 33
18. Left slide rear installation . . . . . . . . . 33
19. Left slide front installation. . . . . . . . . 34
20. Securing the co pute block slide rails. . . . 34
21. Front latches on slide rails . . . . . . . . 35
22. ThinkAgile CP co pute enclosure
installation . . . . . . . . . . . . . . 36
23. Enclosure installation into rack. . . . . . . 36
24. Co pute enclosure thu bscrews . . . . . 37
25. Attaching ounting brackets to switch . . . 44
26. Securing switch to rack posts . . . . . . . 44
27. Installing power cord retention clip . . . . . 45
28. Hardware anage ent network connectivity
in a single interconnect configuration . . . . 47
29. Single—interconnect configuration — co pute
node and network interconnect
connections . . . . . . . . . . . . . . 48
30. Single—interconnect configuration —
storage block and network interconnect
connections . . . . . . . . . . . . . . 49
31. Custo er data center connection: single
direct link . . . . . . . . . . . . . . . 50
32. Single direct link topology . . . . . . . . 51
33. Custo er data center connection: dual direct
link . . . . . . . . . . . . . . . . . 52
34. Dual direct link topology . . . . . . . . . 53
35. Custo er data center connection: LAG
direct link . . . . . . . . . . . . . . . 54
36. LAG direct link topology . . . . . . . . . 55
37. Hardware anage ent network connectivity
in a dual—interconnect configuration . . . . 56
38. Dual—interconnect configuration —
co pute node and network interconnect
connections . . . . . . . . . . . . . . 58
39. Dual—interconnect configuration — storage
block and network interconnect
connections . . . . . . . . . . . . . . 59
40. Dual-interconnect configuration — inter-
interconnect link network connectivity . . . . 59
41. Custo er data center network
connection . . . . . . . . . . . . . . 60
42. X-Link option 1 topology . . . . . . . . . 62
43. Custo er data center network
connection . . . . . . . . . . . . . . 63
44. X-Link topology option 2A . . . . . . . . 65
45. Custo er data center network
connection . . . . . . . . . . . . . . 66
46. X-Link option 2B topology . . . . . . . . 68
© Copyright Lenovo 2018, 2020 iii