
Page 1 of 4
© 2021 Leotek Electronics USA LLC. SAFEGUARD_Installaon Guide_11-1-2021
Step 3 - Loosen the slip-er bracket bolts and insert the mounng arm. The
maximum outside diameter for the mounng arm is 2-3/8” (60.3mm). The
minimum outside diameter for the mounng arm is 1-5/8” (41.28mm).
Mounng arm to be placed “stopped” against appropriate step required
to achieve desired degree of lt. Steps vary from from 0o to 2.5o.
This procedure is designed as an installaon aid. Skilled tradespeople that are familiar with general construcon and electrical installaon
techniques should perform the installaon. Licensed electricians should provide electrical installaon connecons. Installaons and
connecons should be done in accordance with all naonal and local codes and permits. In no way is this document intended to construe
warranty or tness of use of the products described, nor is it intended to provide safety instrucon for those installing the product.
WARNING
Before proceeding with installaon or service maintenance of this product:
• Disconnect power to reduce electrical shock risk.
• Review the enre Installaon Guide.
• Inspect this properly packaged product for any damage that may have occurred during transit.
• Verify product applicaon complies with manufacturer design recommendaons.
• Verify the availability of necessary tools and incidental material.
• Verify applicable code requirements. Field assembly and installaon are subject to acceptance by local inspecon authority.
• Appropriate safety equipment to be determined by end user, per applicable safety standards and precauons.
SafeguardTM UTL Ulity Light Installaon Guide
Step 1 - Pull forward on the retaining clip to unfasten the door latch.
Luminaire Installaon
Step 2 - Li the door and pull it open to access internal components.
Complete product documentaon
available online at:
hps://leotek.com/lighng-library/
Informaon provided subject to change without noce.
Leotek Electronics USA LLC | 1955 Lundy Avenue | San Jose, CA 95131
408.380.1788 | www.leotek.com